ID |
Date |
Author |
Subject |
Text |
 |
|
202
|
Wed Feb 16 21:41:11 2022 |
JM | Run 43 Alpha Background | 22:41
Check Leakage current: (see attachment
1) = 10.01 uA and falling |
8x |
|
529
|
Mon Feb 19 05:10:48 2024 |
TD | Run 42 night shift contd. | 06.03 DAQ continues file G22-86/R42_32
DSSSD bias & leakage current - attachments |
6x |
|
528
|
Sun Feb 18 22:03:56 2024 |
TD | Run 42 night shift |
23.03 DAQ continues file G22-86/R42_21
|
47x |
|
530
|
Mon Feb 19 06:01:17 2024 |
SHB, JM, JG | Run 42 morning shift | 07:00
Observed reduction in YR09 presure
over last few hours in ML online plot. Beam |
6x |
|
527
|
Sun Feb 18 13:58:33 2024 |
AR, OF, JM | Run 42 - cooled beam on target | Run 42 - 15:00
Detectors IN (left arm pot =36.54
mm, right arm pot = 70.49 mm). Stationary. |
27x |
|
595
|
Fri Jun 7 10:05:40 2024 |
CB | Run 41/42/43 - 15N data taking start | 11:05
Confirmed overlap is at 4 mm under
new settings. |
8x |
|
200
|
Wed Feb 16 15:27:53 2022 |
EM, JM | Run 41 Pulser tests | 16:30
NOTE: Pulser is ON!
Check Leakage current: (see attachment |
11x |
|
525
|
Sun Feb 18 07:53:51 2024 |
HW AG | Run 40 Morning Shift | 08:57 Doing morning check. Checked the
leakage currents, all ok. Attachment 1
Tempritures of, attchment 2 |
27x |
|
524
|
Sun Feb 18 00:16:55 2024 |
JM CB | Run 40 - night shift | 01:17
Run 40 continues.
Beam intensity looks OK. Oscillates |
15x |
|
523
|
Sat Feb 17 14:29:03 2024 |
JM, CB, AR, AB | Run 40 - cooled beam on target | 15:27
Run 40 started cooled beam on target
Detectors IN (left arm pot =36.5 |
31x |
|
594
|
Thu Jun 6 16:23:10 2024 |
LB CB JM | Run 39 - Run 40 15N | Started run 39.
We have the 15N+ beam with 426 |
15x |
|
593
|
Thu Jun 6 05:44:45 2024 |
DR YL DB LB CB JM | Run 38 - 15N Tests | 06:45
All system checks OK
Target density 3.4e11 |
8x |
|
592
|
Wed Jun 5 13:34:02 2024 |
JM | Run 37 - Change in thresholds | 14:20
Target nozzle currently being replaced.
No beam |
|
|
591
|
Wed Jun 5 13:21:45 2024 |
JM, CB | Run 36 - pulser walkthrough | 14:00
Access to the cave as Nikos and
Andreas have begun work on the target. |
   |
|
520
|
Fri Feb 16 22:03:27 2024 |
TD | Run 35 - night shift |
22.51 DAQ continues file G22-86/R35_36
|
49x |
|
519
|
Fri Feb 16 10:02:41 2024 |
JM, OF, CB, AR, EM | Run 35 - cooled beam on target | 11:01
Run 35 started cooled beam on target
Detectors IN (left arm pot =36.5 |
27x |
|
521
|
Sat Feb 17 06:19:27 2024 |
JM, CB | Run 35 - contd | 07:10
FEE temperatures OK
System checks OK |
    |
|
588
|
Tue Jun 4 18:08:04 2024 |
Boudefla Dounia - CB - LB - SD | Run 34 | 19:08
Beam energy = 3 MeV.
Horizontal beam position = 4.0 |
19x |
|
587
|
Tue Jun 4 15:25:36 2024 |
BD US CB | Run 33 | 16:26
Merger OK, Tape server OK
ADC data item statistics looks |
   |
|
586
|
Tue Jun 4 14:13:17 2024 |
JM, CB, DB, US | Run 32- beam only background | 15:15
Run 32 started - Beam, no target
Beam energy = 3 MeV. |
|