AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 20 of 38  ELOG logo
Entry  Fri Aug 12 09:06:57 2022, TD, JM, Noise tests pt2 30x

10.07 DSSSD bias -100V leakage current -8.65uA
Entry  Thu Aug 11 09:25:13 2022, JM, TD, Noise tests 14x

Moved pneumatic motor in and out several revolutions

Biased detector up to 100 V, I ~ 12.4 uA ambient temp c. 21 deg C
Entry  Wed Aug 10 10:33:03 2022, TD, ML, JM, NP, Meeting at YR09 to discuss options for CARME operations to February 2022 20220810_111638.jpg20220810_095036.jpg20220810_095150.jpg20220810_095159.jpg

Initial discussions of proposals to provide open CARME chamber and provide access to near and far detector chambers
Entry  Wed Aug 10 10:30:04 2022, TD, JM, Wednesday 10 August 4.PNG3.PNG2.png1.png

09.45 Found CARME electrical power off
Entry  Tue Aug 9 16:07:33 2022, JM, TD, Anydesk setup command line 
To log into appc218 desktop:
same login and password as to carme@atppc022.gsi.de

To start anydesk
Entry  Tue Aug 9 13:44:16 2022, TD, JM, Tuesday 9 August Capture_1.PNG20220809_163450.jpg20220809_135840.jpg20220809_135833.jpg20220809_135801.jpg

14.00 CARME vacuum c. 1.8e-10 mbar - see attachment 1
Entry  Thu Mar 3 15:14:21 2022, JM, OH, CARME packing up 
Pulser walkthrough taken for motor position 23.1mm and motor position 67.43mm.

Points taken at 30,50,70,90,110,130,150,170,190,210,230 for 23.1mm position and 230,210,190,170,150,130,110 for 67.43mm position.

Motors moved to fully OUT position and pin put back in. Current positions before closing program 19.1mm and 19.57mm. 
Entry  Wed Mar 2 22:29:48 2022, CB, SD, Last shift with beam 9x
22:30 Shift handed over. DAQ OK. Target OK. Beam OK.

 

00:22 Temperatures OK
Entry  Wed Mar 2 21:16:06 2022, JM, PM, Current status 
22:16

Temperature setpoint = 113k

Not observed noise burst again
Entry  Wed Mar 2 19:25:25 2022, JM, PM, Current status 10x
20:25

Observed short burst of low energy noise on aida1, lasted <30s (attachment 8).

Temperature setpoint = 113 K
Entry  Wed Mar 2 17:21:35 2022, JM, PM, Current status 8x
18:21

Temperature setpoint = 113k

Target density OK S1 varies between 2E-8 and 2.5E-8 mbar, E4 between 1E-9 and 5E-9 mbar. (slightly lower than previous check)
Entry  Wed Mar 2 14:15:16 2022, JM, PM, Current status 6x
15:15

Temperature setpoint = 113 K

Target density is OK for now. S1 vaies between 2E-8 and 3.5E-8 mbar. E4 between 1E-9 and 1E-8 mbar.
Entry  Wed Mar 2 09:38:50 2022, Spillmann, Uwe, ion source restarted 
 

detector position

out: 23.1mm
Entry  Wed Mar 2 06:00:49 2022, Spillmann, Uwe, waiting 
07:00
Target density is hovering between 2.0e-8 and 2.3e-8
Entry  Wed Mar 2 03:40:40 2022, David, George, Temperature Cycle 
04:40
Target density is hovering between 2.0e-8 and 2.3e-8, sometimes dipping below 2.0e-8

We will conduct a temperature walkthrough while there is no beam,
Entry  Wed Mar 2 01:24:48 2022, David, George, Ion Source Update 
02:25
Zoran was unable to ignite the ion source.

He has given some parameters to the control room so they can wiggle stuff around and try and ignite it.
Entry  Tue Mar 1 23:43:15 2022, David, George, Beam Intensity Drop 
00:38
Intensity in the ring dropped by 2 orders of magnitude to 5e5 on injection

Lost rutherford rate (as seen in last e-log post)
Entry  Tue Mar 1 23:30:04 2022, David, George, Current status 2022-03-02_00-39-47xytotal.png2022-03-02_00-39-20exRate.png2022-03-02_00-38-44extotal.png
00:30
Pressure in S1 slightly decreased from before but still high enough to measure data.
One new count at 20MeV
Entry  Tue Mar 1 22:10:26 2022, David, George, Current status 2022-03-01_23-14-43aida.png2022-03-01_23-13-57exrate.png2022-03-01_23-13-40xyto.png2022-03-01_23-13-10extot.png
Ring current 6.67e7 particles/s

pressure at S1: 2.3-2.8e-8

Merger, Tape server (WS3): 1574 kB/s, writing ok
Entry  Tue Mar 1 21:34:06 2022, PM, LV, check 14x
no change:

Check Clock Status': Passed 5, Failed 0

Check ADC Calibration: Passed 5, Failed 0
ELOG V3.1.4-unknown