AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  CARME, Page 27 of 38  ELOG logo
Entry  Tue Feb 22 21:57:13 2022, George, Jordan, Current status 2022-02-22_23-53-38-lowenergy-xytotal.png2022-02-22_23-50-45-Ex-rate-hist.png2022-02-22_23-49-20-Ex-total-hist.png20220223_002946.jpg
23:53

Temperatures OK

System checks OK - white rabbit fail diff ~ 80
Entry  Tue Feb 22 21:09:39 2022, David, Yuri, Current status 2022-02-22_22-12-55xytotal.png2022-02-22_22-12-21exrate.png2022-02-22_22-12-00extotal.png
Pressure seems as before 19:10.

Merger, Tape server (WS3) checks: DONE, writing ~1 MB/s, refreshing is fine

Leakage current (WS4): 3.47 uA , stable current
Entry  Tue Feb 22 20:08:40 2022, David, Yuri, Current status 2022-02-22_21-14-23exrate.png2022-02-22_21-14-01xytotal.png2022-02-22_21-13-11extotal.png
Recently the pressure started to raise a bit, we have increased the temperature from 129.1 K to 129.2 K. Current pressure at S1 2.10e-7.

Merger, Tape server (WS3) checks: DONE, writing ~1 MB/s, refreshing is fine

Leakage current (WS4): 3.46 uA , stable current
Entry  Tue Feb 22 19:28:35 2022, David, Yuri, vacuum 
At 19:10 Frank called us that vacuum in sections 08 and 10 got worse by about 1.5 times. There is a possible danger that vacuum valves can get closed
if rest gas pressure is above the set treshhold.

Nikos warmed the cryostat by 0.5 degrees from 129.0 K to 129.5 K and the pressure became better than before. We cooled the system in steps of
Entry  Tue Feb 22 19:11:18 2022, David, Current status 2022-02-22_20-16-26eyrate.png2022-02-22_20-15-34.eytotal.png
Still trying to recover previous pressures, more details in the next entry.

Merger, Tape server (WS3) checks: DONE, writing ~1030 kB/s, refreshing is fine

Leakage current (WS4): 3.46 uA , stable current
Entry  Tue Feb 22 18:23:02 2022, David. Yury, Vacuum problem 
At 19:10 the vacuum has increased suddenly everywhere in the ring, roughly a factor 1.5.
Entry  Tue Feb 22 17:32:38 2022, David, Current status 12x
Michael is modifying the settings of the electron cooler --> changed beam from bunched to coasting

Merger, Tape server (WS3) checks: DONE, writing ~1036 kB/s, refreshing is fine

Leakage current (WS4): 3.46 uA , stable current
Entry  Tue Feb 22 16:09:08 2022, David, Yury, Current status 12x
Merger, Tape server (WS3) checks: DONE, writing ~1 1273kB/s, refreshing is fine

Leakage current (WS4): 3.46 uA , stable current

DAQ (WS2): temperature checked, 
Entry  Tue Feb 22 14:32:04 2022, David, Yury, Current status 12x
Merger, Tape server (WS3) checks: DONE, writing ~1 MB/s, refreshing is fine

Leakage current (WS4): 3.48 uA , stable current

DAQ (WS2): temperature checked, 
Entry  Tue Feb 22 12:23:23 2022, CB, Slow comparator thresholds lowered - test run 
13:20 Stopped run.

Slow comp thresh 0x64 -> 0x32 on all FEEs

Checkload x2
Entry  Tue Feb 22 12:01:46 2022, RSS, OF, ML, CB, Beam OFF, Target ON Run 54  9x
01:00

Beam optimisation since 09:25.

Target ON and open to the ring
Entry  Tue Feb 22 10:30:00 2022, RSS, OF, ML, Beam OFF, Target ON Run 54  10x
11:30

Beam optimisation. No beam since 09:25.

Target ON and open to the ring
Entry  Tue Feb 22 10:06:50 2022, RSS, OF, ML, PMT channel 
YR00DA1ZB is the channel for PMT rate.
Entry  Tue Feb 22 09:10:48 2022, OH, Analysis of R54_14 R54_14_analyser.txt
Results of the fortran analyser programs for R54_14

No timewarps observed in the data
Entry  Tue Feb 22 08:31:25 2022, RSS, OF, ML, Beam OFF, Target ON Run 54  10x
09:30

Beam optimisation. No beam since 09:25.

Target ON and open to the ring
Entry  Tue Feb 22 07:27:28 2022, RSS, OF, ML, Beam ON, Target ON Run 54  10x
08:30

Beam ON ~1.0E7 pps

Target ON and open to the ring
Entry  Tue Feb 22 06:30:09 2022, RSS, OF, Beam ON, Target ON Run 54  10x
07:30

Beam ON ~8.0E6 pps

Target ON and open to the ring
Entry  Tue Feb 22 05:47:18 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 - 2 events at 10MeV! 11x
06:47

Beam ON ~2.0E6 pps, still fluctates between 1e6 and 6e6 (like a step function)

Target ON and open to the ring
Entry  Tue Feb 22 05:12:38 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  11x
06:00

Beam ON ~1.5E6 pps, still fluctates between 1e6 and 6e6 (like a step function)

Target ON and open to the ring
Entry  Tue Feb 22 04:09:28 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 - first event at 10MeV ! 11x
05:00

Beam ON ~2E6 pps, still fluctates between 2e6 and 6e6 (like a step function)

Target ON and open to the ring
ELOG V3.1.3-7933898