448
|
Fri Sep 29 08:54:29 2023 |
TD | Friday 29 September |
09.50 CARME IE514 9.0e-11 mbar, ambient temperature
21.3 deg C
|
11x |
|
547
|
Fri Apr 26 07:05:01 2024 |
TD | Friday 26 April |
08.02 DAQ continues data file R1_14
|
19x |
|
21
|
Fri Sep 25 12:58:33 2020 |
JM | Friday 25/09/20 | 10:00 Vessel P = 3.99e-8 mbar,
RGA P = 1.4e-6 mbar
10:54 Vessel P = 3.89e-8 |
|
|
476
|
Fri Jan 19 11:17:50 2024 |
JG, TD | Friday 19 January |
12.20 CARME IE514 4.1e-11mbar, ambient temperature
16.7 deg C
|
18x |
|
542
|
Fri Apr 19 02:47:59 2024 |
TD | Friday 19 April |
03.45
|
12x |
|
124
|
Fri Oct 15 19:37:12 2021 |
RSS TD + DR | Friday 15 October | Ring seal is out. See picture 1.
Bellow (towards CARME) was installed
in the gas jet chamber. Attached are some |
8x |
|
172
|
Fri Jan 14 10:00:18 2022 |
TD, OH, JM | Friday 14 January |
11.00 Per https://elog.ph.ed.ac.uk/CARME/170
and https://elog.ph.ed.ac.uk/CARME/171 issues |
|
|
42
|
Fri Aug 13 07:28:37 2021 |
RSS TD | Friday 13-17 August | Pirani IE514
mbar mbar
|
23x |
|
120
|
Wed Oct 13 12:06:09 2021 |
RSS TD | Flanges cleaned | RSS & TD had some success cleaning the COF600
flange surfaces of the staining and residues
observed when the downstream COF600 section |
12x |
|
143
|
Fri Nov 5 12:27:11 2021 |
CB RSS + DR NP ML US | First pump down of YR09 | Tightened all flanges.
Added Pirani gauge and third IE514
to interaction chamber. |
    |
|
63
|
Wed Sep 8 10:52:54 2021 |
CB RSS + OG | First feedthrough flange mounted | Assembled feedthrough flange with re-cut
SS support bracket. M3 vented on the
sides, M3x30 partly threaded on top. Top |
    |
|
25
|
Mon Oct 5 08:21:40 2020 |
CB (remotely), JM | First bake of CARME with pumps (cont.) | 5 OCTOBER
08:21 Temperatures stable overnight. See |
6x |
|
24
|
Wed Sep 30 08:10:36 2020 |
CB (remotely) | First bake of CARME with pumps | (NOTE: Raspberry Pi internal clock appears
to be on GMT, rather than GMT+1 due to daylight
saving.)
|
19x |
|
154
|
Fri Nov 12 08:54:11 2021 |
RSS ML + CB (remotely) NK AK NP | First CARME baking attempt | 07:50 Small leaks (near the motors and
upper valve) were detected in the tent which
were covered with Al foil. |
  |
|
26
|
Mon Oct 12 10:49:36 2020 |
JM | First Bakeout of CARME with pumps (cont) | 12 October
10:00 Bakeout temperatures stable.
Pressure on the backing line is 3e-7mbar |
|
|
663
|
Sat Apr 5 16:15:04 2025 |
TD | FEE64 power interlock installed |
Water flow and dew point sensors have been
installed on the outlet and inlet cooling |
11x |
|
467
|
Sun Jan 14 12:31:32 2024 |
JM, CB | FEE positions mac addresses | *Updated following FEE changes. Correct
as of 31/01/24
FEE modules are labelled according |
|
|
174
|
Sat Jan 15 15:38:25 2022 |
JM, OH, TD | FEE installation, cable management | All 8 FEEs have been installed in their
holders.
The damaged feedthrough does not |
    |
|
170
|
Wed Jan 12 20:07:20 2022 |
JM, OH, TD | FEE holder installation | 4 FEE holders installed on CARME. Mounting
procedure devised due to limited working
space to install. |
10x |
|
545
|
Wed Apr 24 13:18:09 2024 |
TD | Examples of poor CARME cable management/routing |
Have observed some instances of poor CARME
cable management/routing
|
 |