AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME, Page 29 of 35
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
700 Entries
Goto page
Previous
1
,
2
,
3
...
28
, 29,
30
...
33
,
34
,
35
Next
Selected entries:
ID
Date
Author
Subject
Text
140
Tue Nov 2 12:45:36 2021
CB + DR NK
Issues with CARME feet
Attempted to close CARME as carefully as
possible.
Swapped out one foot for another
139
Mon Nov 1 14:48:16 2021
CB + ML DR
CARME opened
Confirmed leak as per previous Elog.
Tightened to 100 Nm - no effects.
Tightened to 130 Nm - bottom leak
138
Sun Oct 31 13:55:13 2021
CB OH
Leak tests
Found CARME at 2E-7.
Closed valve on top of roughing
pump. Clamp was not tight. Pressure still
137
Sun Oct 31 08:05:15 2021
CB OH + DR ML
CARME closed again + feedthroughs labeled
(Fri 29 October)
Cleaned wire seal recess and labeled
thermocouples and flanges to identify p-n
11x
136
Sun Oct 31 07:55:39 2021
CB JM + OH
Strain relief mounted
(Thu 28 October)
All strain relief extension plates
mounted behind the wires, using SS countersunk
135
Sun Oct 31 07:41:20 2021
CB JM + RSS
Wires plugged in DSSDs
(Wed 27 October)
Started with top-most flange. Attemptedto
plug in MACOR lead in DSSD plug in preparation
8x
134
Sun Oct 31 07:29:17 2021
CB JM + RSS OG
Detectors mounted on plate in CARME
(Wed 27 October)
Dismounted plate from rod. Dismounted
broken detectors from plate and placed back
8x
133
Sun Oct 31 07:21:09 2021
CB JM RSS
Detectors arrived in GSI
(Tue 26 October)
Two new CARME DSSD arrived in GSI
and collected. Visually inspected both sides.
6x
132
Fri Oct 29 15:09:27 2021
CB JM + RSS OG DR
Preparation to mount new DSSDs
(Mon 25 October - Tue 26 October)
Considered different strategies
to mount DSSDs inside CARME, while waiting
6x
131
Sat Oct 23 12:58:11 2021
JM
GSI vacuum and bakeout testing summary
Attachment 1 shows the pump-down of the
CARME chamber at GSI before installation
of kapton cabling inside the chamber and
130
Fri Oct 22 13:22:48 2021
TD
CARME FEE64 adaptor PCB
10x
129
Fri Oct 22 13:11:26 2021
TD
MSL type TTT14 assembly drawings & pin assignments
128
Thu Oct 21 20:26:44 2021
JM TD
Thermocouple and Connector cables
NEG pump electrical connections tested
- all connections sound.
Detector carriers have been redrilled
10x
127
Mon Oct 18 16:25:11 2021
JM RSS TD
NEG rotation + cable removals
Kapton cabling and the broken ceramic detector
holder have been separated. Required holding
jacking plate in a vice and using lots of
126
Sun Oct 17 11:48:48 2021
TD RSS
Sunday 17 October
Looking downstream the RHS motor assembly
has loose green/yellow (gnd?) see attachment
1
14x
125
Sat Oct 16 17:25:47 2021
RSS TD
Broken detectors
One of the detectors was damaged while
mounting (see pictures 1-3).
Second detector was found already
124
Fri Oct 15 19:37:12 2021
RSS TD + DR
Friday 15 October
Ring seal is out. See picture 1.
Bellow (towards CARME) was installed
in the gas jet chamber. Attached are some
8x
123
Thu Oct 14 15:54:47 2021
TD RSS
Thursday 14 October
Attachment 1 - what is function of the 4x
c/s holes indicated?
122
Wed Oct 13 15:28:22 2021
RSS TD + OG
Split funnels
Split funnels installed on 4 (of 8) 2x78
way D connector feed-throughs.
7x
121
Wed Oct 13 15:16:12 2021
TD
Orientation of 2x 78 way D connector feedthroughs
Looking downstream
Goto page
Previous
1
,
2
,
3
...
28
, 29,
30
...
33
,
34
,
35
Next
ELOG V3.1.4-unknown