AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 9 of 21  ELOG logo
Entry  Fri Mar 24 03:28:39 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, Background 170324_1040_BackgroundOvernight.pdf
Background measurement overnight

Start: 19:45
Entry  Thu Oct 6 14:50:30 2016, JL Tain, A Tolosa, A Tarifeno,..., 252Cf 252Cf-1st.pdf161006_2235_252Cf.pdf
First measurement with 252Cf source to check the calibration.
AIDA was in place so the source was at the right height
but displaced about 10cm from the center.
Entry  Thu Oct 6 14:43:47 2016, JL Tain, A Tarifeno, A Tolosa, J Agramunt, N Brewer, S Go, ..., Electronics 
We mount back all preamplifiers
Initially we used all the PA coming from US, the repaired and the new ones.
There was an issue with the new ones (strong noise and cross talk)
Entry  Fri Oct 7 08:35:15 2016, JL Tain et al, Noise noiseDifferentTubes2.pdf
Low amplitude noise component.

The figure shows the composition of the low amplitude noise
Entry  Fri Oct 7 10:42:52 2016, JL Tain et al, Noise ORNL-DiffPreamp.pdf
We investigate the effect on the noise in ORNL tubes of using a differential PA.

We connect the tubes in current PA10 (126-140) to one of the new diff PA
Entry  Sat Oct 8 01:18:51 2016, JL Tain et al, DACQ 
We increased the pretrigger delay for ADC5 from 350 to 400
Entry  Sun Oct 9 04:20:47 2016, JL Tain et al, Noise noHV.pdf161008_0642_noHV.pdf
We check for the appearance of spurious signals in the preamplifiers.

We set all HV to zero and run a measurement for several hours.
Entry  Sun Oct 9 15:49:41 2016, JL Tain et al, Power shutdown 
Due to maintenance operations of the Wako electrical
company there is a risk of power shutdowns on Saturday,
Sunday and Monday from about 8 am to 8 pm.
Entry  Sun Oct 9 18:19:01 2016, JL Tain et al, Noise 161007_1045_bck_lin.pdf161010_0712_bck_newthr.pdf
Optimization of ADC thresholds

In order to try to reduce the grass-like background
Entry  Tue Oct 11 15:58:01 2016, JL Tain et al, VETO Det IMG_20161012_124010.jpgPlastic-137Cs.pdfNaI-137Cs.pdf
Check of Plastic and NaI veto detectors and DACQ settings

Entry  Wed Oct 12 03:47:14 2016, JL Tain et al, Background 
Background measurement over night with CLOVER and VETO detectors

ADC #7 added to crate 1 for veto detectors: V1A7
Entry  Wed Oct 12 05:06:57 2016, JL Tain et al, Noise He136-nosource.pdfHe136-137Cs.pdf
Gamma source close to ORNL2 tube

In order to investigate the origin of the background
Entry  Thu Oct 13 04:36:58 2016, JL Tain et al, CLOVER 161013_1518_137Cs60Co.root
CLOVER energy calibration

Short run with 137Cs and 60Co sources at BRIKEN detector center
Entry  Thu Oct 13 12:58:31 2016, JL Tain et al, INCIDENT 
NIM Crate Failure. Lost of CLOVER G7

One of the 2 NIM crates, the one containing the power for CLOVER
Entry  Thu Oct 13 23:38:26 2016, JL Tain et al, CLOVER D4All-CsCo.pdfD4All-CsCo-zoom.pdfD4Sum-152Eu.pdf
Energy and efficiency calibration

We make calibrations for the remaining D4 CLOVER detector
Entry  Thu Oct 13 23:39:58 2016, JL Tain et al, VETO Det Plast-Cs.pdfNaI-Cs.pdfPlast-Co.pdfNaI-Co.pdfVETO-testarrangement.jpg
Energy calibration of plastic and NaI detectors

Entry  Thu Oct 13 23:41:25 2016, JL Tain et al, 252Cf 252Cf-161014.pdf
New BRIKEN energy calibration

Entry  Thu Oct 13 23:42:27 2016, JL Tain et al, Background Bckg-161014.pdf
Background measurement overnight

Start: 01:17
Entry  Fri Oct 14 04:12:50 2016, JL Tain et al, CONF 
New configuration file: 
161014Conf_BrikenFull.xlsx
Entry  Fri Oct 14 04:42:40 2016, JL Tain et al, Electronics D4All-CsCo-zoom-newlineCL.pdfBRIKEN-newlineCL.pdf
Change of main power line for MPOD and CLOVER preamp

ELOG V3.1.3-7933898