AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 5 of 21  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Text Attachments
  339   Sat Oct 21 17:30:23 2017 JA, ATD, JLTBackground measurement overnight22/10/2017
Start: 01:26
Run: 037
 Screenshot_from_2017-10-22_11-26-49.pngScreenshot_from_2017-10-22_11-26-10.pngScreenshot_from_2017-10-22_11-26-28.png 
  338   Sat Oct 21 17:14:55 2017 JA, ATD, JLT252Cf efficiency calibrationMeasurement of BRIKEN neutron counter efficiency
252Cf source in the (approximately) center
Wasabi and D4 clover inserted. G7 on the
 Screenshot_from_2017-10-22_01-21-51.png 
  337   Sat Oct 21 17:11:03 2017 JA, ATD, JLTNew Gasific configuration fileConfiguration file saved on 22-Oct-2017 at
00:59
after increasing all the threshold in all
 171022_Conf_BrikenFullYSO.xlsx 
  336   Sat Oct 21 17:05:21 2017 JA,ATD, JLTNew DACQ hardware configurationConfiguration of BRIKEN DACQ hardware:
Detector->VME->ADC->Channel
 TubeAncillaryDACQDistribution-October2017.xlsx 
  335   Sat Oct 21 07:26:13 2017 NB, RY, BD, MSCorrected Calibration D4  K R G B
m 0.001558636 0.0006599344 0.0015311753 0.0015807021
b -0.6545742444 0.4330534066 2.001278013 1.0994163913
 D4Oct19.ods 
  334   Sat Oct 21 04:18:17 2017 NBDraft of Instructions for HVSetup:

  
  333   Fri Oct 20 08:27:05 2017 BC RascoAnalysis SlidesHere are the ORNL/UTK BRIKEN analysis slides
presented by BC Rasco on 2017/10/20.

 
 PreliminaryPnCalcsWithBkgCoin_BRIKENGroup.pdf 
  332   Fri Oct 20 05:33:11 2017 KR, NB, SG, RY, JL, AT: Calibration and Resolution of D4 (after Repair) Green and Red channels were repaired by
crimping and securing the grounding of the
cables and fixing the cables securely to
 IMG_20171019_105549066.jpgD4Oct19.ods 
  331   Wed Oct 18 08:46:23 2017 NB, SG, AT, JLClover G7 resolutionG7 clover was on the stand
Source: 152Eu
File: 171018_1627_152Eu_G7.root
 171018_1627_152Eu_G7.root 
  330   Mon Oct 16 05:52:14 2017 BRIKEN collaborationSTART preparationWe start to check every thing for the coming
run
 171016_Conf_BrikenFull.xlsx 
  329   Thu Jun 15 10:07:56 2017 BRIKEN collaborationGamma calibrationsClover calibrations. 

- Datafiles are located in the
dac computer, path:
 WhatsApp_Image_2017-06-15_at_18.00.36.jpegWhatsApp_Image_2017-06-15_at_18.00.51.jpegWhatsApp_Image_2017-06-15_at_18.37.12.jpeg 
  328   Thu Jun 15 03:40:17 2017 BRIKEN collaborationZ-scaning 252Cf Jun17A scaning with 252Cf along the Z-axis of
the neutron detector is carried out. The
setup is similar to the scaning carried out
 WhatsApp_Image_2017-06-15_at_18.11.52.jpeg 
  327   Wed Jun 14 06:22:21 2017 Ariel, Liu, Go, NishinmuraHV is offTo protect HPGe and 3He tubes from high
intentsity primary beam, HV of these detector
are off and the HPGe will be dismounted.
  
  326   Tue Jun 13 08:02:35 2017 briken team133Ba calibrationAfter experiment 133Ba calibration

Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx
  
  325   Tue Jun 13 07:35:35 2017 briken team133Ba calibrationAfter experiment 133Ba calibration

Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx
  
  324   Tue Jun 13 06:50:12 2017 Briken Colaboration152Eu calibrationAfter experiment 152Eu calibration

 170604_Conf_BrikenFull_AfterCrisis.xlsx 
  323   Tue Jun 13 05:18:07 2017 PVHow to install ELOG for BRIKEN campaign 2017a Get ELOG software including entries for BRIKEN
campaign 2017a from mars computer:
  
  322   Mon Jun 12 22:28:02 2017 OscarThe SUSHIRO app guideIt's here...it's rough...but it hopefully
gets the job done
 SUSHIRO_For_Dummies_V001.pdf 
  321   Mon Jun 12 02:45:44 2017 Iris Dillmann ATSetup detectors. Id of Ancillary@BRIKENAttachment 1: Setup detectors 
Attachment 2: example of configuration file
(valid only for RIBF127). The Id of the ancillary
 Setup-26May2017.pngOfflineConf_Signals.csv 
  320   Mon Jun 12 02:38:27 2017 JA AA AIM AT ATVME crate & new configurationSun Jun 4 2017 11:16:45 VME crate #1 crashed
New configuration file of BRIKEN
 170603_Conf_BrikenFull.xlsx 
ELOG V3.1.4-unknown