  448   Fri Sep 29 08:54:29 2023 TDFriday 29 September
09.50 CARME IE514 9.0e-11 mbar, ambient temperature
21.3 deg C
 11x 
  547   Fri Apr 26 07:05:01 2024 TDFriday 26 April
08.02 DAQ continues data file R1_14
 19x 
  21   Fri Sep 25 12:58:33 2020 JMFriday 25/09/2010:00   Vessel P = 3.99e-8 mbar, 
RGA P = 1.4e-6 mbar 

10:54   Vessel P = 3.89e-8
 Photos.zip 
  476   Fri Jan 19 11:17:50 2024 JG, TDFriday 19 January
12.20 CARME IE514 4.1e-11mbar, ambient temperature
16.7 deg C
 18x 
  542   Fri Apr 19 02:47:59 2024 TDFriday 19 April
03.45
 12x 
  124   Fri Oct 15 19:37:12 2021 RSS TD + DRFriday 15 OctoberRing seal is out. See picture 1.

Bellow (towards CARME) was installed
in the gas jet chamber. Attached are some
 8x 
  172   Fri Jan 14 10:00:18 2022 TD, OH, JMFriday 14 January
11.00 Per https://elog.ph.ed.ac.uk/CARME/170
and https://elog.ph.ed.ac.uk/CARME/171 issues
  
  42   Fri Aug 13 07:28:37 2021 RSS TDFriday 13-17 August Pirani  IE514
mbar    mbar
 23x 
  120   Wed Oct 13 12:06:09 2021 RSS TDFlanges cleanedRSS & TD had some success cleaning the COF600
flange surfaces of the staining and residues
observed when the downstream COF600 section
 12x 
  143   Fri Nov 5 12:27:11 2021 CB RSS + DR NP ML USFirst pump down of YR09Tightened all flanges.

Added Pirani gauge and third IE514
to interaction chamber.
 20211105_131748.jpg20211105_135918.jpg20211105_135929.jpg20211105_140451.jpg20211105_150616.jpg 
  63   Wed Sep 8 10:52:54 2021 CB RSS + OGFirst feedthrough flange mountedAssembled feedthrough flange with re-cut 
SS support bracket. M3 vented on the 
sides, M3x30 partly threaded on top. Top
 20210908_101743.jpg20210908_111958.jpg20210908_112002.jpg20210908_112006.jpg20210908_112010.jpg 
  25   Mon Oct 5 08:21:40 2020 CB (remotely), JMFirst bake of CARME with pumps (cont.)5 OCTOBER

08:21 Temperatures stable overnight. See
 6x 
  24   Wed Sep 30 08:10:36 2020 CB (remotely)First bake of CARME with pumps(NOTE: Raspberry Pi internal clock appears
to be on GMT, rather than GMT+1 due to daylight
saving.)
 19x 
  154   Fri Nov 12 08:54:11 2021 RSS ML + CB (remotely) NK AK NPFirst CARME baking attempt07:50 Small leaks (near the motors and
upper valve) were detected in the tent which
were covered with Al foil.
 Capture.PNG200W_heaters.svg40W_heater.svg 
  26   Mon Oct 12 10:49:36 2020 JMFirst Bakeout of CARME with pumps (cont)12 October 

10:00 Bakeout temperatures stable.
Pressure on the backing line is 3e-7mbar
 temp6.png 
  663   Sat Apr 5 16:15:04 2025 TDFEE64 power interlock installed
Water flow and dew point sensors have been
installed on the outlet and inlet cooling
 11x 
  467   Sun Jan 14 12:31:32 2024 JM, CBFEE positions mac addresses*Updated following FEE changes. Correct
as of 31/01/24

FEE modules are labelled according
 CARME-FEEs.jpg 
  174   Sat Jan 15 15:38:25 2022 JM, OH, TDFEE installation, cable managementAll 8 FEEs have been installed in their
holders.

The damaged feedthrough does not
 20220114_104819.jpg20220114_105152.jpg20220114_105213.jpg20220115_133808.jpg20220115_133820.jpg 
  170   Wed Jan 12 20:07:20 2022 JM, OH, TDFEE holder installation4 FEE holders installed on CARME. Mounting
procedure devised due to limited working
space to install.
 10x 
  545   Wed Apr 24 13:18:09 2024 TDExamples of poor CARME cable management/routing
Have observed some instances of poor CARME
cable management/routing
 20240424_125858.jpg20240424_125929.jpg 