Sat Oct 21 17:14:55 2017, JA, ATD, JLT, 252Cf efficiency calibration
|
Measurement of BRIKEN neutron counter efficiency
252Cf source in the (approximately) center
Wasabi and D4 clover inserted. G7 on the floor.
|
Sat Oct 21 17:11:03 2017, JA, ATD, JLT, New Gasific configuration file
|
Configuration file saved on 22-Oct-2017 at 00:59
after increasing all the threshold in all 3He tubes to about 100keV.
Also the threshold of Clover detectors was slightly increased. |
Sat Oct 21 17:05:21 2017, JA,ATD, JLT, New DACQ hardware configuration
|
Configuration of BRIKEN DACQ hardware:
Detector->VME->ADC->Channel
|
Sat Oct 21 07:26:13 2017, NB, RY, BD, MS, Corrected Calibration D4
|
K R G B
m 0.001558636 0.0006599344 0.0015311753 0.0015807021
b -0.6545742444 0.4330534066 2.001278013 1.0994163913
|
Sat Oct 21 04:18:17 2017, NB, Draft of Instructions for HV
|
Setup:
2 MPOD + cards with 8 channels each one where the 10 BRIKEN PA are connected.
1 MPOD + card with 8 possible inputs |
Fri Oct 20 08:27:05 2017, BC Rasco, Analysis Slides
|
Here are the ORNL/UTK BRIKEN analysis slides presented by BC Rasco on 2017/10/20.
Enjoy the fine reading. |
Fri Oct 20 05:33:11 2017, KR, NB, SG, RY, JL, AT: , Calibration and Resolution of D4 (after Repair) 
|
Green and Red channels were repaired by crimping and securing the grounding of the cables and fixing the cables securely to the table.
All problems during the repair process were visible on the scope. See example attatched.
Calibration is as: |
Wed Oct 18 08:46:23 2017, NB, SG, AT, JL, Clover G7 resolution
|
G7 clover was on the stand
Source: 152Eu
File: 171018_1627_152Eu_G7.root
|
Mon Oct 16 05:52:14 2017, BRIKEN collaboration, START preparation
|
We start to check every thing for the coming run
New directory: /data/1710Preparation/
|
Thu Jun 15 10:07:56 2017, BRIKEN collaboration, Gamma calibrations  
|
Clover calibrations.
- Datafiles are located in the dac computer, path:
/data/1706FinalCalibrations/GammaCalibration |
Thu Jun 15 03:40:17 2017, BRIKEN collaboration, Z-scaning 252Cf Jun17
|
A scaning with 252Cf along the Z-axis of the neutron detector is carried out. The setup is similar to the scaning carried out in October 2016.
Observations:
- Clovers are put inside the detector without voltage. |
Wed Jun 14 06:22:21 2017, Ariel, Liu, Go, Nishinmura, HV is off
|
To protect HPGe and 3He tubes from high intentsity primary beam, HV of these detector are off and the HPGe will be dismounted. |
Tue Jun 13 08:02:35 2017, briken team, 133Ba calibration
|
After experiment 133Ba calibration
Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx |
Tue Jun 13 07:35:35 2017, briken team, 133Ba calibration
|
After experiment 133Ba calibration
Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx |
Tue Jun 13 06:50:12 2017, Briken Colaboration, 152Eu calibration
|
After experiment 152Eu calibration
|
Tue Jun 13 05:18:07 2017, PV, How to install ELOG for BRIKEN campaign 2017a
|
Get ELOG software including entries for BRIKEN campaign 2017a from mars computer:
briken@mars:/data01/2017data/briken/ur17a/elogBRIKEN2017a.tar.gz
|
Mon Jun 12 22:28:02 2017, Oscar, The SUSHIRO app guide
|
It's here...it's rough...but it hopefully gets the job done |
Mon Jun 12 02:45:44 2017, Iris Dillmann AT, Setup detectors. Id of Ancillary@BRIKEN 
|
Attachment 1: Setup detectors
Attachment 2: example of configuration file (valid only for RIBF127). The Id of the ancillary detectors are:
|
Mon Jun 12 02:38:27 2017, JA AA AIM AT AT, VME crate & new configuration
|
Sun Jun 4 2017 11:16:45 VME crate #1 crashed
New configuration file of BRIKEN
|
Mon May 29 07:06:56 2017, K. Matsui, Energy loss in Long Plastic Scintillator
|
After Al degrader with the optimized width of 13 mm, the energy loss in Long Plastic Scintillator is 546(2) MeV at F11.
This value depends on |