176
|
Thu Jan 27 14:04:34 2022 |
OH, JM | Remote access to CARME server | 1. ssh into lxpool network: ssh <user>@lxpool.gsi.de
2. ssh into atppc022.gsi.de: ssh carme@atppc022.gsi.de
(This is an rpi access server. Don't run |
|
177
|
Thu Jan 27 15:19:18 2022 |
OH, JM | Enabling internet access on the carme-gsi server | To use both anydesk and firefox on the carme
server require an internet connection.
|
|
179
|
Thu Jan 27 15:24:02 2022 |
OH, JM | Access to Motors PI | 1. ssh <user>@lxpool.gsi.de
2. ssh <user or carme>@atppc022.gsi.de
3. ssh pi@CARMEmotorspi (Standard npg password) |
|
191
|
Thu Feb 10 09:12:41 2022 |
OH, CB, US | Hourly motor movement | To test effect of the motors on the leakage
current, they were cycled once per hour overnight
at approximately 50 minutes past the hour. |
 |
190
|
Wed Feb 9 08:01:41 2022 |
OH, CB, G-HC | Results from no beam overnight | 08:52 Overnight the DAQ was left running to
check if there was any individual radioactivity
in the Si.
|
 |
189
|
Tue Feb 8 08:13:53 2022 |
OH, CB, DF | Hopefully effect of beam tuning on detectors | 09:00 Detector still biased to 60V and leakage
current has been mostly stable overnight.
Only minor fluctuations observed - |
9x |
188
|
Mon Feb 7 08:09:50 2022 |
OH, CB and PH | CARME Server setup and initial tests | 09:09 Arrived at GSI for comissioning beamtime.
CARME currently in a stopped state,
with all FEEs powered off.
|
|
379
|
Mon Oct 3 16:03:33 2022 |
OH, CB | TTT14 Photos | Photos of the new TTT14 DSSD delivered to
GSI.
Photos of detectors are broken up by photos |
|
266
|
Thu Feb 24 07:25:53 2022 |
OH (Remote) | Recover of system after crash | 08:00 Woke up to message from Carlo explaining
the server had crashed.
Anydesked into the machine.
|
|
232
|
Tue Feb 22 09:10:48 2022 |
OH | Analysis of R54_14 | Results of the fortran analyser programs for
R54_14
|
|
618
|
Tue Jun 11 19:44:48 2024 |
OF, SS | Target out and at He | Target has been moved out and H2 switched
off. Changed to He.
Nikos will repair nozzle tomorrow |
|
536
|
Tue Feb 20 09:57:57 2024 |
OF, AG, ML | Run 48 status check | Doing morning check. Checked the leakage
currents, all ok. Attachment 1
Temperatures ok, attchment 2 |
    |
537
|
Tue Feb 20 13:20:44 2024 |
OF, AG, JG, ML | R48 status check | Doing afternoon check. Checked the leakage
currents, all ok. Attachment 1
Temperatures ok, attchment 2 |
   |
534
|
Tue Feb 20 08:41:08 2024 |
OF, AG | still no beam CRYRING | We have mosty empty injections into CRYRING.
Only sporadically the beam with good intensity
is injected. |
|
44
|
Wed Aug 18 11:58:49 2021 |
NTD RSS | Misc fittings and fasteners plus gasket inventory | Attachments 1-3 fasteners, fittings found
amongst earlier shipments. I assume that
the STFC DL cleaned items are for the internal |
22x |
558
|
Wed May 29 16:46:21 2024 |
NP, AB, PM | Run7 - Measurements only with ion beam. | 18:19 Start or run 7: In beam has been
optimzed up to now by Zoran and Claude. ~7E7
particles at injection. From now on, only |
 |
756
|
Tue Jun 17 19:10:07 2025 |
NH, PMH | Run 96 | 20:00 - Go to YR cave to see what is going
on
|
7x |
482
|
Tue Jan 30 14:04:30 2024 |
NH | [HowTo] Update MACB Firmware | This is how to update the MACB firmware using
the opensource tool xc3sprog
|
   |
345
|
Tue Mar 1 10:35:59 2022 |
MS, SHB | next run on tape server tab | old potentiometer position 19.1 mm
new run number: 83
new potentiometer position : 27.58 |
|
346
|
Tue Mar 1 10:43:36 2022 |
MS, SHB | check | 'Check Clock Status', 'Check
ADC Calibration' and 'Check the White
rabbit decoder status': same |
11x |