AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 20 of 38  ELOG logo
Entry  Tue Feb 22 05:47:18 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 - 2 events at 10MeV! 11x
Entry  Tue Jun 10 16:46:39 2025, JM, CB, EW, AY, PC, 150 keV - Run64 42x
Entry  Tue Aug 26 14:43:44 2025, JM, CB, EW, CARME on, background run  bias.png
Entry  Fri Jun 7 14:09:04 2024, JM, CB, DR, CN, LB, Run 44 - 15N Data Taking 
Entry  Tue Jun 4 14:13:17 2024, JM, CB, DB, US, Run 32- beam only background 
Entry  Sat Feb 17 14:29:03 2024, JM, CB, AR, AB, Run 40 - cooled beam on target 31x
Entry  Thu Sep 17 10:13:43 2020, JM, CB(remotely), Bakeout cooling and pumping of chamber Photos.zip20200917_1428_temp_last.png
Entry  Fri Sep 18 10:28:57 2020, JM, CB(remotely), Baking status 20200918_1029_temps.png
Entry  Mon Oct 26 10:35:05 2020, JM, CB(remotely), Cooling Screenshot_from_2020-10-26_14-10-08.png20201027_0803_temps.png27102020_pump_down.png27102020_pump_down.png
Entry  Mon Sep 14 12:07:40 2020, JM, CB (remotely), Baking status 20200914_1207_temps.png20200914_1207_ctrl.png20200914_1727_temps.png20200914_2000_temps.png
Entry  Sat Sep 26 09:31:46 2020, JM, CB (both remotely), Baking over weekend temps.pngtemps2.pngHeaters.jpg20200927_1732_temps.png
Entry  Sat Feb 12 19:48:38 2022, JM, CB, Grounding and movement tests 11x
Entry  Sun Feb 13 21:28:35 2022, JM, CB, Alpha background Run 32, 35 6x
Entry  Fri Feb 18 20:31:33 2022, JM, CB, Alpha Background run 48 2022-02-19_14-45-25-leage-current.png
Entry  Sat Feb 19 14:51:58 2022, JM, CB, Burst high energy noise 2022-02-19_15-50-50-aida1-4-stat-logscale.png2022-02-19_15-47-13-aida1-2*H.png2022-02-19_15-49-48-aida2-1*H.png2022-02-20_14-01-40-aida1-2*H.png2022-02-20_14-02-55-aida1-1*H.png
Entry  Sat Feb 19 20:08:43 2022, JM, CB, Beam ON run 49 6x
Entry  Sun Feb 20 22:04:21 2022, JM, CB, Alpha Background run 50  
Entry  Wed May 24 08:35:12 2023, JM, CB, Strain reliefs (detector side) installed 20230524_092010.jpg20230524_092017.jpg20230524_092101.jpg20230524_093000.jpg20230524_092159.mp4
Entry  Wed May 24 09:54:56 2023, JM, CB, Maximum detector positions 9x
Entry  Fri May 26 08:53:54 2023, JM, CB, Strain reliefs (flange side) installed strain-relief-flange-side.jpgstrain-relief1_(1).mp420230526_140923.jpgV-I-plot.png
ELOG V3.1.3-7933898