Fri Mar 24 03:28:39 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, Background
|
Background measurement overnight
Start: 19:45
|
Thu Oct 6 14:50:30 2016, JL Tain, A Tolosa, A Tarifeno,..., 252Cf 
|
First measurement with 252Cf source to check the calibration.
AIDA was in place so the source was at the right height
but displaced about 10cm from the center.
|
Thu Oct 6 14:43:47 2016, JL Tain, A Tarifeno, A Tolosa, J Agramunt, N Brewer, S Go, ..., Electronics
|
We mount back all preamplifiers
Initially we used all the PA coming from US, the repaired and the new ones.
There was an issue with the new ones (strong noise and cross talk)
|
Fri Oct 7 08:35:15 2016, JL Tain et al, Noise
|
Low amplitude noise component.
The figure shows the composition of the low amplitude noise
|
Fri Oct 7 10:42:52 2016, JL Tain et al, Noise
|
We investigate the effect on the noise in ORNL tubes of using a differential PA.
We connect the tubes in current PA10 (126-140) to one of the new diff PA
|
Sat Oct 8 01:18:51 2016, JL Tain et al, DACQ
|
| We increased the pretrigger delay for ADC5 from 350 to 400 |
Sun Oct 9 04:20:47 2016, JL Tain et al, Noise 
|
We check for the appearance of spurious signals in the preamplifiers.
We set all HV to zero and run a measurement for several hours.
|
Sun Oct 9 15:49:41 2016, JL Tain et al, Power shutdown
|
Due to maintenance operations of the Wako electrical
company there is a risk of power shutdowns on Saturday,
Sunday and Monday from about 8 am to 8 pm.
|
Sun Oct 9 18:19:01 2016, JL Tain et al, Noise 
|
Optimization of ADC thresholds
In order to try to reduce the grass-like background
|
Tue Oct 11 15:58:01 2016, JL Tain et al, VETO Det  
|
Check of Plastic and NaI veto detectors and DACQ settings
|
Wed Oct 12 03:47:14 2016, JL Tain et al, Background
|
Background measurement over night with CLOVER and VETO detectors
ADC #7 added to crate 1 for veto detectors: V1A7
|
Wed Oct 12 05:06:57 2016, JL Tain et al, Noise 
|
Gamma source close to ORNL2 tube
In order to investigate the origin of the background
|
Thu Oct 13 04:36:58 2016, JL Tain et al, CLOVER
|
CLOVER energy calibration
Short run with 137Cs and 60Co sources at BRIKEN detector center
|
Thu Oct 13 12:58:31 2016, JL Tain et al, INCIDENT
|
NIM Crate Failure. Lost of CLOVER G7
One of the 2 NIM crates, the one containing the power for CLOVER
|
Thu Oct 13 23:38:26 2016, JL Tain et al, CLOVER  
|
Energy and efficiency calibration
We make calibrations for the remaining D4 CLOVER detector
|
Thu Oct 13 23:39:58 2016, JL Tain et al, VETO Det    
|
Energy calibration of plastic and NaI detectors
|
Thu Oct 13 23:41:25 2016, JL Tain et al, 252Cf
|
New BRIKEN energy calibration
|
Thu Oct 13 23:42:27 2016, JL Tain et al, Background
|
Background measurement overnight
Start: 01:17
|
Fri Oct 14 04:12:50 2016, JL Tain et al, CONF
|
New configuration file:
161014Conf_BrikenFull.xlsx |
Fri Oct 14 04:42:40 2016, JL Tain et al, Electronics 
|
Change of main power line for MPOD and CLOVER preamp
|