AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 12 of 34  ELOG logo
ID Date Author Subject Text Attachments
  447   Thu Sep 28 09:19:50 2023 TDThursday 28 September
10.20 CARME IE514 8.6e-11 mbar
 1000007142.jpg1000007143.jpg 
  446   Wed Sep 27 15:56:41 2023 TDWednesday 27 September
16.55 CARME IE514 8.2e-11 mbar
 1000007129.jpg1000007127.jpg1000007128.jpg 
  445   Tue Sep 26 10:13:14 2023 TDELOTECH PID Temperature Controller R4000 manual ( German and English )   BA-Isoheat_R4000-XX-X-000-X-X_DE_V1.03.pdfR4000-XX-X-000-X-X_EN_V1.30.pdf 
  444   Tue Sep 26 08:08:42 2023 TDTuesday 26 September09.07 IE514 pressure 6.4e-11 mbar, ambient
temperature +20.3 deg C
 7x 
  443   Mon Sep 25 16:33:32 2023 TDRemoved tape from heaters TC
17.33 IE514 pressure 6.4e-11 mbar, ambient
temperature +20.8 deg C
 1000007072.jpg1000007067.jpg1000007070.jpg 
  442   Fri Sep 22 12:35:46 2023 JMBakeout plotsAttached are plots for the previous bakeout
of CARME which may aid in the bakeout to
come in the following week.  
 Heater-chamber-temps.pngpressure-chamber-temp.pngHeater-power-chamber-temp.pngHeater-power-temp.png 
  441   Wed Sep 13 15:00:39 2023 MLVacuum and Heater temperature plots from GrafanaAttached are the plotted curves from vacuum
and heater temperature (actual and set values
from ISOHEAT controllers) during the bakeout
 Screenshot_2023-09-13_15-56-34.pngScreenshot_2023-09-13_15-58-06.pngScreenshot_2023-09-13_15-59-37.pngScreenshot_2023-09-13_15-59-01.pngScreenshot_2023-09-13_15-58-31.png 
  440   Sat Sep 2 10:04:55 2023 CBTurbo GV closed Found CARME in XHV at 1.1E-11 mbar. Chamber
temperature around 30C cooling slowly.

Closed GV to top turbo. Pressure
  
  439   Fri Sep 1 08:11:40 2023 CBNEG activation - 29:10 Set heaters temperature 300 ->
250 C in preparation for cooling down and
to help keep DSSD temperature down. Started
  
  438   Thu Aug 31 08:36:34 2023 CBNEG activation Found CARME at 50C, a bit cooler than expected,
probably due to invasive tent changes yesterday
to mount missing wires. Increased heaters
  
  437   Wed Aug 30 10:28:36 2023 CBPreparing for pumps onWe need to connect the non-bakeable (max
80C) wire of the ion pump belonging to the
vacuum division, and we also need to connect
  
  436   Wed Aug 30 09:33:13 2023 CB, OGNEG cables repaired Repaired Neg wires for D2000 with Oemer's
help.

Cable #2 is fine. 
 20230830_102519.jpg20230830_102514.jpg 
  435   Mon Aug 14 09:22:56 2023 JMBakeout14/08/23

Temperature in the baking volume
is ~ 42 C and the pressure is 4.6e-8 mbar.
 20230814_150430.jpg20230815_094400.jpgHeater-power.pngHeater-ITC-temp.pngPressure-ITC-temp.png 
  434   Sat Aug 12 15:06:51 2023 JMInitial bakeout tests12/08/23

Baking testing. Aim to find relationship
between heater temperature setpoint and the
 20230813_114600.jpg20230813_132550.jpg20230813_170829.jpg20230813_205613.jpg20230813_210238.jpg 
  433   Sat Aug 12 11:57:51 2023 JMUpdated thermocouple positions and heater channel layoutsHeater channel layouts for the interaction
chamber and carme in attached documents. 

Updated thermocouple positions;
 6x 
  431   Thu Aug 10 07:51:43 2023 JMBaking tent and heater testing09/08/23

Attached is the current pumpdown
plot taken from grafana. 
 8x 
  430   Thu Jul 27 09:43:56 2023 RSSThermocouples connected -2
10:30  IE514 1.80e-08mbar

Most
of the CARME is covered by the baking tent.
The tent needs to be closed and a bit covered
 IMG_9920.jpgIMG_9919.jpg 
  429   Wed Jul 26 08:28:09 2023 RSSBuilding tent
09:26  IE514 1.96e-08mbar
 IMG_9897.jpgIMG_9899.jpgIMG_9901.jpgIMG_9902.jpg 
  428   Tue Jul 25 09:12:15 2023 RSSBuilding tent
10:10  IE514 2.0e-08mbar

Upstream
part of the CARME is covered.
 BD01C0C8-5181-49B8-8751-AD4C99A459CC.jpeg7B3836F1-8A7E-491B-AFDC-46033BF84760.jpeg 
  427   Mon Jul 24 10:40:14 2023 RSS, TDPump down continues11.40 Pirani 1.00e-3 mbar IE514 2.23e-08mbar

15.15 7d/24h vacuum plots
 vacplot.pngvacplot24.png 
ELOG V3.1.4-unknown