|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
CARME, Page 13 of 33 |
 |
|
Thu Jul 20 08:29:26 2023, TD, Installing tent. Two NEG power cable broken. 11x
|
Wed Jul 19 08:17:26 2023, TD, Leak testing
|
Tue Jul 18 08:16:28 2023, TD, Pumping down. Issues found with one detector.
|
Mon Jul 17 08:45:11 2023, TD, Closing CARME again
|
Fri Jul 14 08:27:17 2023, TD, CARME open - inspecting seal
|
Thu Jul 13 08:46:44 2023, TD, Replacing wire seal 
|
Thu Jul 13 00:12:45 2023, JM, CB, CARME closed  
|
Thu Jul 13 00:12:19 2023, JM, CB, Bellow replaced
|
Thu Jul 6 15:26:39 2023, JM, Leak update
|
Wed Jul 5 19:27:13 2023, JM, Pump down and leak test  
|
Tue Jul 4 17:08:08 2023, JM, Leak test and venting 
|
Mon Jun 26 14:49:05 2023, JM, TD, CARME vented
|
Sun Jun 25 14:30:06 2023, JM, TD, Motors bias test
|
Sun Jun 25 10:08:30 2023, JM, TD, Pump-down   
|
Sun Jun 25 09:41:06 2023, JM, TD, Normal turbo-pump operation 6x
|
Sat Jun 24 10:38:42 2023, JM, TD, Section 9 closed, begin pumping 
|
Thu Jun 22 18:58:02 2023, JM, TD, Slide back onto ring  
|
Wed Jun 21 18:47:36 2023, JM, TD, Closing CARME   
|
Fri May 26 09:08:06 2023, JM, CB, Detector movement 
|
Fri May 26 08:53:54 2023, JM, CB, Strain reliefs (flange side) installed   
|
|