AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 5 of 21  ELOG logo
Entry  Fri Mar 31 05:27:44 2017, OH,SN,JA,PV, 40Mg run 36 
Date: 31/03/2017
Start: 13:24
BRIKEN run: 036
Entry  Tue Oct 31 06:57:53 2017, OH, TD, AIDA Oct17 Beam Test Analysis AIDA_Test_Results.pdf
PDF file attached with the preliminary analysis of the October 2017 AIDA in beam test.
Entry  Fri Mar 31 07:17:03 2017, OH PV JA CG, Run 37 
Date: 31/03/2017
Start: 15:24
BRIKEN run: 037
Entry  Thu Nov 3 14:02:49 2016, Nepal, J Ha, PV, Liu J, The degrader system has been set IMG_1318.JPGIMG_1317.JPG
We used the laser to align the degrader (see attached photos)

According to the LISE calculation, equivalent effective thickness for 6 mm of Carbon target is 4.5 mm thick Aluminum.

Therefore, we've set the degrader system as follow:
Entry  Fri Jul 15 08:29:14 2016, Nathan Brewer, Shintaro Go, Expected Performance and Voltage Setting for Germanium 
Expected Resolution:
------------------------------
G7 should be ~2.0 keV FWHM at 600 keV for all crystals.
Entry  Fri Jul 15 11:47:31 2016, Nathan Brewer and Alvaro Tolosa, Preliminary Ge Calibration, Resolution and Configuration 9x
Today several tests (3) were done with the germanium detectors with the voltage configuration listed in the previous entry.
The tests were as follows:
Tests with 60Co+137Cs sources
Entry  Mon Nov 7 06:55:01 2016, NTB, SG, HPGe Fill line to D4 replaced 
HPGe fill line to D4 replaced only small leak (overflow) once Ge is full.

Solenoid was also wrapped to no effect. AIDA DAQ still stops writing.

Boron sheet and extra polyethylene were placed back on top.
Entry  Tue Nov 8 17:00:27 2016, NTB, CG, AT, Si Delta E 
At least during the timeframe in between ~ 21:30 (11/08) - 23:30 (11/09) (161108_2323_717273Ni.root) we see that the silicon dE have a very low counting
rate. ~1Hz when the first AIDA detector sees ~600 Hz and a cumulative ~2kHz. The energy range in the dE stops at ~10MeV.

Edit: It appears the Si dE were removed. Some signals are still in the spectra.
Entry  Thu Aug 18 22:39:35 2016, NT Brewer, New preamps arrived at Oak Ridge and tested working. IMG_20160818_145801.jpg
Collaborators,

Attached is a phone photo of example signals from the new preamps with 3 3He tubes connected to a scope. Scope channels 1,2,3 (color y,c,m respectively)
are preamp channels 1,2,3 while 4 (green) is open. Trigger is on channel 3, at 500mV/div and other channels are at 500,200,and 20 mV/Div for channels 2,1,4
Entry  Thu Aug 18 23:32:59 2016, NT Brewer, New preamps arrived at Oak Ridge and tested working. IMG_20160818_145801.jpgIMG_20160803_160430.jpg
Collaborators,

Attached is a phone photo of example signals from the new preamps with 3 3He tubes connected to a scope. Scope channels 1,2,3 (color y,c,m respectively)
are preamp channels 1,2,3 while 4 (green) is open. Trigger is on channel 3, at 500mV/div and other channels are at 500,200,and 20 mV/Div for channels 2,1,4
Entry  Tue Nov 6 21:51:54 2018, NT Brewer, New D4Off.conf for HV also on github 



V A V/s V/s 1/0









------ ---------------
--------- ----- ---- ------- ------- ------ ------ -------------









0
192.168.13.239 0 0 PA1 1450 0.0001 50 10 1









0 192.168.13.239 1
Entry  Fri Oct 14 13:32:52 2016, NT BREWER, S Go, JM Allmond, Ge preamp power loss and solution.  
As previously recorded (81), on Thur Oct 13th, A NIM crate failure caused preamp power loss to the HPGe's. While D4 recovered with nominally the
same resolution as before. G7 would not recieve power to the preamps without an alarm from the NIM crate.

It was determined that there was a short along the lines of +12V and Ground , -12V and Ground, and between +-12V.
Entry  Wed Oct 18 08:46:23 2017, NB, SG, AT, JL, Clover G7 resolution 171018_1627_152Eu_G7.root
G7 clover was on the stand
Source: 152Eu
File: 171018_1627_152Eu_G7.root
Entry  Sat Oct 21 07:26:13 2017, NB, RY, BD, MS, Corrected Calibration D4 D4Oct19.ods
  K R G B
m 0.001558636 0.0006599344 0.0015311753 0.0015807021
b -0.6545742444 0.4330534066 2.001278013 1.0994163913
Entry  Sat Oct 21 04:18:17 2017, NB, Draft of Instructions for HV 
Setup:

2 MPOD + cards with 8 channels each one where the 10 BRIKEN PA are connected.

1 MPOD + card with 8 possible inputs
Entry  Wed Oct 25 19:14:09 2017, NB, First pass efficiency for current experiment 
I roughly (~10%) checked the efficiency for 4 of the peaks from  171025_1222_1355_152EuCloverCal.root.

I checked the peaks at 122, 245, 344, and 1408. The indication is an efficiency of 6.9,  9,   9,8, and 2.6 % for these gamma rays
repectively.
Entry  Tue Oct 11 15:47:45 2016, N Brewer, S Go et al, CLOVER IMG_20161011_182318.jpgIMG_20161011_182258.jpgD4-1st.pdfG7-1st.pdf
Both COVER detectors are installed in place.
See photos.
Entry  Tue Nov 8 12:51:08 2016, Many, 717273Ni  
After removing the lead wall.

Start: 21:45
Entry  Tue Nov 8 13:49:58 2016, Many, 71,72,73Ni 
F7 CH2 F11 Empty

We remove the 8mm Al plate from inside BRIKEN infront of AIDA
Entry  Tue Nov 8 14:28:54 2016, Many, 717273Ni run 
F7 CH2 F11 C-6mm
Total degrader thickness 6mm
ELOG V3.1.3-7933898