AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME, Page 12 of 34
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
662 Entries
Goto page
Previous
1
,
2
,
3
...
11
, 12,
13
...
32
,
33
,
34
Next
ID
Date
Author
Subject
Text
447
Thu Sep 28 09:19:50 2023
TD
Thursday 28 September
10.20 CARME IE514 8.6e-11 mbar
446
Wed Sep 27 15:56:41 2023
TD
Wednesday 27 September
16.55 CARME IE514 8.2e-11 mbar
445
Tue Sep 26 10:13:14 2023
TD
ELOTECH PID Temperature Controller R4000 manual ( German and English )
444
Tue Sep 26 08:08:42 2023
TD
Tuesday 26 September
09.07 IE514 pressure 6.4e-11 mbar, ambient
temperature +20.3 deg C
7x
443
Mon Sep 25 16:33:32 2023
TD
Removed tape from heaters TC
17.33 IE514 pressure 6.4e-11 mbar, ambient
temperature +20.8 deg C
442
Fri Sep 22 12:35:46 2023
JM
Bakeout plots
Attached are plots for the previous bakeout
of CARME which may aid in the bakeout to
come in the following week.
441
Wed Sep 13 15:00:39 2023
ML
Vacuum and Heater temperature plots from Grafana
Attached are the plotted curves from vacuum
and heater temperature (actual and set values
from ISOHEAT controllers) during the bakeout
440
Sat Sep 2 10:04:55 2023
CB
Turbo GV closed
Found CARME in XHV at 1.1E-11 mbar. Chamber
temperature around 30C cooling slowly.
Closed GV to top turbo. Pressure
439
Fri Sep 1 08:11:40 2023
CB
NEG activation - 2
9:10 Set heaters temperature 300 ->
250 C in preparation for cooling down and
to help keep DSSD temperature down. Started
438
Thu Aug 31 08:36:34 2023
CB
NEG activation
Found CARME at 50C, a bit cooler than expected,
probably due to invasive tent changes yesterday
to mount missing wires. Increased heaters
437
Wed Aug 30 10:28:36 2023
CB
Preparing for pumps on
We need to connect the non-bakeable (max
80C) wire of the ion pump belonging to the
vacuum division, and we also need to connect
436
Wed Aug 30 09:33:13 2023
CB, OG
NEG cables repaired
Repaired Neg wires for D2000 with Oemer's
help.
Cable #2 is fine.
435
Mon Aug 14 09:22:56 2023
JM
Bakeout
14/08/23
Temperature in the baking volume
is ~ 42 C and the pressure is 4.6e-8 mbar.
434
Sat Aug 12 15:06:51 2023
JM
Initial bakeout tests
12/08/23
Baking testing. Aim to find relationship
between heater temperature setpoint and the
433
Sat Aug 12 11:57:51 2023
JM
Updated thermocouple positions and heater channel layouts
Heater channel layouts for the interaction
chamber and carme in attached documents.
Updated thermocouple positions;
6x
431
Thu Aug 10 07:51:43 2023
JM
Baking tent and heater testing
09/08/23
Attached is the current pumpdown
plot taken from grafana.
8x
430
Thu Jul 27 09:43:56 2023
RSS
Thermocouples connected -2
10:30 IE514 1.80e-08mbar
Most
of the CARME is covered by the baking tent.
The tent needs to be closed and a bit covered
429
Wed Jul 26 08:28:09 2023
RSS
Building tent
09:26 IE514 1.96e-08mbar
428
Tue Jul 25 09:12:15 2023
RSS
Building tent
10:10 IE514 2.0e-08mbar
Upstream
part of the CARME is covered.
427
Mon Jul 24 10:40:14 2023
RSS, TD
Pump down continues
11.40 Pirani 1.00e-3 mbar IE514 2.23e-08mbar
15.15 7d/24h vacuum plots
Goto page
Previous
1
,
2
,
3
...
11
, 12,
13
...
32
,
33
,
34
Next
ELOG V3.1.4-unknown