AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 1 of 28  ELOG logo
ID Date Authordown Subject
  198   Wed Feb 16 08:27:27 2022 TP, RSSAlpha background run40

09:15

Check Leakage current: (see attachment 1)

Check NewMerger tab: (see attachment 2)

Check Fee temperatures: all green (see attachment 3)

 

Check statistics tab: ADC data items (see attachment 4)

                                 ADC coincidence-info #8 (see attachment 5)

                                 Good events (see attachment 7)

 Check Spectrum Browser tab: (see attachment 6)                 

Check the following plots: LowEnergyExTotal (see attachment 8)

                                         LowEnergyEyTotal (see attachment 9)

                                         LowEnergyXYRateDSSD0 (see attachment 10)

                                         LowEnergyXYTotalDSSD0 (see attachment 11)

 

Check system wide checks tab: all okay.

All is good.

Attachment 1: leakage-2022-02-16_09-15-33.png
leakage-2022-02-16_09-15-33.png
Attachment 2: merger-tab_2022-02-16_09-14-40.png
merger-tab_2022-02-16_09-14-40.png
Attachment 3: temperatures-2022-02-16_09-16-35.png
temperatures-2022-02-16_09-16-35.png
Attachment 4: stats-adc-items-2022-02-16_09-20-16.png
stats-adc-items-2022-02-16_09-20-16.png
Attachment 5: aida-correlation-2022-02-16_09-21-16.png
aida-correlation-2022-02-16_09-21-16.png
Attachment 6: spectrum-browser-2022-02-16_09-22-06.png
spectrum-browser-2022-02-16_09-22-06.png
Attachment 7: stats-good-event-2022-02-16_09-18-13.png
stats-good-event-2022-02-16_09-18-13.png
Attachment 8: low-enegry-ex-tot-2022-02-16_09-23-25.png
low-enegry-ex-tot-2022-02-16_09-23-25.png
Attachment 9: low-energy-ey-tot-2022-02-16_09-23-52.png
low-energy-ey-tot-2022-02-16_09-23-52.png
Attachment 10: low-energy-xy-rate-dsssd0-2022-02-16_09-26-43.png
low-energy-xy-rate-dsssd0-2022-02-16_09-26-43.png
Attachment 11: low-energy-xy-total-dssd0-2022-02-16_09-25-54.png
low-energy-xy-total-dssd0-2022-02-16_09-25-54.png
  199   Wed Feb 16 12:43:05 2022 TP, RSSAlpha background run40

13:30

Check Leakage current: (see attachment 1)

Check NewMerger tab: (see attachment 2)

Check Fee temperatures: all green (see attachment 3)

Check statistics tab: ADC data items (see attachment 4)

                                 ADC coincidence-info #8 (see attachment 5)

                                 Good events (see attachment 6)

 Check Spectrum Browser tab: (see attachment 7)                 

Check the following plots: LowEnergyXYRateDSSD0 (see attachment 8)

                                         LowEnergyXYTotalDSSD0 (see attachment 9)

                                         LowEnergyExTotal (see attachment 10)

                                         LowEnergyEyTotal (see attachment 11)

                                        

                                        

 

Check system wide checks tab: all okay.

All is good.

Attachment 1: leakage-2022-02-16_13-35-38.png
leakage-2022-02-16_13-35-38.png
Attachment 2: merger-state-2022-02-16_13-35-16.png
merger-state-2022-02-16_13-35-16.png
Attachment 3: temperatures-2022-02-16_13-36-05.png
temperatures-2022-02-16_13-36-05.png
Attachment 4: aida-adc-data-2022-02-16_13-38-13.png
aida-adc-data-2022-02-16_13-38-13.png
Attachment 5: adc-good-events-2022-02-16_13-37-02.png
adc-good-events-2022-02-16_13-37-02.png
Attachment 6: aida-correlation-2022-02-16_13-37-39.png
aida-correlation-2022-02-16_13-37-39.png
Attachment 7: spectrum-browser-2022-02-16_13-38-56.png
spectrum-browser-2022-02-16_13-38-56.png
Attachment 8: lowenergy-xy-rate-dssd0-2022-02-16_13-42-12.png
lowenergy-xy-rate-dssd0-2022-02-16_13-42-12.png
Attachment 9: lowenergy-xytotal-dssd0-2022-02-16_13-41-31.png
lowenergy-xytotal-dssd0-2022-02-16_13-41-31.png
Attachment 10: lowenergy-ex-total-dsssd0-2022-02-16_13-39-43.png
lowenergy-ex-total-dsssd0-2022-02-16_13-39-43.png
Attachment 11: lowenergy-ey-total-dsssd0-2022-02-16_13-40-12.png
lowenergy-ey-total-dsssd0-2022-02-16_13-40-12.png
  38   Mon Aug 9 12:36:00 2021 TD, RSS, ABDMonday 9 August
Attachments 1-5 - CARME shipment in CRYRING hall
                  XHV chambers nearest to YR09

Will remove top and sides of XHV chamber crate and install 4x SAES D-2000, 1x Leybold Mag Lev 400 turbo and 1x Leybold Ionvac IE514 gauge for basic vacuum test.

Attachments 6-7 - spare wire seals shipped from Edinburgh to GSI
                  poor packing and/or re-packing has resulted in bending of wire seals
                  wire seals shipped from STFC DL to GSI appear to be OK - see attachment 1
                  
Attachment 1: 20210809_132802.jpg
20210809_132802.jpg
Attachment 2: 20210809_132813.jpg
20210809_132813.jpg
Attachment 3: 20210809_132903.jpg
20210809_132903.jpg
Attachment 4: 20210809_132913.jpg
20210809_132913.jpg
Attachment 5: 20210809_133438.jpg
20210809_133438.jpg
Attachment 6: 20210809_145826.jpg
20210809_145826.jpg
Attachment 7: 20210809_145831.jpg
20210809_145831.jpg
  399   Sat May 13 11:34:25 2023 TD, RSSSaturday 13 May
12.34 DSSSD#3 bias -149.95V leakage current -6.763uA temperature +21.2 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php )

CRYRING cave lights ON - leakage current measurements @ 60s intervals

6.763
6.764
6.764
6.765
6.767
6.767
6.767
6.767
6.768
6.769

12.48 CRYRING cave lights OFF

13.03 leakage current -6.771uA - no obvious change due to the CRYRING cave lighting

17.31 DSSSD#3 bias -149.95V leakage current -6.658uA temperature +21.0 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php )

leakage current measurements @ 60s intervals

6.656
6.655
6.655
6.655
6.654
6.652
6.652
6.651
6.650
6.649

CRYRING cave temperature variations/cycles ~0.1 deg C at +21 deg C ambient temperature can produce leakage current variations ~60nA for a leakage current of ~6.6uA

td@winder:~/f77$ ./jgen
 *** Enter reference temperature (K)
294
 *** Enter minimum temperature, maximum temperature
 *** and temperature increment (K)
290 298 0.1

