Entry  Thu Jan 27 14:04:34 2022, OH, JM, Remote access to CARME server 
1. ssh into lxpool network: ssh <user>@lxpool.gsi.de
2. ssh into atppc022.gsi.de: ssh carme@atppc022.gsi.de (This is an rpi access server. Don't run code)
3. ssh into carme server: ssh npg@carme-gsi
Entry  Thu Jan 27 15:19:18 2022, OH, JM, Enabling internet access on the carme-gsi server 
To use both anydesk and firefox on the carme server require an internet connection.

As the server is on the cryring local network an ssh tunnel needs to be opened to the GSI proxy server.
Entry  Thu Jan 27 15:24:02 2022, OH, JM, Access to Motors PI 
1. ssh <user>@lxpool.gsi.de
2. ssh <user or carme>@atppc022.gsi.de
3. ssh pi@CARMEmotorspi (Standard npg password)
Entry  Thu Feb 10 09:12:41 2022, OH, CB, US, Hourly motor movement 220209_1014_leakage.png220210_1443_BiasFeeOn.png
To test effect of the motors on the leakage current, they were cycled once per hour overnight at approximately 50 minutes past the hour. - attachment 1
Leakgage current was seen to decrease slowly overnight before flattening out.
Entry  Wed Feb 9 08:01:41 2022, OH, CB, G-HC, Results from no beam overnight 220209_0852_leakage.png220209_0900_leakage_shake.png
08:52 Overnight the DAQ was left running to check if there was any individual radioactivity in the Si.
      This is stored in R7_75
Entry  Tue Feb 8 08:13:53 2022, OH, CB, DF, Hopefully effect of beam tuning on detectors 9x
09:00 Detector still biased to 60V and leakage current has been mostly stable overnight.
      Only minor fluctuations observed - attachment 1
Entry  Mon Feb 7 08:09:50 2022, OH, CB and PH, CARME Server setup and initial tests 
09:09 Arrived at GSI for comissioning beamtime.
      CARME currently in a stopped state, with all FEEs powered off.
      Upper detector is biased with 80V and has a leakage current of 9.92uA.
Entry  Mon Oct 3 16:03:33 2022, OH, CB, TTT14 Photos 
Photos of the new TTT14 DSSD delivered to GSI.
Photos of detectors are broken up by photos of SN on box
To big to put on elog. Have uploaded to /Disk/ds-sopa-group/np/GSI/CARME/TTT14_Photos.zip and will change permissions to 777
Entry  Thu Feb 24 07:25:53 2022, OH (Remote), Recover of system after crash 
08:00 Woke up to message from Carlo explaining the server had crashed.
      Anydesked into the machine.
      Merger was showing just data transfer it was not showing Transfer => Merger
Entry  Tue Feb 22 09:10:48 2022, OH, Analysis of R54_14 R54_14_analyser.txt
Results of the fortran analyser programs for R54_14

No timewarps observed in the data
Entry  Tue Jun 11 19:44:48 2024, OF, SS, Target out and at He 
Target has been moved out and H2 switched off. Changed to He.

Nikos will repair nozzle tomorrow morning. Remote checks until then.
Entry  Tue Feb 20 09:57:57 2024, OF, AG, ML, Run 48 status check Screenshot_from_2024-02-20_11-06-48.pngScreenshot_from_2024-02-20_11-08-05.pngScreenshot_from_2024-02-20_11-12-26.pngScreenshot_from_2024-02-20_11-13-58.png2024-02-20_11-37-46-304.png
Doing morning check. Checked the leakage currents, all ok. Attachment 1

Temperatures ok, attchment 2

System wide check, all correct.
Entry  Tue Feb 20 13:20:44 2024, OF, AG, JG, ML, R48 status check Screenshot_from_2024-02-20_14-22-05.pngScreenshot_from_2024-02-20_14-22-49.pngScreenshot_from_2024-02-20_14-29-39.pngScreenshot_from_2024-02-20_14-34-55.png
Doing afternoon check. Checked the leakage currents, all ok. Attachment 1

Temperatures ok, attchment 2

System wide check, all correct.
Entry  Tue Feb 20 08:41:08 2024, OF, AG, still no beam CRYRING 
We have mosty empty injections into CRYRING. Only sporadically the beam with good intensity is injected.

Michael Lestinsky is currently working on the problem.
Entry  Wed Aug 18 11:58:49 2021, NTD RSS, Misc fittings and fasteners plus gasket inventory 22x
Attachments 1-3 fasteners, fittings found amongst earlier shipments. I assume that the STFC DL cleaned items are for the internal detector mount assembly.

Entry  Wed May 29 16:46:21 2024, NP, AB, PM, Run7 - Measurements only with ion beam. Screenshot_from_2024-05-29_21-49-57.pngScreenshot_from_2024-05-29_21-50-14.png
18:19 Start or run 7: In beam has been optimzed up to now by Zoran and Claude. ~7E7 particles at injection. From now on, only the injection beamline
is optimized by Operators.

Detectors IN (left arm pot =18.86 mm, right arm pot = 19.80 mm)
Entry  Tue Jun 17 19:10:07 2025, NH, PMH, Run 96 7x
20:00 - Go to YR cave to see what is going on

20:20 - Beam back
Entry  Tue Jan 30 14:04:30 2024, NH, [HowTo] Update MACB Firmware xusbdfwu.rulesxilinx.tar.gzxc2c128.mapmacb_apr20.jed
This is how to update the MACB firmware using the opensource tool xc3sprog

Entry  Tue Mar 1 10:35:59 2022, MS, SHB, next run on tape server tab 
old potentiometer position 19.1 mm

new run number: 83

new potentiometer position : 27.58 mm
Entry  Tue Mar 1 10:43:36 2022, MS, SHB, check  11x
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status': same

 