  126   Sun Oct 17 11:48:48 2021 TD RSSSunday 17 OctoberLooking downstream the RHS motor assembly
has  loose green/yellow (gnd?) see attachment
1
 14x 
  125   Sat Oct 16 17:25:47 2021 RSS TDBroken detectorsOne of the detectors was damaged while
mounting (see pictures 1-3).

Second detector was found already
 IMG_5098.JPGIMG_5097.JPGIMG_5096.JPGIMG_5106.JPGIMG_5105.JPG 
  124   Fri Oct 15 19:37:12 2021 RSS TD + DRFriday 15 OctoberRing seal is out. See picture 1.

Bellow (towards CARME) was installed
in the gas jet chamber. Attached are some
 8x 
  123   Thu Oct 14 15:54:47 2021 TD RSSThursday 14 OctoberAttachment 1 - what is function of the 4x
c/s holes indicated?
 IMG_5056.JPG.jpgIMG_5053.JPG 
  122   Wed Oct 13 15:28:22 2021 RSS TD + OGSplit funnelsSplit funnels installed on 4 (of 8) 2x78
way D connector feed-throughs.
 7x 
  121   Wed Oct 13 15:16:12 2021 TDOrientation of 2x 78 way D connector feedthroughs
Looking downstream
 20211013_152518.jpg20211013_152529.jpg20211013_152549.jpg20211013_152606.jpg 
  120   Wed Oct 13 12:06:09 2021 RSS TDFlanges cleanedRSS & TD had some success cleaning the COF600
flange surfaces of the staining and residues
observed when the downstream COF600 section
 12x 
  119   Wed Oct 13 11:59:23 2021 TD[How to] Open COF600 copper wire seals
Use the M10 jacking points provided top/bottom
and 
 20211013_103806.jpg20211013_103800.jpg 
  118   Tue Oct 12 13:54:21 2021 RSS TD + OD DRCARME openedWith the assistance of Oemer and Davide all
of the M22 bolts removed from the downstream
section of the CARME chamber. To separate
 20x 
  117   Tue Oct 12 09:22:37 2021 RSS TD + OG DRMotors problem solvedNeg and ion cables were taken off and were
put in the box.

Top support was taken off.
 IMG_4971.JPGIMG_4970.JPG 
  116   Mon Oct 11 11:24:16 2021 RSS TD MLValve support and cable labelingSplit funnels were given to Oemer for cleaning.
Have received them back after lunch.

Valve support is installed again
 IMG_4962.JPGIMG_4969.JPG.svgIMG_4968.JPG.svg 
  115   Sat Oct 9 09:47:33 2021 CBTo do list for next week0. Give split-funnels to OG or Grossmontage
to clean. Mount back foot support for gate
valves. Critical when we split.
 Capture.PNG 
  114   Sat Oct 9 09:44:36 2021 CB RSSHeaters removed + motors testsRemoved thermocouples, heaters, RE72 modules
and leftover baking tent. Support octagon
removed except topmost part which requires
  
  113   Fri Oct 8 17:56:35 2021 CB RSSMotors testAttempted first motor test in XHV. Wired
and connected limit switches and string potentiometer.

Set up raspberry pi to control
 20211008_184731.jpg20211008_184731.jpg 
  112   Thu Oct 7 08:40:09 2021 CB RSSCARME in XHVCARME reached 9E-12 this morning

Ion pumps on
  
  111   Wed Oct 6 15:36:14 2021 CB RSSNeg activation tests -3Attempted to activate 2xUHV1400 connected
to bottom C4, channel #2 using P 200 W, t
rise 30 min, t hold 90 min.
  
  110   Wed Oct 6 09:47:30 2021 CB RSSNeg activation tests -2Attempted activating 2xUHV1400 connected to
top C4, channel #3 with P 300 W (450 C?),
t rise 30 min, t hold 90
  
  109   Wed Oct 6 09:39:59 2021 PB CBOriginal dirty assembly of CARME internalsPB found pictures of the original dirty assembly,
before screws and components were shipped
to DL.
 7x 
  108   Tue Oct 5 17:30:01 2021 CB RSSNEG activation testsFound D2000 #1 activated and at 250C (25W)

to prevent getting dirty when other NEGs
 20211005_131259.jpg20211005_171403.jpg20211005_161317.jpg 
  107   Tue Oct 5 11:44:11 2021 CB, TD SAES manuals & cable drawingsNEG power
SIP power
UHV1400 operating instructions
 8x 