 Temperature (K)   Ratio (J(T)/J(294.0))

      290.0                0.702
      290.1                0.708
      290.2                0.714
      290.3                0.721
      290.4                0.727
      290.5                0.734
      290.6                0.740
      290.7                0.747
      290.8                0.754
      290.9                0.761
      291.0                0.767
      291.1                0.774
      291.2                0.781
      291.3                0.788
      291.4                0.795
      291.5                0.802
      291.6                0.809
      291.7                0.817
      291.8                0.824
      291.9                0.831
      292.0                0.839
      292.1                0.846
      292.2                0.854
      292.3                0.861
      292.4                0.869
      292.5                0.877
      292.6                0.884
      292.7                0.892
      292.8                0.900
      292.9                0.908
      293.0                0.916
      293.1                0.924
      293.2                0.932
      293.3                0.941
      293.4                0.949
      293.5                0.957
      293.6                0.966
      293.7                0.974
      293.8                0.983
      293.9                0.991
      294.0                1.000
      294.1                1.009
      294.2                1.018
      294.3                1.027
      294.4                1.036
      294.5                1.045
      294.6                1.054
      294.7                1.063
      294.8                1.072
      294.9                1.082
      295.0                1.091
      295.1                1.101
      295.2                1.110
      295.3                1.120
      295.4                1.130
      295.5                1.139
      295.6                1.149
      295.7                1.159
      295.8                1.169
      295.9                1.179
      296.0                1.190
      296.1                1.200
      296.2                1.210
      296.3                1.221
      296.4                1.231
      296.5                1.242
      296.6                1.253
      296.7                1.263
      296.8                1.274
      296.9                1.285
      297.0                1.296
      297.1                1.308
      297.2                1.319
      297.3                1.330
      297.4                1.342
      297.5                1.353
      297.6                1.365
      297.7                1.376
      297.8                1.388
      297.9                1.400

STOP *** Program ends
  424   Fri Jul 21 08:21:54 2023 TD, RSSBaking tent manual
09.20 Pirani 1.00e-3 mbar IE514 3.90e-8 mbar

      Today - install TCs, connect to Pico controller and test

10.00 Bakeout tent setup guide (draft) - attachment 1

14:30 Tested all TCs and are fine

05.25 Pirani 1.00e-3 mbar IE514 3.71e-8 mbar
Attachment 1: CARME-baking-guide_(1).pdf
CARME-baking-guide_(1).pdf CARME-baking-guide_(1).pdf CARME-baking-guide_(1).pdf CARME-baking-guide_(1).pdf CARME-baking-guide_(1).pdf CARME-baking-guide_(1).pdf
  172   Fri Jan 14 10:00:18 2022 TD, OH, JMFriday 14 January
11.00 Per https://elog.ph.ed.ac.uk/CARME/170 and https://elog.ph.ed.ac.uk/CARME/171 issues have been identified with the FEE64 carriers and adaptor PCBs

Some additional comments

1) Per https://elog.ph.ed.ac.uk/CARME/170 attachments 6-9 we can see that there are no cable strain reliefs to which we can attach the FEE64 power, RJ45 network and 
timestamp HDMI cabling. It would probably be straightforward to design something which could be attached to the FEE64 carrier side panels. For the time being we will use 
the copper piping of each FEE64 as the nearest, mechanically stable point to which we secure the cabling.

2) Before the skimming of 1x Delron rail yesterday there was a small amount (<1mm say?) of transverse movement of the FEE64 during insertion into the carrier and it is 
not clear why. Small sample of measurements of FEE64 carriers, spacers etc.

Delron adaptor PCB support widths 92.85, 92.87, 92.90
Al DN100CF flange attachment width 92.97, 92.99, 93.01
Al FEE64 carrier spacing rod 93.03, 93.04, 93.03
FEE64 width (w/ 1x c. 2mm skimmed Delron rail) 100.2, 100.2, 100.3 (3 measurements along the length of the 1x FEE64)
FEE64 carrier width 102.8, 103.0 (2 measurements of 1x FEE64 carrier)


probably indicates that the spacing between the FEE64 plates is consistent. There is some variability (~0.1mm) in the Delron adaptor PCB which could affect the relative 
position of the ERNI pins and sockets. Is there some variability in the width of the FEE64s (w/ rails)?
  373   Wed Aug 10 10:33:03 2022 TD, ML, JM, NPMeeting at YR09 to discuss options for CARME operations to February 2022
Initial discussions of proposals to provide open CARME chamber and provide access to near and far detector chambers

We assume that we need to complete all work installing and testing DSSSDs and re-assembling CARME by Feb 2022 in readiness for bakeout. 




Proposal #1

Disconnect far detector chamber section from mid-chamber section
Disconnect DN350CF flange from near detector chamber 

Crane to support near detector chamber and mid-chamber sections

Remove feet of near detector chamber and mid-chamber sections

Install cradle(s) beneath near detector chamber and mid-chamber sections

Use for fork lift to remove cradle(s) + near detector chamber and mid-chamber sections - ML confirms that an appropriate fork lift is available 


Proposal #2 (suggested by ML)

Design and fabricate table plus rails to extend transverse rails of CARME chamber support assembly
The CARME chamber support assembly comprises the 'feet' plus two-stage welded Al frame 

Disconnect far detector chamber section from downstream section
Disconnect DN350CF flange from near detector chamber 

Slide CARME chamber plus upper stage of Al support frame transversely onto table

Use crane to move CARME chamber to work area


Other discussions

Discussed workarounds to enable install of FEE64s (outside ring, upper feedthrough) which currently conflicts with longitudinal beam of gas jet target support frame.


To Do

Edinburgh

- investigate feasibility of proposal #2
- investigate how much space is required to install FEE64s (outside ring, upper feedthrough)
  e.g. by extension of transverse beams of gas jet target support frame, move current assembly outwards from ring c. 20-25cm


GSI

- investigate feasibility of gas jet target support frame changes outlined above e.g. movement of gas/water services, purchase of longer cross beams etc.


Suggest meeting (online) to discuss results of these investigations and continue discussions w/c August 22
Attachment 1: 20220810_111638.jpg
20220810_111638.jpg
Attachment 2: 20220810_095036.jpg
20220810_095036.jpg
Attachment 3: 20220810_095150.jpg
20220810_095150.jpg
Attachment 4: 20220810_095159.jpg
20220810_095159.jpg
  168   Tue Jan 11 12:45:15 2022 TD, JM, OHCoolant manifold installation + detector pin tests
2x cooling water manifolds with 2x 8 ports have been installed - see attachments 1 & 2

'drain' ports at top of manifold to permit release of trapped air volumes. Local technicians will install a standard blank in one manifold and a small nipple valve on the 
other so that we can bleed air in a controlled way.

