AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 20 of 38  ELOG logo
ID Date Authordown Subject Text Attachments
  228   Tue Feb 22 05:47:18 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 - 2 events at 10MeV!06:47

Beam ON ~2.0E6 pps, still fluctates
between 1e6 and 6e6 (like a step function)
 11x 
  734   Tue Jun 10 16:46:39 2025 JM, CB, EW, AY, PC150 keV - Run64Run 64 started.

150 keV/u beam on target, Target
overlap confirmed with lifetime measurement
 42x 
  596   Fri Jun 7 14:09:04 2024 JM, CB, DR, CN, LBRun 44 - 15N Data Taking15:35

Electron cooler voltage set point
= 244.3 V
  
  586   Tue Jun 4 14:13:17 2024 JM, CB, DB, USRun 32- beam only background15:15

Run 32 started - Beam, no target

Beam energy = 3 MeV.
  
  523   Sat Feb 17 14:29:03 2024 JM, CB, AR, ABRun 40 - cooled beam on target15:27

Run 40 started cooled beam on target

Detectors IN (left arm pot =36.5
 31x 
  15   Thu Sep 17 10:13:43 2020 JM, CB(remotely)Bakeout cooling and pumping of chamberThe Chamber has continued to pump overnight
and we have reached a pressure of 3.3e-6
mbar as of 10:15. Power cable for the hot
 Photos.zip20200917_1428_temp_last.png 
  16   Fri Sep 18 10:28:57 2020 JM, CB(remotely)Baking status10:28
Reducing temperature in steps. System cooling
down. See attached.
 20200918_1029_temps.png 
  30   Mon Oct 26 10:35:05 2020 JM, CB(remotely)Cooling10:10 Pressure on the chamber = 3.1e-8mbar.
RE-72 temperatures are ~120-125C with set
limits at 80C. D2000 temperatures are
 Screenshot_from_2020-10-26_14-10-08.png20201027_0803_temps.png27102020_pump_down.png27102020_pump_down.png 
  11   Mon Sep 14 12:07:40 2020 JM, CB (remotely)Baking statusMon 14 Sep 09:50

Jordan moved the TC08 picolog 2 away from
 20200914_1207_temps.png20200914_1207_ctrl.png20200914_1727_temps.png20200914_2000_temps.png 
  22   Sat Sep 26 09:31:46 2020 JM, CB (both remotely)Baking over weekendSat 26 Sep

09:15 Baking started automatic
mode
 temps.pngtemps2.pngHeaters.jpg20200927_1732_temps.png 
  192   Sat Feb 12 19:48:38 2022 JM, CBGrounding and movement tests> Initial grounding see final grounding
from elog 187. ASIC settings for all - LEC
slow comparator 0x64. Note on 11/02/22 1.8*L
 11x 
  193   Sun Feb 13 21:28:35 2022 JM, CBAlpha background Run 32, 35Alpha background gathered from 17:35 12/2/22
to 13:44 13/2/22 is run32. Run time ~20 hours.
Some alphas visible in aida1 1*L histograms
 6x 
  211   Fri Feb 18 20:31:33 2022 JM, CBAlpha Background run 48Alpha background started with beam ON -
run47. Run started 16:49 18/2/22  
(beam subsequently found to be OFF)
 2022-02-19_14-45-25-leage-current.png 
  212   Sat Feb 19 14:51:58 2022 JM, CBBurst high energy noiseNoticed bursts of high energy noise on
aida01 and aida02 during run 47 and 48.

Good events rate jumps from 10-20k
 2022-02-19_15-50-50-aida1-4-stat-logscale.png2022-02-19_15-47-13-aida1-2*H.png2022-02-19_15-49-48-aida2-1*H.png2022-02-20_14-01-40-aida1-2*H.png2022-02-20_14-02-55-aida1-1*H.png 
  213   Sat Feb 19 20:08:43 2022 JM, CBBeam ON run 49Run started 19/2/22 21:05. Beam ON

Temperatures OK

System wide checks OK - white rabbit
 6x 
  214   Sun Feb 20 22:04:21 2022 JM, CBAlpha Background run 50 Beam OFF. Run started 20/2/22 18:42

Fast comparator threshold HEC set
to 0xff for all fees and asics to combat
  
  402   Wed May 24 08:35:12 2023 JM, CBStrain reliefs (detector side) installedThe new MACOR strain reliefs on the (detector
side) have been installed. See attached photos

The two pieces  of MACOR are
 20230524_092010.jpg20230524_092017.jpg20230524_092101.jpg20230524_093000.jpg20230524_092159.mp4 
  403   Wed May 24 09:54:56 2023 JM, CBMaximum detector positionsThe detectors were moved into the beam
axis using the motors to check the maximum
distance they can be moved in without collision
 9x 
  404   Fri May 26 08:53:54 2023 JM, CBStrain reliefs (flange side) installedStrain reliefs on the flange side of the
cable harness have been installed for two
detectors (top right and bottom right detectors). 
 strain-relief-flange-side.jpgstrain-relief1_(1).mp420230526_140923.jpgV-I-plot.png 
  405   Fri May 26 09:08:06 2023 JM, CBDetector movement Hopefully we will not be opening the chamber
for quite some time so find attached images
of all four installed detectors and a video
 20230525_135756.jpgdetector-movement-in.mp4 
ELOG V3.1.4-unknown