AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 14 of 33  ELOG logo
Entry  Fri May 26 09:08:06 2023, JM, CB, Detector movement  20230525_135756.jpgdetector-movement-in.mp4
Entry  Fri May 26 08:53:54 2023, JM, CB, Strain reliefs (flange side) installed strain-relief-flange-side.jpgstrain-relief1_(1).mp420230526_140923.jpgV-I-plot.png
Entry  Wed May 24 09:54:56 2023, JM, CB, Maximum detector positions 9x
Entry  Wed May 24 08:35:12 2023, JM, CB, Strain reliefs (detector side) installed 20230524_092010.jpg20230524_092017.jpg20230524_092101.jpg20230524_093000.jpg20230524_092159.mp4
Entry  Mon May 15 07:34:22 2023, TD, Monday 15 May 
Entry  Sun May 14 11:55:12 2023, TD, Sunday 14 May 
Entry  Sat May 13 11:34:25 2023, TD, RSS, Saturday 13 May 
Entry  Fri May 12 16:24:20 2023, RSS, TD, V-I test 8x
Entry  Thu May 11 21:22:54 2023, RSS, TD, V-I test 7x
Entry  Wed May 10 19:06:18 2023, RSS, TD, V-I test detector_1.pngdetector_2.pngdetector_3.pngdetector_4.png
Entry  Tue May 2 15:02:09 2023, CB, JM, All detectors and harnesses mounted  20230502_153410.jpg20230502_153503.jpg20230502_153509.jpg20230502_153511.jpg
Entry  Mon May 1 18:21:18 2023, CB, JM, All detectors mounted  20230501_191533.jpg20230501_191511.jpg20230501_145740.jpg
Entry  Mon May 1 08:26:09 2023, CB, JM, Left hand detectors remounted  
Entry  Sun Apr 30 10:01:39 2023, CB, JM, Left hand detectors unmounted  26x
Entry  Sat Apr 29 10:12:58 2023, CB, JM, CARME opened 8x
Entry  Thu Apr 27 19:43:23 2023, CB, JM, Preparing to open  20230427_123456.jpg20230427_161602.jpg
Entry  Wed Apr 26 16:49:28 2023, CB, JM, CARME dolly mostly built  20230426_152121.jpg20230426_162619.jpg20230426_162627.jpg
Entry  Tue Apr 25 13:22:19 2023, JM, CARME venting  20230425_134119.jpg20230425_132944.jpg
Entry  Mon Apr 24 21:24:26 2023, JM, Preparation for CARME dismount 20230424_155635.jpg20230424_155607.jpg20230424_150526.jpg
Entry  Wed Mar 22 16:33:32 2023, TD, NIM WR source 8x
ELOG V3.1.4-unknown