|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
CARME, Page 14 of 33 |
 |
|
Fri May 26 09:08:06 2023, JM, CB, Detector movement 
|
Fri May 26 08:53:54 2023, JM, CB, Strain reliefs (flange side) installed   
|
Wed May 24 09:54:56 2023, JM, CB, Maximum detector positions 9x
|
Wed May 24 08:35:12 2023, JM, CB, Strain reliefs (detector side) installed    
|
Mon May 15 07:34:22 2023, TD, Monday 15 May
|
Sun May 14 11:55:12 2023, TD, Sunday 14 May
|
Sat May 13 11:34:25 2023, TD, RSS, Saturday 13 May
|
Fri May 12 16:24:20 2023, RSS, TD, V-I test 8x
|
Thu May 11 21:22:54 2023, RSS, TD, V-I test 7x
|
Wed May 10 19:06:18 2023, RSS, TD, V-I test   
|
Tue May 2 15:02:09 2023, CB, JM, All detectors and harnesses mounted   
|
Mon May 1 18:21:18 2023, CB, JM, All detectors mounted  
|
Mon May 1 08:26:09 2023, CB, JM, Left hand detectors remounted
|
Sun Apr 30 10:01:39 2023, CB, JM, Left hand detectors unmounted 26x
|
Sat Apr 29 10:12:58 2023, CB, JM, CARME opened 8x
|
Thu Apr 27 19:43:23 2023, CB, JM, Preparing to open 
|
Wed Apr 26 16:49:28 2023, CB, JM, CARME dolly mostly built  
|
Tue Apr 25 13:22:19 2023, JM, CARME venting 
|
Mon Apr 24 21:24:26 2023, JM, Preparation for CARME dismount  
|
Wed Mar 22 16:33:32 2023, TD, NIM WR source 8x
|
|