ID |
Date |
Author |
Subject |
Text |
 |
248
|
Fri Mar 31 05:27:44 2017 |
OH,SN,JA,PV | 40Mg run 36 | Date: 31/03/2017
Start: 13:24
BRIKEN run: 036
|
|
354
|
Tue Oct 31 06:57:53 2017 |
OH, TD | AIDA Oct17 Beam Test Analysis | PDF file attached with the preliminary analysis
of the October 2017 AIDA in beam test. |
|
249
|
Fri Mar 31 07:17:03 2017 |
OH PV JA CG | Run 37 | Date: 31/03/2017
Start: 15:24
BRIKEN run: 037
|
|
105
|
Thu Nov 3 14:02:49 2016 |
Nepal, J Ha, PV, Liu J | The degrader system has been set | We used the laser to align the degrader
(see attached photos)
According to the LISE calculation, |
 |
36
|
Fri Jul 15 08:29:14 2016 |
Nathan Brewer, Shintaro Go | Expected Performance and Voltage Setting for Germanium | Expected Resolution:
------------------------------
G7 should be ~2.0 keV FWHM at 600 |
|
37
|
Fri Jul 15 11:47:31 2016 |
Nathan Brewer and Alvaro Tolosa | Preliminary Ge Calibration, Resolution and Configuration | Today several tests (3) were done with
the germanium detectors with the voltage
configuration listed in the previous entry. |
9x |
126
|
Mon Nov 7 06:55:01 2016 |
NTB, SG | HPGe Fill line to D4 replaced | HPGe fill line to D4 replaced only small
leak (overflow) once Ge is full.
Solenoid was also wrapped to no |
|
145
|
Tue Nov 8 17:00:27 2016 |
NTB, CG, AT | Si Delta E | At least during the timeframe in between
~ 21:30 (11/08) - 23:30 (11/09) (161108_2323_717273Ni.root)
we see that the silicon dE have a very low |
|
Draft
|
Thu Aug 18 22:39:35 2016 |
NT Brewer | New preamps arrived at Oak Ridge and tested working. | Collaborators,
Attached is a phone photo of example
signals from the new preamps with 3 3He tubes |
|
62
|
Thu Aug 18 23:32:59 2016 |
NT Brewer | New preamps arrived at Oak Ridge and tested working. | Collaborators,
Attached is a phone photo of example
signals from the new preamps with 3 3He tubes |
 |
418
|
Tue Nov 6 21:51:54 2018 |
NT Brewer | New D4Off.conf for HV also on github |
V A V/s
V/s 1/0
------
--------------- --------- ----- ---- ------- |
|
88
|
Fri Oct 14 13:32:52 2016 |
NT BREWER, S Go, JM Allmond | Ge preamp power loss and solution. | As previously recorded (81), on Thur Oct
13th, A NIM crate failure caused preamp power
loss to the HPGe's. While D4 recovered |
|
331
|
Wed Oct 18 08:46:23 2017 |
NB, SG, AT, JL | Clover G7 resolution | G7 clover was on the stand
Source: 152Eu
File: 171018_1627_152Eu_G7.root
|
|
335
|
Sat Oct 21 07:26:13 2017 |
NB, RY, BD, MS | Corrected Calibration D4 | K R G B
m 0.001558636 0.0006599344 0.0015311753 0.0015807021
b -0.6545742444 0.4330534066 2.001278013 1.0994163913
|
|
334
|
Sat Oct 21 04:18:17 2017 |
NB | Draft of Instructions for HV | Setup:
|
|
351
|
Wed Oct 25 19:14:09 2017 |
NB | First pass efficiency for current experiment | I roughly (~10%) checked the efficiency
for 4 of the peaks from 171025_1222_1355_152EuCloverCal.root.
I checked the peaks at 122, 245, |
|
74
|
Tue Oct 11 15:47:45 2016 |
N Brewer, S Go et al | CLOVER | Both COVER detectors are installed in place.
See photos.
|
   |
141
|
Tue Nov 8 12:51:08 2016 |
Many | 717273Ni | After removing the lead wall.
Start: 21:45
|
|
142
|
Tue Nov 8 13:49:58 2016 |
Many | 71,72,73Ni | F7 CH2 F11 Empty
We remove the 8mm Al plate from inside BRIKEN |
|
143
|
Tue Nov 8 14:28:54 2016 |
Many | 717273Ni run | F7 CH2 F11 C-6mm
Total degrader thickness 6mm
|
|