AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 9 of 21  ELOG logo
ID Date Authordown Subject Text Attachments
  198   Fri Mar 24 03:28:39 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. NishimuraBackgroundBackground measurement overnight

Start: 19:45
 170324_1040_BackgroundOvernight.pdf 
  65   Thu Oct 6 14:50:30 2016 JL Tain, A Tolosa, A Tarifeno,...252CfFirst measurement with 252Cf source to check
the calibration.
AIDA was in place so the source was at the
 252Cf-1st.pdf161006_2235_252Cf.pdf 
  64   Thu Oct 6 14:43:47 2016 JL Tain, A Tarifeno, A Tolosa, J Agramunt, N Brewer, S Go, ...ElectronicsWe mount back all preamplifiers
Initially we used all the PA coming from
US, the repaired and the new ones.
  
  67   Fri Oct 7 08:35:15 2016 JL Tain et alNoiseLow amplitude noise component.

The figure shows the composition of the low
 noiseDifferentTubes2.pdf 
  68   Fri Oct 7 10:42:52 2016 JL Tain et alNoiseWe investigate the effect on the noise in
ORNL tubes of using a differential PA.
 ORNL-DiffPreamp.pdf 
  70   Sat Oct 8 01:18:51 2016 JL Tain et alDACQWe increased the pretrigger delay for ADC5
from 350 to 400
  
  71   Sun Oct 9 04:20:47 2016 JL Tain et alNoiseWe check for the appearance of spurious signals
in the preamplifiers.
 noHV.pdf161008_0642_noHV.pdf 
  72   Sun Oct 9 15:49:41 2016 JL Tain et alPower shutdownDue to maintenance operations of the Wako
electrical
company there is a risk of power shutdowns
  
  73   Sun Oct 9 18:19:01 2016 JL Tain et alNoiseOptimization of ADC thresholds

In order to try to reduce the grass-like
 161007_1045_bck_lin.pdf161010_0712_bck_newthr.pdf 
  75   Tue Oct 11 15:58:01 2016 JL Tain et alVETO DetCheck of Plastic and NaI veto detectors and
DACQ settings
 IMG_20161012_124010.jpgPlastic-137Cs.pdfNaI-137Cs.pdf 
  77   Wed Oct 12 03:47:14 2016 JL Tain et alBackgroundBackground measurement over night with CLOVER
and VETO detectors
  
  78   Wed Oct 12 05:06:57 2016 JL Tain et alNoiseGamma source close to ORNL2 tube

In order to investigate the origin of the
 He136-nosource.pdfHe136-137Cs.pdf 
  80   Thu Oct 13 04:36:58 2016 JL Tain et alCLOVERCLOVER energy calibration

Short run with 137Cs and 60Co sources at
 161013_1518_137Cs60Co.root 
  81   Thu Oct 13 12:58:31 2016 JL Tain et alINCIDENTNIM Crate Failure. Lost of CLOVER G7

One of the 2 NIM crates, the one containing
  
  82   Thu Oct 13 23:38:26 2016 JL Tain et alCLOVEREnergy and efficiency calibration

We make calibrations for the remaining D4
 D4All-CsCo.pdfD4All-CsCo-zoom.pdfD4Sum-152Eu.pdf 
  83   Thu Oct 13 23:39:58 2016 JL Tain et alVETO DetEnergy calibration of plastic and NaI detectors

 Plast-Cs.pdfNaI-Cs.pdfPlast-Co.pdfNaI-Co.pdfVETO-testarrangement.jpg 
  84   Thu Oct 13 23:41:25 2016 JL Tain et al252CfNew BRIKEN energy calibration

 252Cf-161014.pdf 
  85   Thu Oct 13 23:42:27 2016 JL Tain et alBackgroundBackground measurement overnight

Start: 01:17
 Bckg-161014.pdf 
  86   Fri Oct 14 04:12:50 2016 JL Tain et alCONFNew configuration file: 
161014Conf_BrikenFull.xlsx
  
  87   Fri Oct 14 04:42:40 2016 JL Tain et alElectronicsChange of main power line for MPOD and CLOVER
preamp
 D4All-CsCo-zoom-newlineCL.pdfBRIKEN-newlineCL.pdf 
ELOG V3.1.3-7933898