AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 13 of 33  ELOG logo
Entry  Thu Jul 20 08:29:26 2023, TD, Installing tent. Two NEG power cable broken. 11x
Entry  Wed Jul 19 08:17:26 2023, TD, Leak testing 
Entry  Tue Jul 18 08:16:28 2023, TD, Pumping down. Issues found with one detector. 
Entry  Mon Jul 17 08:45:11 2023, TD, Closing CARME again 20230717_093106.jpg
Entry  Fri Jul 14 08:27:17 2023, TD, CARME open - inspecting seal 
Entry  Thu Jul 13 08:46:44 2023, TD, Replacing wire seal 20230713_135351.jpg20230713_135416.jpg
Entry  Thu Jul 13 00:12:45 2023, JM, CB, CARME closed Bias110723.pngfullyin.jpgfullyin-measured.jpg
Entry  Thu Jul 13 00:12:19 2023, JM, CB, Bellow replaced 20230705_164523.jpg
Entry  Thu Jul 6 15:26:39 2023, JM, Leak update pumping.png
Entry  Wed Jul 5 19:27:13 2023, JM, Pump down and leak test pumping_1.pngpumping-zoom.pngsignal-2023-07-05-15-13-30-512.jpg
Entry  Tue Jul 4 17:08:08 2023, JM, Leak test and venting 20230704_135455.jpg20230704_174524.jpg
Entry  Mon Jun 26 14:49:05 2023, JM, TD, CARME vented 
Entry  Sun Jun 25 14:30:06 2023, JM, TD, Motors bias test 
Entry  Sun Jun 25 10:08:30 2023, JM, TD, Pump-down  Figure_1.png20230625_120640.jpg20230625_120648.jpgpump-down.png
Entry  Sun Jun 25 09:41:06 2023, JM, TD, Normal turbo-pump operation 6x
Entry  Sat Jun 24 10:38:42 2023, JM, TD, Section 9 closed, begin pumping  23-06-23-VI.png24-06-23-VI.png
Entry  Thu Jun 22 18:58:02 2023, JM, TD, Slide back onto ring 20230622_112534.jpg20230622_112827.jpg20230622_120307.jpg
Entry  Wed Jun 21 18:47:36 2023, JM, TD, Closing CARME 20230621_104911.jpg20230621_104918.jpg20230621_110010.jpg21-06-23-VI.png
Entry  Fri May 26 09:08:06 2023, JM, CB, Detector movement  20230525_135756.jpgdetector-movement-in.mp4
Entry  Fri May 26 08:53:54 2023, JM, CB, Strain reliefs (flange side) installed strain-relief-flange-side.jpgstrain-relief1_(1).mp420230526_140923.jpgV-I-plot.png
ELOG V3.1.4-unknown