AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 5 of 21  ELOG logo
Entry  Sat Oct 21 17:14:55 2017, JA, ATD, JLT, 252Cf efficiency calibration Screenshot_from_2017-10-22_01-21-51.png
Measurement of BRIKEN neutron counter efficiency
252Cf source in the (approximately) center
Wasabi and D4 clover inserted. G7 on the floor.
Entry  Sat Oct 21 17:11:03 2017, JA, ATD, JLT, New Gasific configuration file 171022_Conf_BrikenFullYSO.xlsx
Configuration file saved on 22-Oct-2017 at 00:59
after increasing all the threshold in all 3He tubes to about 100keV.
Also the threshold of Clover detectors was slightly increased.
Entry  Sat Oct 21 17:05:21 2017, JA,ATD, JLT, New DACQ hardware configuration TubeAncillaryDACQDistribution-October2017.xlsx
Configuration of BRIKEN DACQ hardware:
Detector->VME->ADC->Channel
Entry  Sat Oct 21 07:26:13 2017, NB, RY, BD, MS, Corrected Calibration D4 D4Oct19.ods
  K R G B
m 0.001558636 0.0006599344 0.0015311753 0.0015807021
b -0.6545742444 0.4330534066 2.001278013 1.0994163913
Entry  Sat Oct 21 04:18:17 2017, NB, Draft of Instructions for HV 
Setup:

2 MPOD + cards with 8 channels each one where the 10 BRIKEN PA are connected.

1 MPOD + card with 8 possible inputs
Entry  Fri Oct 20 08:27:05 2017, BC Rasco, Analysis Slides PreliminaryPnCalcsWithBkgCoin_BRIKENGroup.pdf
Here are the ORNL/UTK BRIKEN analysis slides presented by BC Rasco on 2017/10/20.

 

Enjoy the fine reading.
Entry  Fri Oct 20 05:33:11 2017, KR, NB, SG, RY, JL, AT: , Calibration and Resolution of D4 (after Repair)  IMG_20171019_105549066.jpgD4Oct19.ods
Green and Red channels were repaired by crimping and securing the grounding of the cables and fixing the cables securely to the table. 

All problems during the repair process were visible on the scope. See example attatched. 

Calibration is as:
Entry  Wed Oct 18 08:46:23 2017, NB, SG, AT, JL, Clover G7 resolution 171018_1627_152Eu_G7.root
G7 clover was on the stand
Source: 152Eu
File: 171018_1627_152Eu_G7.root
Entry  Mon Oct 16 05:52:14 2017, BRIKEN collaboration, START preparation 171016_Conf_BrikenFull.xlsx
We start to check every thing for the coming run

New directory: /data/1710Preparation/
Entry  Thu Jun 15 10:07:56 2017, BRIKEN collaboration, Gamma calibrations WhatsApp_Image_2017-06-15_at_18.00.36.jpegWhatsApp_Image_2017-06-15_at_18.00.51.jpegWhatsApp_Image_2017-06-15_at_18.37.12.jpeg
Clover calibrations. 

- Datafiles are located in the dac computer, path:

/data/1706FinalCalibrations/GammaCalibration
Entry  Thu Jun 15 03:40:17 2017, BRIKEN collaboration, Z-scaning 252Cf Jun17 WhatsApp_Image_2017-06-15_at_18.11.52.jpeg
A scaning with 252Cf along the Z-axis of the neutron detector is carried out. The setup is similar to the scaning carried out in October 2016.

Observations:

- Clovers are put inside the detector without voltage.
Entry  Wed Jun 14 06:22:21 2017, Ariel, Liu, Go, Nishinmura, HV is off 
To protect HPGe and 3He tubes from high intentsity primary beam, HV of these detector are off and the HPGe will be dismounted.
Entry  Tue Jun 13 08:02:35 2017, briken team, 133Ba calibration 
After experiment 133Ba calibration

Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx
Entry  Tue Jun 13 07:35:35 2017, briken team, 133Ba calibration 
After experiment 133Ba calibration

Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx
Entry  Tue Jun 13 06:50:12 2017, Briken Colaboration, 152Eu calibration 170604_Conf_BrikenFull_AfterCrisis.xlsx
After experiment 152Eu calibration

Entry  Tue Jun 13 05:18:07 2017, PV, How to install ELOG for BRIKEN campaign 2017a  
Get ELOG software including entries for BRIKEN campaign 2017a from mars computer:

briken@mars:/data01/2017data/briken/ur17a/elogBRIKEN2017a.tar.gz
Entry  Mon Jun 12 22:28:02 2017, Oscar, The SUSHIRO app guide SUSHIRO_For_Dummies_V001.pdf
It's here...it's rough...but it hopefully gets the job done
Entry  Mon Jun 12 02:45:44 2017, Iris Dillmann AT, Setup detectors. Id of Ancillary@BRIKEN Setup-26May2017.pngOfflineConf_Signals.csv
Attachment 1: Setup detectors 
Attachment 2: example of configuration file (valid only for RIBF127). The Id of the ancillary detectors are:
Entry  Mon Jun 12 02:38:27 2017, JA AA AIM AT AT, VME crate & new configuration 170603_Conf_BrikenFull.xlsx
Sun Jun 4 2017 11:16:45 VME crate #1 crashed
New configuration file of BRIKEN
Entry  Mon May 29 07:06:56 2017, K. Matsui, Energy loss in Long Plastic Scintillator 
After Al degrader with the optimized width of 13 mm, the energy loss in Long Plastic Scintillator is 546(2) MeV at F11.

This value depends on 
ELOG V3.1.4-unknown