#Multimeter detector pin tests. 
Pins on feedthrough flanges investigated using multimeter for the top and bottom detector due to no response from bottom detector when bias was applied. Bias pins on 
correct D connectors are number 78. 

#Top detector
>Observe -18.5 kohm; between nn bias pin and pn bias pin  (multimeter 200kohm setting)
>observe open line between nn bias pin and pins 'near' pn bias pin (multimeter 200kohm setting)

>Between random pins on same D connector (nn bias pin connector) ~0.02Mohm (multimeter 2Mohm setting)
>Between random pins and unconnected on same D connector (nn bias pin connector) - open line (multimeter 2Mohm setting)
>Between random pins and bias pin on same D connector (nn bias pin connector) ~0.01-0.02 Mohm (multimeter 2Mohm setting)

>Between nn bias pin and random pin on another D connector ~-0.4Mohm (multimeter 2Mohm setting)

#Bottom detector 
>Observe open line between nn bias pin and pn bias pin (multimeter 200kohm+2Mohm; setting)
>Observe open line between nn bias pin and pins 'near' bias bias pin (multimeter 200kohm+2Mohm; setting)

>Between random pins on same D connector (nn bias pin connector) ~0.02Mohm (multimeter 2Mohm setting)
>Between random pins and unconnected on same D connector (nn bias pin connector) - open line (multimeter 2Mohm setting)
>Between random pins and bias pin on same D connector (nn bias pin connector) ~0.01-0.02 Mohm (multimeter 2Mohm setting)

>Between random pins on same D connector (pn bias pin connector) ~0.02Mohm (multimeter 2Mohm setting)
>Between random pins and unconnected on same D connector (pn bias pin connector) - open line (multimeter 2Mohm setting)
>Between random pins and bias pin on same D connector (pn bias pin connector) ~open line (multimeter 2Mohm setting)

>Between nn bias pin and random pin on another D connector ~-0.4Mohm (multimeter 2Mohm setting)

We see a similar response for both detectors except that the pn bias pin gives no response. 
We have looked to find the bias pin on nearby pins to pin 78 and on the other side of the D connector (in case of cabling error-mirror or swapped cables) but cannot find. 

4 FEE holders constructed and ready to install
Attachment 1: 20220111_113628.jpg
20220111_113628.jpg
Attachment 2: 20220111_113613.jpg
20220111_113613.jpg
Attachment 3: 20220111_111428.jpg
20220111_111428.jpg
  508   Mon Feb 12 01:40:48 2024 TD, JM, CB, AR, RSSRun17 - Run20
02.35 DAQ continues file G22-88/R17_30

02.38 Check ASIC load
      aida01 asics # 1 and #4 & aida12 asic #2 HEC events removed



09.05 DAQ continues file G22-88/R17_53
      DSSSD bias & leakage current OK - attachments 10-11

      FEE64 temperatures OK - attachment 12

      ADC data item stats OK - attachment 13
       hot channels aida01 ( 67k ) and aida15 ( 7k )

      WR timestamps OK - attachment 14

      per FEE64 Rate and Stat spectra - attachments 15-16

      Merger, Merger stats and TapeServer - attachments 17-19

09.19 New run G22-88/R18
      all histograms & stats zero'd

      CB starting up 4He target preparatory to returning 16O2+ beam to CRYRING

      L & R arms all out

09.26 4He target c. 2e11c.2
      16O2+ beam c. 3e5/s

09.58 4He target c. 3e11/cm2
      16O2+ beam c. 5e5/s at start of cycle
      See attachments 20-22

10.40 New run G22-88/R19
      all histograms & stats zero'd

      CB will attempt to steer the beam 
      all steering options set to 0mm except YR09 target offset (vertical = -9mm) and (horizontal = 9mm) 


10.52 R arm fully in, L arm fully out
      beam steering hard right

14:24 Frank has informed us that the CRYRING team will be examining the electron cooler for th enext few hours. Run 19 stopped, Run 20 started. 
      Detectors moved fully out, target OFF. 
      All histograms and stats zero'd
      Access to the cave is required, beam OFF

15:45 Channel 1 back to 150V.


17.40 DAQ continues file G22-88/R20_13
      DSSSD bias & leakage current OK - attachments 23-24

      FEE64 temperatures OK - attachment 25

      All system wide checks OK except aida08 FPGA error - attachment 26

      WR timestamps OK - attachment 27

      ADC data item stats OK - attachment 28
       hot channels aida01 ( 80k ) and aida15 ( 7k )

      per FEE64 Rate and Stat spectra - attachments 29-30

      Merger, Merger stats and TapeServer - attachments 31-32

23.12 DAQ continues file G22-88/R20_20
      DSSSD bias & leakage current OK - attachments 33-34

      FEE64 temperatures OK

      All system wide checks OK except aida08 FPGA error - attachment 35

      WR timestamps OK - attachment 36

      ADC data item stats OK - attachment 37
       hot channels aida01 ( 80k ) and aida15 ( 7k )

