AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 5 of 21  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Subject Text Attachments
  248   Fri Mar 31 05:27:44 2017 OH,SN,JA,PV40Mg run 36Date: 31/03/2017
Start: 13:24
BRIKEN run: 036
  
  354   Tue Oct 31 06:57:53 2017 OH, TDAIDA Oct17 Beam Test AnalysisPDF file attached with the preliminary analysis
of the October 2017 AIDA in beam test.
 AIDA_Test_Results.pdf 
  249   Fri Mar 31 07:17:03 2017 OH PV JA CGRun 37Date: 31/03/2017
Start: 15:24
BRIKEN run: 037
  
  105   Thu Nov 3 14:02:49 2016 Nepal, J Ha, PV, Liu JThe degrader system has been setWe used the laser to align the degrader
(see attached photos)

According to the LISE calculation,
 IMG_1318.JPGIMG_1317.JPG 
  36   Fri Jul 15 08:29:14 2016 Nathan Brewer, Shintaro GoExpected Performance and Voltage Setting for GermaniumExpected Resolution:
------------------------------
G7 should be ~2.0 keV FWHM at 600
  
  37   Fri Jul 15 11:47:31 2016 Nathan Brewer and Alvaro TolosaPreliminary Ge Calibration, Resolution and ConfigurationToday several tests (3) were done with
the germanium detectors with the voltage
configuration listed in the previous entry.
 9x 
  126   Mon Nov 7 06:55:01 2016 NTB, SGHPGe Fill line to D4 replacedHPGe fill line to D4 replaced only small
leak (overflow) once Ge is full.

Solenoid was also wrapped to no
  
  145   Tue Nov 8 17:00:27 2016 NTB, CG, ATSi Delta EAt least during the timeframe in between
~ 21:30 (11/08) - 23:30 (11/09) (161108_2323_717273Ni.root)
we see that the silicon dE have a very low
  
  Draft   Thu Aug 18 22:39:35 2016 NT BrewerNew preamps arrived at Oak Ridge and tested working.Collaborators,

Attached is a phone photo of example
signals from the new preamps with 3 3He tubes
 IMG_20160818_145801.jpg 
  62   Thu Aug 18 23:32:59 2016 NT BrewerNew preamps arrived at Oak Ridge and tested working.Collaborators,

Attached is a phone photo of example
signals from the new preamps with 3 3He tubes
 IMG_20160818_145801.jpgIMG_20160803_160430.jpg 
  418   Tue Nov 6 21:51:54 2018 NT BrewerNew D4Off.conf for HV also on github


V A V/s
V/s 1/0









------
--------------- --------- ----- ---- -------
  
  88   Fri Oct 14 13:32:52 2016 NT BREWER, S Go, JM AllmondGe preamp power loss and solution. As previously recorded (81), on Thur Oct
13th, A NIM crate failure caused preamp power
loss to the HPGe's. While D4 recovered
  
  331   Wed Oct 18 08:46:23 2017 NB, SG, AT, JLClover G7 resolutionG7 clover was on the stand
Source: 152Eu
File: 171018_1627_152Eu_G7.root
 171018_1627_152Eu_G7.root 
  335   Sat Oct 21 07:26:13 2017 NB, RY, BD, MSCorrected Calibration D4  K R G B
m 0.001558636 0.0006599344 0.0015311753 0.0015807021
b -0.6545742444 0.4330534066 2.001278013 1.0994163913
 D4Oct19.ods 
  334   Sat Oct 21 04:18:17 2017 NBDraft of Instructions for HVSetup:

  
  351   Wed Oct 25 19:14:09 2017 NBFirst pass efficiency for current experimentI roughly (~10%) checked the efficiency
for 4 of the peaks from  171025_1222_1355_152EuCloverCal.root.

I checked the peaks at 122, 245,
  
  74   Tue Oct 11 15:47:45 2016 N Brewer, S Go et alCLOVERBoth COVER detectors are installed in place.
See photos.
 IMG_20161011_182318.jpgIMG_20161011_182258.jpgD4-1st.pdfG7-1st.pdf 
  141   Tue Nov 8 12:51:08 2016 Many717273Ni After removing the lead wall.

Start: 21:45
  
  142   Tue Nov 8 13:49:58 2016 Many71,72,73NiF7 CH2 F11 Empty

We remove the 8mm Al plate from inside BRIKEN
  
  143   Tue Nov 8 14:28:54 2016 Many717273Ni runF7 CH2 F11 C-6mm
Total degrader thickness 6mm
  
ELOG V3.1.4-unknown