538
|
Tue Feb 20 14:12:32 2024 |
JM | Shutdown | CARME DAQ shutdown. FEEs turned OFF and
all MIDAS server windows closed.
Detector bias turned OFF. |
|
537
|
Tue Feb 20 13:20:44 2024 |
OF, AG, JG, ML | R48 status check | Doing afternoon check. Checked the leakage
currents, all ok. Attachment 1
Temperatures ok, attchment 2 |
|
536
|
Tue Feb 20 09:57:57 2024 |
OF, AG, ML | Run 48 status check | Doing morning check. Checked the leakage
currents, all ok. Attachment 1
Temperatures ok, attchment 2 |
|
535
|
Tue Feb 20 09:51:37 2024 |
JM | Run 48 beam on target | Run 48 started |
|
534
|
Tue Feb 20 08:41:08 2024 |
OF, AG | still no beam CRYRING | We have mosty empty injections into CRYRING.
Only sporadically the beam with good intensity
is injected. |
|
533
|
Tue Feb 20 07:50:10 2024 |
JM | DAQ restart | DAQ restarted. Run46. All appears OK, aida01
shows high rates across ASIC 4 even with
no beam which could not be resolved via ASIC |
|
532
|
Mon Feb 19 21:46:32 2024 |
EH, EM, CB | Run 45 + end of late shift | 22:54
We have moved the gas jet target out (y=4000),
the density has dropped to zero.
|
14x |
531
|
Mon Feb 19 08:45:22 2024 |
JM, JG, SHB, EM, EH | Run 44 - cooled beam on target | 09:43
Run 44 started cooled beam
on target |
35x |
530
|
Mon Feb 19 06:01:17 2024 |
SHB, JM, JG | Run 42 morning shift | 07:00
Observed reduction in YR09 presure
over last few hours in ML online plot. Beam |
6x |
529
|
Mon Feb 19 05:10:48 2024 |
TD | Run 42 night shift contd. | 06.03 DAQ continues file G22-86/R42_32
DSSSD bias & leakage current - attachments |
6x |
528
|
Sun Feb 18 22:03:56 2024 |
TD | Run 42 night shift |
23.03 DAQ continues file G22-86/R42_21
|
47x |
527
|
Sun Feb 18 13:58:33 2024 |
AR, OF, JM | Run 42 - cooled beam on target | Run 42 - 15:00
Detectors IN (left arm pot =36.54
mm, right arm pot = 70.49 mm). Stationary. |
27x |
526
|
Sun Feb 18 13:10:18 2024 |
TD | Sunday 18 February - DSSSD 0 aida01 and aida04 *.*.L spectra |
DSSSD 0 aida01 1*L spectra, aida04 **L spectra
|
|
525
|
Sun Feb 18 07:53:51 2024 |
HW AG | Run 40 Morning Shift | 08:57 Doing morning check. Checked the
leakage currents, all ok. Attachment 1
Tempritures of, attchment 2 |
27x |
524
|
Sun Feb 18 00:16:55 2024 |
JM CB | Run 40 - night shift | 01:17
Run 40 continues.
Beam intensity looks OK. Oscillates |
15x |
523
|
Sat Feb 17 14:29:03 2024 |
JM, CB, AR, AB | Run 40 - cooled beam on target | 15:27
Run 40 started cooled beam on target
Detectors IN (left arm pot =36.5 |
31x |
522
|
Sat Feb 17 13:21:44 2024 |
JM, CB | Beam on target - motors tests | 14:01
Run 36 started.
We put both detectors to the fully |
|
521
|
Sat Feb 17 06:19:27 2024 |
JM, CB | Run 35 - contd | 07:10
FEE temperatures OK
System checks OK |
|
520
|
Fri Feb 16 22:03:27 2024 |
TD | Run 35 - night shift |
22.51 DAQ continues file G22-86/R35_36
|
49x |
519
|
Fri Feb 16 10:02:41 2024 |
JM, OF, CB, AR, EM | Run 35 - cooled beam on target | 11:01
Run 35 started cooled beam on target
Detectors IN (left arm pot =36.5 |