      per FEE64 Rate and Stat spectra - attachments 38

      Merger, Merger stats and TapeServer - attachments 39-40



03.47 DAQ continues file G22-88/R20_28

      DSSSD bias & leakage current OK - attachments 41-42

      FEE64 temperatures OK - attachment 43

      ADC data item stats - attachment 44
       aida12 rate - HEC events 

      per FEE64 Rate spectra - attachment 45

      Check ASIC load 

      ADC data item stats - attachment 46

      per FEE64 Rate spectra - attachment 47

      Merger, Merger stats and TapeServer - attachments 48-49





      
Attachment 1: Screenshot_from_2024-02-12_02-34-50.png
Screenshot_from_2024-02-12_02-34-50.png
Attachment 2: Screenshot_from_2024-02-12_02-35-12.png
Screenshot_from_2024-02-12_02-35-12.png
Attachment 3: Screenshot_from_2024-02-12_02-35-44.png
Screenshot_from_2024-02-12_02-35-44.png
Attachment 4: Screenshot_from_2024-02-12_02-36-21.png
Screenshot_from_2024-02-12_02-36-21.png
Attachment 5: Screenshot_from_2024-02-12_02-37-20.png
Screenshot_from_2024-02-12_02-37-20.png
Attachment 6: Screenshot_from_2024-02-12_02-38-35.png
Screenshot_from_2024-02-12_02-38-35.png
Attachment 7: Screenshot_from_2024-02-12_02-39-32.png
Screenshot_from_2024-02-12_02-39-32.png
Attachment 8: Screenshot_from_2024-02-12_02-39-52.png
Screenshot_from_2024-02-12_02-39-52.png
Attachment 9: Screenshot_from_2024-02-12_02-40-05.png
Screenshot_from_2024-02-12_02-40-05.png
Attachment 10: Screenshot_from_2024-02-12_09-05-53.png
Screenshot_from_2024-02-12_09-05-53.png
Attachment 11: Screenshot_from_2024-02-12_09-06-03.png
Screenshot_from_2024-02-12_09-06-03.png
Attachment 12: Screenshot_from_2024-02-12_09-06-42.png
Screenshot_from_2024-02-12_09-06-42.png
Attachment 13: Screenshot_from_2024-02-12_09-07-02.png
Screenshot_from_2024-02-12_09-07-02.png
Attachment 14: Screenshot_from_2024-02-12_09-07-31.png
Screenshot_from_2024-02-12_09-07-31.png
Attachment 15: Screenshot_from_2024-02-12_09-07-42.png
Screenshot_from_2024-02-12_09-07-42.png
Attachment 16: Screenshot_from_2024-02-12_09-08-23.png
Screenshot_from_2024-02-12_09-08-23.png
Attachment 17: Screenshot_from_2024-02-12_09-08-48.png
Screenshot_from_2024-02-12_09-08-48.png
Attachment 18: Screenshot_from_2024-02-12_09-08-54.png
Screenshot_from_2024-02-12_09-08-54.png
Attachment 19: Screenshot_from_2024-02-12_09-09-03.png
Screenshot_from_2024-02-12_09-09-03.png
Attachment 20: 20240212_095432.jpg
20240212_095432.jpg
Attachment 21: 20240212_095444.jpg
20240212_095444.jpg
Attachment 22: 20240212_095449.jpg
20240212_095449.jpg
Attachment 23: Screenshot_from_2024-02-12_17-40-16.png
Screenshot_from_2024-02-12_17-40-16.png
Attachment 24: Screenshot_from_2024-02-12_17-40-25.png
Screenshot_from_2024-02-12_17-40-25.png
Attachment 25: Screenshot_from_2024-02-12_17-40-43.png
Screenshot_from_2024-02-12_17-40-43.png
Attachment 26: Screenshot_from_2024-02-12_17-41-01.png
Screenshot_from_2024-02-12_17-41-01.png
Attachment 27: Screenshot_from_2024-02-12_17-41-25.png
Screenshot_from_2024-02-12_17-41-25.png
Attachment 28: Screenshot_from_2024-02-12_17-41-39.png
Screenshot_from_2024-02-12_17-41-39.png
Attachment 29: Screenshot_from_2024-02-12_17-42-14.png
Screenshot_from_2024-02-12_17-42-14.png
Attachment 30: Screenshot_from_2024-02-12_17-42-43.png
Screenshot_from_2024-02-12_17-42-43.png
Attachment 31: Screenshot_from_2024-02-12_17-43-00.png
Screenshot_from_2024-02-12_17-43-00.png
Attachment 32: Screenshot_from_2024-02-12_17-43-12.png
Screenshot_from_2024-02-12_17-43-12.png
Attachment 33: Screenshot_from_2024-02-12_23-12-12.png
Screenshot_from_2024-02-12_23-12-12.png
Attachment 34: Screenshot_from_2024-02-12_23-12-35.png
Screenshot_from_2024-02-12_23-12-35.png
Attachment 35: Screenshot_from_2024-02-12_23-12-58.png
Screenshot_from_2024-02-12_23-12-58.png
Attachment 36: Screenshot_from_2024-02-12_23-13-38.png
Screenshot_from_2024-02-12_23-13-38.png
Attachment 37: Screenshot_from_2024-02-12_23-13-57.png
Screenshot_from_2024-02-12_23-13-57.png
Attachment 38: Screenshot_from_2024-02-12_23-15-02.png
Screenshot_from_2024-02-12_23-15-02.png
Attachment 39: Screenshot_from_2024-02-12_23-15-21.png
Screenshot_from_2024-02-12_23-15-21.png
Attachment 40: Screenshot_from_2024-02-12_23-15-39.png
Screenshot_from_2024-02-12_23-15-39.png
Attachment 41: Screenshot_from_2024-02-13_03-47-40.png
Screenshot_from_2024-02-13_03-47-40.png
Attachment 42: Screenshot_from_2024-02-13_03-48-14.png
Screenshot_from_2024-02-13_03-48-14.png
Attachment 43: Screenshot_from_2024-02-13_03-50-53.png
Screenshot_from_2024-02-13_03-50-53.png
Attachment 44: Screenshot_from_2024-02-13_03-51-24.png
Screenshot_from_2024-02-13_03-51-24.png
Attachment 45: Screenshot_from_2024-02-13_03-51-50.png
Screenshot_from_2024-02-13_03-51-50.png
Attachment 46: Screenshot_from_2024-02-13_03-53-21.png
Screenshot_from_2024-02-13_03-53-21.png
Attachment 47: Screenshot_from_2024-02-13_03-53-41.png
Screenshot_from_2024-02-13_03-53-41.png
Attachment 48: Screenshot_from_2024-02-13_03-54-00.png
Screenshot_from_2024-02-13_03-54-00.png
Attachment 49: Screenshot_from_2024-02-13_03-54-15.png
Screenshot_from_2024-02-13_03-54-15.png
  8   Thu Sep 10 11:34:30 2020 TD, JMThursday 10 September
All neg feed-throughs have now been fully installed, with ground tags 
and power wires crimped and attached to the correct pins. Feed-throughs 
are installed as seen in Image 
1 of zip file, with mark at the top of the feed-through. The pin 
assignment is seen in Image 2. The pins are assigned letters A to F, 
with F the top pin and C the bottom 
pin as installed(refer to images 1+2). The ground is pin c, with the 
two power wires connected to the bottom pins either side of the ground 
(pins b and d). Connections of 
wires from the negs to the feed-through is seen in image 3. Feed-
throughs have been electrically checked. The ground pin is checked 
against the chamber giving 
approx 0.5 ohms and the power pins are checked together giving 5-10 
ohms. Each of the power pins are open circuit with respect to the 
ground. A 
thermocouple has been attached under the bolt of one of the neg pumps 
(image 4).

Pirani gauge and hot cathode gauge have been installed on the chamber 
(images 5,6,7,8) on the section furthest from the turbos. 

Upper valve, turbo and supports have all now been installed (images 
9,10,11). Images 12,13 are of the internal of the turbo and turbo 
ports. The lower valve supports 
produced by the Daresbury group (image 14) are also now attached. These 
supports were required as the lower valve sits higher than anticipated 
due to shorter right-angled 
flanges.

Chamber is now ready to close and leak test!
Attachment 1: 20200910_112152.jpg
20200910_112152.jpg
Attachment 2: 20200910_112211.jpg
20200910_112211.jpg
Attachment 3: Photos_(1).zip
  187   Fri Feb 4 12:49:54 2022 TD, JMGrounding Tests and current status
JM plans to install new crimped, 3mm dia copper drain wires (a la AIDA@DESPEC) this afternoon. 

Initial Grounding - Lemo cables connecting adaptor cards ground in daisy chain. Fee bodies connected by 3mm copper drain wires in daisy chain. Two chains brought together 
at final adaptor card which is connected to cryring ground. 

