228
|
Tue Feb 22 05:47:18 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 - 2 events at 10MeV! | 06:47
Beam ON ~2.0E6 pps, still fluctates
between 1e6 and 6e6 (like a step function) |
11x |
734
|
Tue Jun 10 16:46:39 2025 |
JM, CB, EW, AY, PC | 150 keV - Run64 | Run 64 started.
150 keV/u beam on target, Target
overlap confirmed with lifetime measurement |
42x |
596
|
Fri Jun 7 14:09:04 2024 |
JM, CB, DR, CN, LB | Run 44 - 15N Data Taking | 15:35
Electron cooler voltage set point
= 244.3 V |
|
586
|
Tue Jun 4 14:13:17 2024 |
JM, CB, DB, US | Run 32- beam only background | 15:15
Run 32 started - Beam, no target
Beam energy = 3 MeV. |
|
523
|
Sat Feb 17 14:29:03 2024 |
JM, CB, AR, AB | Run 40 - cooled beam on target | 15:27
Run 40 started cooled beam on target
Detectors IN (left arm pot =36.5 |
31x |
15
|
Thu Sep 17 10:13:43 2020 |
JM, CB(remotely) | Bakeout cooling and pumping of chamber | The Chamber has continued to pump overnight
and we have reached a pressure of 3.3e-6
mbar as of 10:15. Power cable for the hot |
 |
16
|
Fri Sep 18 10:28:57 2020 |
JM, CB(remotely) | Baking status | 10:28
Reducing temperature in steps. System cooling
down. See attached.
|
|
30
|
Mon Oct 26 10:35:05 2020 |
JM, CB(remotely) | Cooling | 10:10 Pressure on the chamber = 3.1e-8mbar.
RE-72 temperatures are ~120-125C with set
limits at 80C. D2000 temperatures are |
   |
11
|
Mon Sep 14 12:07:40 2020 |
JM, CB (remotely) | Baking status | Mon 14 Sep 09:50
Jordan moved the TC08 picolog 2 away from |
   |
22
|
Sat Sep 26 09:31:46 2020 |
JM, CB (both remotely) | Baking over weekend | Sat 26 Sep
09:15 Baking started automatic
mode |
   |
192
|
Sat Feb 12 19:48:38 2022 |
JM, CB | Grounding and movement tests | > Initial grounding see final grounding
from elog 187. ASIC settings for all - LEC
slow comparator 0x64. Note on 11/02/22 1.8*L |
11x |
193
|
Sun Feb 13 21:28:35 2022 |
JM, CB | Alpha background Run 32, 35 | Alpha background gathered from 17:35 12/2/22
to 13:44 13/2/22 is run32. Run time ~20 hours.
Some alphas visible in aida1 1*L histograms |
6x |
211
|
Fri Feb 18 20:31:33 2022 |
JM, CB | Alpha Background run 48 | Alpha background started with beam ON -
run47. Run started 16:49 18/2/22
(beam subsequently found to be OFF) |
|
212
|
Sat Feb 19 14:51:58 2022 |
JM, CB | Burst high energy noise | Noticed bursts of high energy noise on
aida01 and aida02 during run 47 and 48.
Good events rate jumps from 10-20k |
    |
213
|
Sat Feb 19 20:08:43 2022 |
JM, CB | Beam ON run 49 | Run started 19/2/22 21:05. Beam ON
Temperatures OK
System wide checks OK - white rabbit |
6x |
214
|
Sun Feb 20 22:04:21 2022 |
JM, CB | Alpha Background run 50 | Beam OFF. Run started 20/2/22 18:42
Fast comparator threshold HEC set
to 0xff for all fees and asics to combat |
|
402
|
Wed May 24 08:35:12 2023 |
JM, CB | Strain reliefs (detector side) installed | The new MACOR strain reliefs on the (detector
side) have been installed. See attached photos
The two pieces of MACOR are |
    |
403
|
Wed May 24 09:54:56 2023 |
JM, CB | Maximum detector positions | The detectors were moved into the beam
axis using the motors to check the maximum
distance they can be moved in without collision |
9x |
404
|
Fri May 26 08:53:54 2023 |
JM, CB | Strain reliefs (flange side) installed | Strain reliefs on the flange side of the
cable harness have been installed for two
detectors (top right and bottom right detectors). |
   |
405
|
Fri May 26 09:08:06 2023 |
JM, CB | Detector movement | Hopefully we will not be opening the chamber
for quite some time so find attached images
of all four installed detectors and a video |
 |
|