Entry  Fri Sep 29 08:54:29 2023, TD, Friday 29 September 11x

09.50 CARME IE514 9.0e-11 mbar, ambient temperature 21.3 deg C
Entry  Fri Apr 26 07:05:01 2024, TD, Friday 26 April 19x

08.02 DAQ continues data file R1_14
Entry  Fri Sep 25 12:58:33 2020, JM, Friday 25/09/20 Photos.zip
10:00   Vessel P = 3.99e-8 mbar,  RGA P = 1.4e-6 mbar 

10:54   Vessel P = 3.89e-8 mbar,  RGA P = 1.4e-6 mbar

Vessel continues to pump down. Baking Jacket fully installed and testing of baking begins before leaving on automatic mode for the week. Some
Entry  Fri Jan 19 11:17:50 2024, JG, TD, Friday 19 January 18x

12.20 CARME IE514 4.1e-11mbar, ambient temperature 16.7 deg C
Entry  Fri Apr 19 02:47:59 2024, TD, Friday 19 April 12x

03.45
Entry  Fri Oct 15 19:37:12 2021, RSS TD + DR, Friday 15 October 8x
Ring seal is out. See picture 1.

Bellow (towards CARME) was installed in the gas jet chamber. Attached are some pictures.
Entry  Fri Jan 14 10:00:18 2022, TD, OH, JM, Friday 14 January 

11.00 Per https://elog.ph.ed.ac.uk/CARME/170 and https://elog.ph.ed.ac.uk/CARME/171 issues have been identified with the FEE64 carriers and adaptor PCBs
Entry  Fri Aug 13 07:28:37 2021, RSS TD, Friday 13-17 August  23x
Pirani  IE514
mbar    mbar
Entry  Wed Oct 13 12:06:09 2021, RSS TD, Flanges cleaned 12x
RSS & TD had some success cleaning the COF600 flange surfaces of the staining and residues observed when the downstream COF600 section was opened yesterday
 
https://elog.ph.ed.ac.uk/CARME/118
Entry  Fri Nov 5 12:27:11 2021, CB RSS + DR NP ML US, First pump down of YR09 20211105_131748.jpg20211105_135918.jpg20211105_135929.jpg20211105_140451.jpg20211105_150616.jpg
Tightened all flanges.

Added Pirani gauge and third IE514 to interaction chamber.

Stated pump down. Around 100 mbar on Interaction chamber Pirani gauge very loud metallic noise is heard. Found bellows between CARME and interaction
Entry  Wed Sep 8 10:52:54 2021, CB RSS + OG, First feedthrough flange mounted 20210908_101743.jpg20210908_111958.jpg20210908_112002.jpg20210908_112006.jpg20210908_112010.jpg
Assembled feedthrough flange with re-cut 
SS support bracket. M3 vented on the 
sides, M3x30 partly threaded on top. Top 
Entry  Mon Oct 5 08:21:40 2020, CB (remotely), JM, First bake of CARME with pumps (cont.) 6x
5 OCTOBER

08:21 Temperatures stable overnight. See attached. Baking continues.
Entry  Wed Sep 30 08:10:36 2020, CB (remotely), First bake of CARME with pumps 19x
(NOTE: Raspberry Pi internal clock appears to be on GMT, rather than GMT+1 due to daylight saving.)

Baking started on Mon 28 Sep. Due to WiFi connection authorisation expiring, no remote access was possible until
Entry  Fri Nov 12 08:54:11 2021, RSS ML + CB (remotely) NK AK NP, First CARME baking attempt Capture.PNG200W_heaters.svg40W_heater.svg
07:50 Small leaks (near the motors and upper valve) were detected in the tent which were covered with Al foil.

08:10 ML changed the baking temperature to 120 degrees.

09:40 Since the bottom of CARME is cold, due to uneven distribution of heat, baking is stopped.
Entry  Mon Oct 12 10:49:36 2020, JM, First Bakeout of CARME with pumps (cont) temp6.png
12 October 

10:00 Bakeout temperatures stable. Pressure on the backing line is 3e-7mbar which is the lowest we have achieved on the backing line so far.
Vessel pressure can't be measured at the moment as temperature exceeds the max operational temperature of 80C. 
Entry  Sat Apr 5 16:15:04 2025, TD, FEE64 power interlock installed 11x

Water flow and dew point sensors have been installed on the outlet and inlet cooling water manifolds respectively.
Entry  Sun Jan 14 12:31:32 2024, JM, CB, FEE positions mac addresses CARME-FEEs.jpg
*Updated following FEE changes. Correct as of 31/01/24

FEE modules are labelled according to the diagram in attachment. Note attachment is looking downstream. Each FEE module is also labelled with
its assigned number and whether it is a bias connection on the FEE holders. MAC addresses and FEE descriptions are as follows;
Entry  Sat Jan 15 15:38:25 2022, JM, OH, TD, FEE installation, cable management 20220114_104819.jpg20220114_105152.jpg20220114_105213.jpg20220115_133808.jpg20220115_133820.jpg
All 8 FEEs have been installed in their holders.

The damaged feedthrough does not have the D-connector on the adaptor board inserted into the falnge but the FEE is connected to the adaptor board. 

FEE's were carefully installed, with one person inserting FEE and another making sure FEE was straight and on the correct pin positions.
Entry  Wed Jan 12 20:07:20 2022, JM, OH, TD, FEE holder installation 10x
4 FEE holders installed on CARME. Mounting procedure devised due to limited working space to install.

Mounting procedure:
>Install FEE holder mounts (image 1) onto feedthrough flange
Entry  Wed Apr 24 13:18:09 2024, TD, Examples of poor CARME cable management/routing 20240424_125858.jpg20240424_125929.jpg

Have observed some instances of poor CARME cable management/routing
Attachment 1 - SAES D-2000 ion pump HV cable (netal braid) transiting FEE64 cabling