Attachments 1-5

ADC data item rates   all <10k
ASIC settings         all LEC slow comparators 0x64
1.8.L spectra aida05-08 widths 556, 511, ?, 570 ch FWHM respectively
1.8.W spectra 20us FSR
Adaptor card grounding image

1.8L widths appear broader than previous day of ~300 width. Reason unknown, no change made to setup as yet. 

Second Grounding - 3mm copper drain wires connect each adaptor card to Fee body. Fee bodies daisy chained together using 3mm copper drain wire and connected to cryring 
ground. 

ADC data item rates   all <10k
ASIC settings         all LEC slow comparators 0x64

Attachments 6-8
1.8.L spectra aida05-06 widths 620, 550 ch FWHM respectively, 1.1.L aida08 width 350 ch FWHM
1.8.W spectra 20us FSR. Some extra high frequency noise
Adaptor card grounding 
 

Third Grounding - 3mm copper drain wires connect adaptor cards in daisy chains. Fee bodies daisy chained together using 3mm copper drain wire. Two chains brought 
together and connected to cryring ground. 

ADC data item rates   all <10k
ASIC settings         all LEC slow comparators 0x64
1.8.L spectra aida05-08 similar to initial grounding ~500 ch FWHM

Attachments 9-11
1.8.W spectra 20us FSR.
AIDA5-8 channel rates. Rates dominated by noisy strips. Missing strips come and go as ASIC settings checked. 
Adaptor card grounding

Some work still required to reduce noise in the system and reduce pulser widths. Pulser should also be checked on scope 

Gauge turned back ON. Bias 80V, 3.5 uA before. Bias 80V, 5.4 uA after. Bias turned off and on again. NO change to diode characteristic, current ramps high before coming 
down once bias on. Bias left ON 80V to see if stable when second gauge turned on and valves reopened. Pulser ON. Fee power OFF. Water cooling ON. 

No significant changes to waveforms, pulser width or rates with gauge ON. Other noise contributions probably outweigh effect of the gauge at this point. 

3mm copper grounding cable and attachments, crimper and Yorkshire tea left in control room. 
Attachment 1: Screenshot_from_2022-02-04_13-37-54.png
Screenshot_from_2022-02-04_13-37-54.png
Attachment 2: Screenshot_from_2022-02-04_13-38-14.png
Screenshot_from_2022-02-04_13-38-14.png
Attachment 3: Screenshot_from_2022-02-04_13-43-30.png
Screenshot_from_2022-02-04_13-43-30.png
Attachment 4: Screenshot_from_2022-02-04_13-48-28.png
Screenshot_from_2022-02-04_13-48-28.png
Attachment 5: 20220203_100719.jpg
20220203_100719.jpg
Attachment 6: 2022-02-04_15-03-391.8*L.png
2022-02-04_15-03-391.8*L.png
Attachment 7: 2022-02-04_14-57-50aida8-1.8*W.png
2022-02-04_14-57-50aida8-1.8*W.png
Attachment 8: 2022-02-04_16-13-39-1*W.png
2022-02-04_16-13-39-1*W.png
Attachment 9: 2022-02-04_16-01-49rateAIDA5-8.png
2022-02-04_16-01-49rateAIDA5-8.png
Attachment 10: 20220204_154113.jpg
20220204_154113.jpg
  370   Tue Aug 9 13:44:16 2022 TD, JMTuesday 9 August
14.00 CARME vacuum c. 1.8e-10 mbar - see attachment 1

open water inlet/outlet taps

NIM bin (MACBs, Ortec 480 Pulser, CAEN N1419ET) switched ON

USB-controlled ac mains relay switched ON - water & interlock LEDs active

Require VETAR2 (previous returned to Nik Kurz) and network switch (currently with AIDA@DESPEC)

Turbo pump ON - normal operation

Ion pumps ON - normal operation

16.30 ML informs us that ambient temperature of CRYRING cave has been increased from c. 16 deg C to c. 21 deg C and that this is likely the cause of the change in vacuum 
pressure in YR09 and the rest of the storage ring.

obtained VETAR2 and crate 

anydesk restarted
Attachment 1: Capture_1.PNG
Capture_1.PNG
Attachment 2: 20220809_163450.jpg
20220809_163450.jpg
Attachment 3: 20220809_135840.jpg
20220809_135840.jpg
Attachment 4: 20220809_135833.jpg
20220809_135833.jpg
Attachment 5: 20220809_135801.jpg
20220809_135801.jpg
  372   Wed Aug 10 10:30:04 2022 TD, JMWednesday 10 August
09.45 Found CARME electrical power off

      Reset power switch of distribution box to on
      Reset fuse of 19" rack extender board

      One of the SIP power modules may be faulty - others switch on OK


14.00 Checked coolant water flow OK

      Transferred Netgear 24 port Gbit switch from AIDA (S4) to CARME (YR09)

      Re-connected FEE64 RJ45 network cables
      Re-connected nnrpi1 RJ45 network cable
      Re-connected RJ45 network cable (yellow) to bottom left connector of YR09 patch panel 
      
      @CRYRING user control rooms

      Connected RJ45 netwwork cable (yellow) from bottom left connector of patch panel (labelled "1-2->YR10" and "3-4->YR10") to CARME server carme-gsi p4p1 port


Retarted HttpdTcl servers on nnrpi1 and carme-gsi.

Normal 5x FEE64 power up

All system wide checks OK

FEE64 temperatures OK - attachment 1

ASIC settings 
 slow comparator 0x64

Pulser running through aida01-05
Detectors not biased -> lot of noise aida01-04

AIDA stats - attachments 3 & 4

aida05 pulser width ~150 channels FWHM, normal settings, shaping time 8us - attachment 4

See attachments 2-4

Tried changing ADC control register to 0xf in local controls tab -> stops waveform producing data -> no effect on pulser width (slight increase to 160 chn)
fast comparator blanked off (enable disable mask in discriminator control) -> no effect on pulser width
aida05 was ungrounded -> grounded aida05 to the same ground as aida01-04 -> pulser width reduced to 46 chns
Set ADC control register back to 0x0 -> waveforms back -> pulser width reduced to 24 chns
Changed shaping time from 8ms to 1ms -> pulser width increased to 67 chns -> changed back to 8ms shaping time -> returns to 24 chn width
Changed shaping time from 8ms to 2ms -> pulser width increased to 52 chns
Changed shaping time from 2ms to 4ms -> pulser width decreased to 33 chns
Attachment 1: 4.PNG
4.PNG
Attachment 2: 3.PNG
3.PNG
Attachment 3: 2.png
2.png
Attachment 4: 1.png
1.png
  375   Fri Aug 12 09:06:57 2022 TD, JMNoise tests pt2
10.07 DSSSD bias -100V leakage current -8.65uA

