Entry  Tue Sep 7 11:37:05 2021, CB RSS + OG, Update on strain relief screw issues 
Tested every strain relief. M3 screws get stuck at different points in each hole. Only one good hole out of 16
(2x8).
They were tested in Edinburgh - unclear if this is a result of baking at high temperatures, or bad screws, or
Entry  Tue Sep 7 14:10:02 2021, CB RSS + OG, Strain relief SS support re-drilled 
Re-drilled SS supports in order to fit M3 screws.

Used hand tool cleaned with alchool for 6 of the 8.
Entry  Wed Sep 8 10:52:54 2021, CB RSS + OG, First feedthrough flange mounted 20210908_101743.jpg20210908_111958.jpg20210908_112002.jpg20210908_112006.jpg20210908_112010.jpg
Assembled feedthrough flange with re-cut 
SS support bracket. M3 vented on the 
sides, M3x30 partly threaded on top. Top 
Entry  Thu Sep 9 13:01:07 2021, CB RSS + OG, All feedthrough flanges mounted and motor rotated 20210909_111933.jpg20210909_112120.jpg20210909_112125.jpg20210909_133027.jpg
Moved cables that touched neg pumps. See 
photos. Please bear in mind perspective.
Note avoiding touching chamber 
Entry  Wed Nov 3 16:39:01 2021, CB RSS + NP DR NK ML, Interaction chamber lifted in place 20211103_161553.jpg20211103_161813.jpg20211103_175457.jpg
Prepared to move interaction chamber in place. Ok CARME side, flange has M10 bolts. On interaction chamber side i.e. bellows it has M8 bolts.

DS designed this to have loose fit under assumption of  M10 side actually being 3/8 holes i.e. 9.9 mm. However holes are 10.2 mm. Furthermore
Grossmontage suggest loose fit will be damaged in baking in the long term.
Entry  Tue Aug 31 18:34:41 2021, CB RSS + DR OG, CARME on Al stand 20210831_144545.jpg20210831_171442.jpg20210831_171447.jpg20210831_171449.jpg20210831_171453.jpg
Lifted CARME off the floor and mounted feet on sides. It was found impossible to put four bolts for each foot
due to alignment conflict. Three bolts were mounted per foot instead.
Entry  Thu Sep 2 10:41:16 2021, CB RSS + DR OG, CARME connected to the CRYRING 20210902_114031.jpg
Connected CARME to the CRYRING via tube 
plus bellows. See attach.
Entry  Fri Nov 5 12:27:11 2021, CB RSS + DR NP ML US, First pump down of YR09 20211105_131748.jpg20211105_135918.jpg20211105_135929.jpg20211105_140451.jpg20211105_150616.jpg
Tightened all flanges.

Added Pirani gauge and third IE514 to interaction chamber.

Stated pump down. Around 100 mbar on Interaction chamber Pirani gauge very loud metallic noise is heard. Found bellows between CARME and interaction
Entry  Wed Nov 3 11:18:11 2021, CB RSS + DR NK ML, Leak closed 20211103_110244.jpg20211103_110414.jpg
Found CARME at 1.0E-6 mbar. Beginning leak test.

 

Found leaks in the same location as before. Roughly 1~3E-8 mbar l second vs. base leak of 1E-12
Entry  Wed Sep 1 17:14:16 2021, CB RSS + DR ML, CARME mounted on the CRYRING 20210901_162435.jpg20210901_173059.jpg20210901_174157.jpg20210901_134635.jpg20210901_173059.jpg
Lifted CARME with Al support on the 
CRYRING. No issues during transportation. 
Entry  Tue Aug 31 07:09:54 2021, CB RSS (rem) JM, Preparation for mounting 6x
(30 August 2021)

The current state of YR09 is as per attach 1. CCC has been removed, but additional pumps and gauges remain. Some
Entry  Tue Aug 31 11:55:11 2021, CB RSS, Last preparations for CARME lift 16304077162843806956479048661374.jpg16304077904321905824276870110392.jpg
Found strut bolts in the bag with 
spherical washers. Mounted the struts and 
the washers. See attach 1.
Entry  Wed Sep 1 12:05:28 2021, CB RSS, Preparation for CARME on CRYRING YR09 20210901_125504.jpg20210901_125517.jpg
Mounted additional cross member for motor 
support. See attach 1
Entry  Fri Sep 3 08:12:39 2021, CB RSS, Pressure after overnight pump down 20210903_085646.jpgIMG_4487.JPG
03.09.2021   09:00   5.27E-7 mbar     
03.09.2021   13:00   4.08E-7 mbar                   
Entry  Fri Sep 3 08:14:51 2021, CB RSS, Issues foreseeable splitting CARME 7x
In order to install the detector supports 
and eventually install the detectors 
themselves CARME must be split and 
Entry  Fri Sep 3 15:55:00 2021, CB RSS, Issues with cable clamps 20210903_154614.jpg20210903_162519.jpg
Attempted to mount cable clamps for strain 
relief on inner part of Allectra 
feedthroughs.
Entry  Sat Sep 4 15:54:50 2021, CB RSS, Motor mounting preparation 20210904_162517.jpg20210904_162520.jpg
Prepared the motors to be mounted and 
found all components required. No issues. 
May have to partly dismount again to fix 
Entry  Sat Sep 11 16:01:44 2021, CB RSS, Preparations for shutdown turbo_pump.pnglog_scale.png
Found CARME pressure at 2E-7 mbar

Raspberry pi took pictures until 4 am and 
Entry  Tue Oct 5 17:30:01 2021, CB RSS, NEG activation tests 20211005_131259.jpg20211005_171403.jpg20211005_161317.jpg
Found D2000 #1 activated and at 250C (25W) 
to prevent getting dirty when other NEGs 
are activated. See previous entries.
Entry  Wed Oct 6 09:47:30 2021, CB RSS, Neg activation tests -2 
Attempted activating 2xUHV1400 connected to top C4, channel #3 with P 300 W (450 C?), t rise 30 min, t hold 90
min as yesterday