AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 25 of 38  ELOG logo
Entry  Fri Sep 29 08:54:29 2023, TD, Friday 29 September 11x
Entry  Fri Apr 26 07:05:01 2024, TD, Friday 26 April 19x
Entry  Fri Sep 25 12:58:33 2020, JM, Friday 25/09/20 Photos.zip
Entry  Fri Jan 19 11:17:50 2024, JG, TD, Friday 19 January 18x
Entry  Fri Apr 19 02:47:59 2024, TD, Friday 19 April 12x
Entry  Fri Oct 15 19:37:12 2021, RSS TD + DR, Friday 15 October 8x
Entry  Fri Jan 14 10:00:18 2022, TD, OH, JM, Friday 14 January 
Entry  Fri Aug 13 07:28:37 2021, RSS TD, Friday 13-17 August  23x
Entry  Wed Oct 13 12:06:09 2021, RSS TD, Flanges cleaned 12x
Entry  Fri Nov 5 12:27:11 2021, CB RSS + DR NP ML US, First pump down of YR09 20211105_131748.jpg20211105_135918.jpg20211105_135929.jpg20211105_140451.jpg20211105_150616.jpg
Entry  Wed Sep 8 10:52:54 2021, CB RSS + OG, First feedthrough flange mounted 20210908_101743.jpg20210908_111958.jpg20210908_112002.jpg20210908_112006.jpg20210908_112010.jpg
Entry  Mon Oct 5 08:21:40 2020, CB (remotely), JM, First bake of CARME with pumps (cont.) 6x
Entry  Wed Sep 30 08:10:36 2020, CB (remotely), First bake of CARME with pumps 19x
Entry  Fri Nov 12 08:54:11 2021, RSS ML + CB (remotely) NK AK NP, First CARME baking attempt Capture.PNG200W_heaters.svg40W_heater.svg
Entry  Mon Oct 12 10:49:36 2020, JM, First Bakeout of CARME with pumps (cont) temp6.png
Entry  Sat Apr 5 16:15:04 2025, TD, FEE64 power interlock installed 11x
Entry  Sun Jan 14 12:31:32 2024, JM, CB, FEE positions mac addresses CARME-FEEs.jpg
Entry  Sat Jan 15 15:38:25 2022, JM, OH, TD, FEE installation, cable management 20220114_104819.jpg20220114_105152.jpg20220114_105213.jpg20220115_133808.jpg20220115_133820.jpg
Entry  Wed Jan 12 20:07:20 2022, JM, OH, TD, FEE holder installation 10x
Entry  Wed Apr 24 13:18:09 2024, TD, Examples of poor CARME cable management/routing 20240424_125858.jpg20240424_125929.jpg
ELOG V3.1.4-unknown