Waveforms and discriminators off, still on clean power supply

stats are ~10k across all fees

aida03 ~ 220
aida04 ~ 205
aida01 ~ 378
aida02 ~ 259
aida05 ~ 40

Grounding removed from all fees except nn bias fee aida04 and aida05. Grounding goes into both adaptor board and fee body

aida01 - no identifiable peak
aida02 - no identifiable peak
aida05 - double peak separated by 70 chn
aida04 - 400 shouldering
aida03 - no identifiable peak

Grounding removed from all fees except nn and pn bias fees aida04, aida01 and aida05. Grounding goes into both adaptor board and fee body

aida01 - 405
aida02 - no identifiable peak
aida05 - double peak
aida04 - 228
aida03 - 417

Grounding removed from all fees except pn bias fee aida01 and aida05. Grounding goes into both adaptor board and fee body

aida01 - 383
aida02 - no identifiable peak
aida05 - 64
aida04 - no identifiable peak
aida03 - no identifiable peak

Grounding on all fees. Grounding goes into adaptor board only

aida01 - no identifiable peak
aida02 - no identifiable peak
aida05 - 63  (wasn't changed)
aida04 - 700
aida03 - 700

Back to previous grounding on all fees

aida01 - 331
aida02 - 226
aida05 - 37
aida04 - 207
aida03 - 214

power cycle

aida01 - 326
aida02 - 238
aida05 - 46
aida04 - 212
aida03 - 195

Waveforms and discriminator back on

Removed test inputs and terminators from all fees, except aida03 (unable to reach) however the lemo is not touching the chamber
See attached waveforms compared to previous elog 32,33

Inserted test input to aida05 only directly from pulser. Width ~ 28

Inserted test input to aida01 only directly from pulser. Width ~ 329

Waveforms and discriminator off -> no impact on aida01 pulser width

Waveforms and discriminator back on

Connected a grounding cable from one of the water cooling pipes to cryring ground

aida01 ~ 205
aida05 ~ 23
aida02 ~ 105
aida03 ~ 71
aida04 ~ 148
Fees with bias attached to them aida01 (+ve) and aida04 (-ve) both show larger widths than there polarity counterpart
waveform screencap 34,35

Fee probe
7.46V left most bar
-6.26V 2nd bar
5.26V 3rd bar
5.26V 4th bar
5.25V 5th bar

Power supply probe
Top -6.05
2nd -6.05
3rd -6.05
4th +6.49
5th -7.78

new Ortec 448 pulser swapped in
aida04 ~ 166
aida05 ~ 21

Attachment 7-11 oscilloscope picture when probing fee relay power supply. Power ON fees connected. Top is attachment 7, bottom (5th) is attachment 11.  
Attachment 12-16 old pulser 
Attachment 17-18 new pulser
Attachment 19-23 oscilloscope picture when probing fee relay power supply. Power OFF fees connected. Top is attachment 19, bottom (5th) is attachment 23.
Attachment 24-28 oscilloscope picture when probing fee relay power supply. Power ON, fees disconnected. Top is attachment 24, bottom (5th) is attachment 28.
Attachment 29,30 probe-scope setup    
Attachment 1: 33.PNG
33.PNG
Attachment 2: 32.PNG
32.PNG
Attachment 3: 31.PNG
31.PNG
Attachment 4: 30.PNG
30.PNG
Attachment 5: 34.PNG
34.PNG
Attachment 6: 35.PNG
35.PNG
Attachment 7: 20220812_163204.jpg
20220812_163204.jpg
Attachment 8: 20220812_163230.jpg
20220812_163230.jpg
Attachment 9: 20220812_163319.jpg
20220812_163319.jpg
Attachment 10: 20220812_163339.jpg
20220812_163339.jpg
Attachment 11: 20220812_163411.jpg
20220812_163411.jpg
Attachment 12: 20220812_163526.jpg
20220812_163526.jpg
Attachment 13: 20220812_163601.jpg
20220812_163601.jpg
Attachment 14: 20220812_163650.jpg
20220812_163650.jpg
Attachment 15: 20220812_163705.jpg
20220812_163705.jpg
Attachment 16: 20220812_163744.jpg
20220812_163744.jpg
Attachment 17: 20220812_165322.jpg
20220812_165322.jpg
Attachment 18: 20220812_165330.jpg
20220812_165330.jpg
Attachment 19: 20220812_165619.jpg
20220812_165619.jpg
Attachment 20: 20220812_165639.jpg
20220812_165639.jpg
Attachment 21: 20220812_165652.jpg
20220812_165652.jpg
Attachment 22: 20220812_165704.jpg
20220812_165704.jpg
Attachment 23: 20220812_165717.jpg
20220812_165717.jpg
Attachment 24: 20220812_165812.jpg
20220812_165812.jpg
Attachment 25: 20220812_165839.jpg
20220812_165839.jpg
Attachment 26: 20220812_165849.jpg
20220812_165849.jpg
Attachment 27: 20220812_165900.jpg
20220812_165900.jpg
Attachment 28: 20220812_165911.jpg
20220812_165911.jpg
Attachment 29: 20220812_170337.jpg
20220812_170337.jpg
Attachment 30: 20220813_113236.jpg
20220813_113236.jpg
  378   Sun Aug 14 06:50:58 2022 TD, JMSunday 14 August
07.51 DAQ continues files 22Feb/R97

      ASIC settings 2022Jan31-11-52-00
       slow comparator 0x64

      EG&G Ortec 448 Pulser OFF

      All system wide checks OK

Attachment 1 - ADC data item stats

Attachment 2 - FEE64 temps OK

Attachments 3 & 4, 8 & 9 - per FEE64 1.8.W spectra 20us FSR and 200us FSR

Attachments 5 & 6 - per FEE64 1.8.L spectra

Attachment 7 - per FEE64 stat spectra

Leakage current remains 8.36 uA, 100V. 

Bias power OFF, SIP ion pump power back ON. NIM crate powered off. Motors pi and nnrpi1 still on for remote access. 
Compressed air off, water off. Fee relay power off and power cable disconnected. Motors box off. Safety pin for motors reinserted. 

