Tue Jul 19 11:54:03 2016, JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt , Photos of the AIDA insertion hole with the 3He tubes  
|
RIKEN tubes on the AIDA side with the SHV right angle connector will protrude
by ~95mm in the HYBRID configuration (with CLOVERS).
In the current AIDA DSSD configuration there are six detectors occupying 45-50mm
|
Tue Jul 19 04:34:57 2016, JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt , Photos of the electronics 9x
|
Racks, crates, rear part of the preamps and matrix with all tubes. |
Tue Jul 19 04:09:32 2016, JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt , Last tube fit in the matrix!!!
|
The photo of great moment |
Tue Jul 19 03:19:34 2016, A. Tarifeņo, I. Dillman, J. Agramunt, A. Tolosa, J.L. Tain..., Electronics   
|
Preamplifier and signal cable testing
We check all signal cables,the flat cable connector to BNC
|
Mon Jul 18 19:01:36 2016, J.L. Tain, 3He tubes
|
Adjustment of HV and PA gain
We adjust the HV for each tube type and the gain of the preamplifier (PA) in order
|
Mon Jul 18 18:40:32 2016, A. Tarifeņo-Saldivia and J. L. Tain, 3He tubes - Testing 7x
|
Test of individual 3He tubes
The tests were done using the ATOMKI MCA and
|
Mon Jul 18 09:32:50 2016, Shintaro Go, HV controls
|
You can start applying HVs on the detectors using macro on the control-computer.
If you have already signed in the computer that controls mpod,
1. Type http://192.168.13.239/ to monitor the status of HV. |
Fri Jul 15 11:47:31 2016, Nathan Brewer and Alvaro Tolosa, Preliminary Ge Calibration, Resolution and Configuration 9x
|
Today several tests (3) were done with the germanium detectors with the voltage configuration listed in the previous entry.
The tests were as follows:
Tests with 60Co+137Cs sources |
Fri Jul 15 08:29:14 2016, Nathan Brewer, Shintaro Go, Expected Performance and Voltage Setting for Germanium
|
Expected Resolution:
------------------------------
G7 should be ~2.0 keV FWHM at 600 keV for all crystals. |
Sat Jul 9 21:26:25 2016, J.L. Tain, EDACQ
|
Electronics and DACQ for July 2016 assembly: hardware and connections |
Sat Jul 9 21:21:38 2016, J.L. Tain, 3He tubes 
|
Tube distribution in the moderator, pre-amplifiers and digitizers |
Sat Jul 9 21:14:12 2016, J.L. Tain, 3He tubes   
|
Drawings and specs of 3He tubes |
Sat Jul 9 21:08:08 2016, J.L. Tain, Neutron moderator  
|
Drawings of the polyethylene neutron moderator and table assembly |
Sat Jul 9 21:00:54 2016, J.L. Tain, Hardware 
|
A list of the available hardware |
Sat Jul 9 20:44:31 2016, J.L. Tain, BRIKEN neutron detector
|
START
Assembly and commissioning of BRIKEN neutron detector
|
Mon May 11 09:14:54 2015, G. Kiss, 252Cf_data_sheet
|
The activity of the 252Cf source, used for the calibration was 3.7 MBq at 15.05.2006. Unfortunately, uncertainty is missing from the data sheet :-( |
Fri May 8 03:20:48 2015, J.Agramunt J.L.Tain K.Gabor, BnCorrelation
|
We run all the night until the end of beam time, and the Bn correlations are more clear now. |
Thu May 7 08:36:56 2015, J.L. Tain, J. Agramunt, A. Estrade, G.Kiss, T. Davinson, C.Griffin, First BRIKEN_v.0 beta-delayed neutron correlations?
|
During the 98,100Kr setting run we observe
in the time correlation plot (middle right panel)
of beta signals (marked by AIDA, with amplitude larger than ch=600)
|
Wed May 6 11:41:24 2015, J. Agramunt, A. Estrade, First online combined analysis
|
Screen shot of the rudimentary on-line
analysis of the combined data:
BRIKEN-AIDA-BigRIPS
|
Wed May 6 05:10:14 2015, J.L. Tain, J. Agramunt, G. Kiss, 94Se setting measurement
|
After the long shutdown the beam is back at 00:30 (06/05)
Intensity is slightly lower 26pnA and somewhat unstable (short time)
Measurement in the morning:
|