Checked cable harnesses at cryring. 2 good short sections found and left with boxes in cryring. 2 damaged long sections (bad pin and broken ceramic) taken to repair in 
Edinburgh.
Attachment 1: 60.PNG
60.PNG
Attachment 2: 59.PNG
59.PNG
Attachment 3: 58.PNG
58.PNG
Attachment 4: 57.PNG
57.PNG
Attachment 5: 56.PNG
56.PNG
Attachment 6: 55.PNG
55.PNG
Attachment 7: 54.PNG
54.PNG
Attachment 8: 61.PNG
61.PNG
Attachment 9: 62.png
62.png
Attachment 10: 20220814_091209.jpg
20220814_091209.jpg
  480   Mon Jan 29 15:32:08 2024 TD, JMMonday 29 January contd.
Test + and test - daisy chain cabling extended from DSSSD #1 to #2 to DSSSD #1 to DSSSD #4
 terminated by 50 Ohm at end of daisy chain

Grounding cabling extended from DSSSD #1 ( only ) to DSSSD #1 to DSSSD #4
 grounding cables daisy-chained between 4x adaptor PCBs of each DSSSD - no inter-DSSSD grounding cables

DSSSD#1 bias cable SHV-Lemo 00.250 ( to p+n bias adaptor PCB )
DSSSD#2 - DSSSD #4 bias cables SHV - 2x Lemo 00.250 ( to p+n/n+n bias adaptor PCBs )

LK1 fitted for DSSSD #1 & #2 n+n Ohmic side bias adaptor PCBs
LK2 not fitted on any adaptor PCBs? to be checked

CAEN N1419ET internal jumper fitted ( non-floating outputs )? to be checked

16.54 DSSSD bias OK - see attachment 1

      FEE64 temperatures - attachment 2
       aida06 ASIC temp low

      System wide checks and WR - attachments 3-6
       global clock status aid04 0x6, aida06 0x4
       multiple FPGA timestamp and WR decoder errors for MACBs 4 and 5 ( of 5 )

       WR timestamps OK for aida01-aida08 ( w/ MACB firmware version 04/20 )

     ADC data item stats - attachment 7
      all rates consistent with 50Hz pulser *except* 
       aida11 global clock fail
       aida07 no boot
       aida16 no power
       aida06 ? 
       aida15 faulty asic #2

     per FEE64 Rate spectra - attachment 8

     per p+n and n+n FEE64 1.8.L spectra - attachments 9-12
      Pulser peak width p+n side 52 ch FWHM ( aida12 ), n+n side 70 ch FWHM ( aida14 )

     per p+n and n+n 1.8.W spectra - 20us FSR - attachments 13-16
Attachment 1: Screenshot_from_2024-01-29_16-54-37.png
Screenshot_from_2024-01-29_16-54-37.png
Attachment 2: Screenshot_from_2024-01-29_16-56-12.png
Screenshot_from_2024-01-29_16-56-12.png
Attachment 3: Screenshot_from_2024-01-29_16-55-07.png
Screenshot_from_2024-01-29_16-55-07.png
Attachment 4: Screenshot_from_2024-01-29_16-55-24.png
Screenshot_from_2024-01-29_16-55-24.png
Attachment 5: Screenshot_from_2024-01-29_16-55-39.png
Screenshot_from_2024-01-29_16-55-39.png
Attachment 6: Screenshot_from_2024-01-29_16-55-53.png
Screenshot_from_2024-01-29_16-55-53.png
Attachment 7: Screenshot_from_2024-01-29_16-59-13.png
Screenshot_from_2024-01-29_16-59-13.png
Attachment 8: Screenshot_from_2024-01-29_17-03-10.png
Screenshot_from_2024-01-29_17-03-10.png
Attachment 9: Screenshot_from_2024-01-29_17-05-44.png
Screenshot_from_2024-01-29_17-05-44.png
Attachment 10: Screenshot_from_2024-01-29_17-06-15.png
Screenshot_from_2024-01-29_17-06-15.png
Attachment 11: Screenshot_from_2024-01-29_17-08-53.png
Screenshot_from_2024-01-29_17-08-53.png
Attachment 12: Screenshot_from_2024-01-29_17-09-23.png
Screenshot_from_2024-01-29_17-09-23.png
Attachment 13: Screenshot_from_2024-01-29_17-11-01.png
Screenshot_from_2024-01-29_17-11-01.png
Attachment 14: Screenshot_from_2024-01-29_17-11-39.png
Screenshot_from_2024-01-29_17-11-39.png
Attachment 15: Screenshot_from_2024-01-29_17-12-26.png
Screenshot_from_2024-01-29_17-12-26.png
Attachment 16: Screenshot_from_2024-01-29_17-13-06.png
Screenshot_from_2024-01-29_17-13-06.png
  541   Thu Apr 18 13:34:06 2024 TD, JGThursday 18 April
14.30 


       per FEE64 1.8.L spectra
        aida11 pulser peak width 52 ch FWHM



14.45 EG&G Ortec 448 Pulser OFF

      all stats & histograms zero'd
 
      alpha background


22.00 DSSSD bias and leakage current OK - attachment 10

      FEE64 temperatures OK - attachment 11

      ADC data item stats - attachment 12

      per FEE64 Stat spectra - attachment 13
       Comparison of attachment 9 (per FEE64 Rate spectra with pulser) indicates significant issues (downstream of adaptor PCB) for DSSSD #1
       Possible issues asics #3 aida01 and possible adaptor PCB misalignment aida05
Attachment 1: Screenshot_from_2024-04-18_14-22-41.png
Screenshot_from_2024-04-18_14-22-41.png
Attachment 2: Screenshot_from_2024-04-18_14-23-10.png
Screenshot_from_2024-04-18_14-23-10.png
Attachment 3: Screenshot_from_2024-04-18_14-23-51.png
Screenshot_from_2024-04-18_14-23-51.png
Attachment 4: Screenshot_from_2024-04-18_14-24-18.png
Screenshot_from_2024-04-18_14-24-18.png
Attachment 5: Screenshot_from_2024-04-18_14-27-33.png
Screenshot_from_2024-04-18_14-27-33.png
Attachment 6: Screenshot_from_2024-04-18_14-28-26.png
Screenshot_from_2024-04-18_14-28-26.png
Attachment 7: Screenshot_from_2024-04-18_14-31-14.png
Screenshot_from_2024-04-18_14-31-14.png
Attachment 8: Screenshot_from_2024-04-18_14-32-31.png
Screenshot_from_2024-04-18_14-32-31.png
Attachment 9: Screenshot_from_2024-04-18_14-43-27.png
Screenshot_from_2024-04-18_14-43-27.png
Attachment 10: Screenshot_from_2024-04-18_21-57-51.png
Screenshot_from_2024-04-18_21-57-51.png
Attachment 11: Screenshot_from_2024-04-18_21-58-31.png
Screenshot_from_2024-04-18_21-58-31.png
Attachment 12: Screenshot_from_2024-04-18_21-59-11.png
Screenshot_from_2024-04-18_21-59-11.png
Attachment 13: Screenshot_from_2024-04-18_21-59-35.png
Screenshot_from_2024-04-18_21-59-35.png
  262   Wed Feb 23 21:27:29 2022 TD, CNcheck

Motor position ok

Data rate: 1030kbytes/s

T ok

System wide check ok

plots uploaded

 

Attachment 1: Screenshot_from_2022-02-23_22-29-36.png
Screenshot_from_2022-02-23_22-29-36.png
Attachment 2: Screenshot_from_2022-02-23_22-30-24.png
Screenshot_from_2022-02-23_22-30-24.png
Attachment 3: Screenshot_from_2022-02-23_22-33-23.png
Screenshot_from_2022-02-23_22-33-23.png
Attachment 4: Screenshot_from_2022-02-23_22-36-57.png
Screenshot_from_2022-02-23_22-36-57.png
Attachment 5: Screenshot_from_2022-02-23_22-37-22.png
Screenshot_from_2022-02-23_22-37-22.png
Attachment 6: Screenshot_from_2022-02-23_22-39-50.png
Screenshot_from_2022-02-23_22-39-50.png
Attachment 7: Screenshot_from_2022-02-23_22-41-08.png
Screenshot_from_2022-02-23_22-41-08.png
Attachment 8: Screenshot_from_2022-02-23_22-42-51.png
Screenshot_from_2022-02-23_22-42-51.png
Attachment 9: Screenshot_from_2022-02-23_22-43-16.png
Screenshot_from_2022-02-23_22-43-16.png
Attachment 10: Screenshot_from_2022-02-23_22-43-39.png
Screenshot_from_2022-02-23_22-43-39.png
Attachment 11: Screenshot_from_2022-02-23_22-46-52.png
Screenshot_from_2022-02-23_22-46-52.png
  552   Fri May 10 21:23:35 2024 TD, CB, JM20Ne7+ test beam

22.00

Carsten Brandau stopping e-target experiment Unattended beam overnight. No operators watching.

10^5 (nominal) 20Ne7+ at 380keV/u beam available

Carsten reports beam is unstable, often disappearing, and in bunched mode.

4x MSL type TTT14 DSSSDs not moving, locked in out position

Starting CARME MIDAS DAQ ASIC settings 2024Apr24-14.14.03

slow comparator 0x64 E

G&G Ortec 448 Pulser OFF

DSSSD bias & leakage currents - attachment 1

FEE64 temperatures OK - attachment 2

All system wide checks OK, WR timestamps OK - attachment 3

ADC data item stats - attachment 4

Rates dominated by two hot channels aida15 per FEE64 Stat spectra - attachment 5

per FEE64 1.8.L spectra - attachments 6-7 no obvious beam energy peak, continuum of energies from below beam energy to threshold

per FEE64 1.8.W spectra - attachments 8-9

 

22.55 Start data file APR24/R5 Merger, TapeServer etc - attachments 10-12

270k data items/s

 

23:29 Activated CARMESort script. See attachments 13-15.

No obvious beam or signal of any kind. Temperatures OK.

 

00:13 DAQ continues OK. System-wide check OK. Temps OK. Still no clear sign of beam.

 

01:03 Daq continues OK. System wide checks OK, Temps OK.

Only low energies observed in the energy spectrum. Looks a bit like the low energy noise observed in our previous runs with no/very few counts above what would be beam energy (~7.6 MeV)

Note the xy plots are not all orientated correctly (strips are correct in the sort code but root axis need to be flipped - I can;t remember how atm). The part of the plots with counts are those closest to the beam. 

02:00 DAQ continues OK. System wide checks OK. Temps OK.

Spectra still looks the same. I have noticed the right hand side rate is higher than the left. EyEx cut spectrum also looks like much more counts outside of the cut.

03:40

DAQ continues. All checks and temps OK.

I can now see a small peak at 5 MeV in the bottom left dssd. This dssd also has the least number of counts in the low energy continuum.

I have logged back into grafana on x2go to get the number ions in the ring. Attachment 17

04:23 (05:23 EU)

DAQ stopped, merger stopped, tape server stopped. Bias OFF. FEEs turned OFF. Screen shots taken of the monitoring code plots - not yet uploaded.

Windows and servers remain up in case we want to do some more tests in the near future.

Attachment 18 shows beam intensity for total run time from Grafana

Attachment 1: Screenshot_from_2024-05-10_22-31-48.png
Screenshot_from_2024-05-10_22-31-48.png
Attachment 2: Screenshot_from_2024-05-10_22-32-52.png
Screenshot_from_2024-05-10_22-32-52.png
Attachment 3: Screenshot_from_2024-05-10_22-33-45.png
Screenshot_from_2024-05-10_22-33-45.png
Attachment 4: Screenshot_from_2024-05-10_22-34-59.png
Screenshot_from_2024-05-10_22-34-59.png
Attachment 5: Screenshot_from_2024-05-10_22-37-12.png
Screenshot_from_2024-05-10_22-37-12.png
Attachment 6: Screenshot_from_2024-05-10_22-38-32.png
Screenshot_from_2024-05-10_22-38-32.png
Attachment 7: Screenshot_from_2024-05-10_22-39-48.png
Screenshot_from_2024-05-10_22-39-48.png
Attachment 8: Screenshot_from_2024-05-10_22-40-38.png
Screenshot_from_2024-05-10_22-40-38.png
Attachment 9: Screenshot_from_2024-05-10_22-41-24.png
Screenshot_from_2024-05-10_22-41-24.png
Attachment 10: Screenshot_from_2024-05-10_22-56-53.png
Screenshot_from_2024-05-10_22-56-53.png
Attachment 11: Screenshot_from_2024-05-10_22-56-20.png
Screenshot_from_2024-05-10_22-56-20.png
Attachment 12: Screenshot_from_2024-05-10_22-56-35.png
Screenshot_from_2024-05-10_22-56-35.png
Attachment 13: Screenshot_from_2024-05-10_23-28-37.png
Screenshot_from_2024-05-10_23-28-37.png
Attachment 14: Screenshot_from_2024-05-10_23-28-45.png
Screenshot_from_2024-05-10_23-28-45.png
Attachment 15: Screenshot_from_2024-05-10_23-28-51.png
Screenshot_from_2024-05-10_23-28-51.png
Attachment 16: Screenshot_from_2024-05-11_00-12-43.png
Screenshot_from_2024-05-11_00-12-43.png
Attachment 17: 20240511_025056.jpg
20240511_025056.jpg
Attachment 18: 20240511_042236.jpg
20240511_042236.jpg
  147   Wed Nov 10 14:41:12 2021 TD RSS + CB (remotely)Wrapping CARME in heating tape
ML reports that baking of the upstream section (gas jet interaction chamber plus e-target) has commenced - initially to 50 deg C to check thermocouples. If OK baking 
temperature will be ramped slowly (which I think means c. 10 deg C per h) to limits established for specific components by the e-target.

Ragan and Oemer are currently threading a 10m heating tape helically around the CARME chamber.

16.20 ML reports baking of upstream section is proceeding OK - currently ramping to 100 deg C at 10 deg C / h.

16.25 RSS reports that he completed the install of the thermocouples this morning and will update the Elog with specific locations of each thermocuple and TC08 channel 
later today.

16:30 All CARME thermocouples <20 C. No temperature changes. Monitor.x left under screen. Please summon with screen -x and dismiss with CTRL+a d

17:40 One CARME thermocouple at 40C (CARME front)
ELOG V3.1.4-unknown