AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 33 of 38  ELOG logo
Entry  Wed Nov 3 16:39:01 2021, CB RSS + NP DR NK ML, Interaction chamber lifted in place 20211103_161553.jpg20211103_161813.jpg20211103_175457.jpg
Entry  Tue Aug 31 18:34:41 2021, CB RSS + DR OG, CARME on Al stand 20210831_144545.jpg20210831_171442.jpg20210831_171447.jpg20210831_171449.jpg20210831_171453.jpg
Entry  Thu Sep 2 10:41:16 2021, CB RSS + DR OG, CARME connected to the CRYRING 20210902_114031.jpg
Entry  Fri Nov 5 12:27:11 2021, CB RSS + DR NP ML US, First pump down of YR09 20211105_131748.jpg20211105_135918.jpg20211105_135929.jpg20211105_140451.jpg20211105_150616.jpg
Entry  Wed Nov 3 11:18:11 2021, CB RSS + DR NK ML, Leak closed 20211103_110244.jpg20211103_110414.jpg
Entry  Wed Sep 1 17:14:16 2021, CB RSS + DR ML, CARME mounted on the CRYRING 20210901_162435.jpg20210901_173059.jpg20210901_174157.jpg20210901_134635.jpg20210901_173059.jpg
Entry  Tue Aug 31 07:09:54 2021, CB RSS (rem) JM, Preparation for mounting 6x
Entry  Tue Aug 31 11:55:11 2021, CB RSS, Last preparations for CARME lift 16304077162843806956479048661374.jpg16304077904321905824276870110392.jpg
Entry  Wed Sep 1 12:05:28 2021, CB RSS, Preparation for CARME on CRYRING YR09 20210901_125504.jpg20210901_125517.jpg
Entry  Fri Sep 3 08:12:39 2021, CB RSS, Pressure after overnight pump down 20210903_085646.jpgIMG_4487.JPG
Entry  Fri Sep 3 08:14:51 2021, CB RSS, Issues foreseeable splitting CARME 7x
Entry  Fri Sep 3 15:55:00 2021, CB RSS, Issues with cable clamps 20210903_154614.jpg20210903_162519.jpg
Entry  Sat Sep 4 15:54:50 2021, CB RSS, Motor mounting preparation 20210904_162517.jpg20210904_162520.jpg
Entry  Sat Sep 11 16:01:44 2021, CB RSS, Preparations for shutdown turbo_pump.pnglog_scale.png
Entry  Tue Oct 5 17:30:01 2021, CB RSS, NEG activation tests 20211005_131259.jpg20211005_171403.jpg20211005_161317.jpg
Entry  Wed Oct 6 09:47:30 2021, CB RSS, Neg activation tests -2 
Entry  Wed Oct 6 15:36:14 2021, CB RSS, Neg activation tests -3 
Entry  Thu Oct 7 08:40:09 2021, CB RSS, CARME in XHV 
Entry  Fri Oct 8 17:56:35 2021, CB RSS, Motors test 20211008_184731.jpg20211008_184731.jpg
Entry  Sat Oct 9 09:44:36 2021, CB RSS, Heaters removed + motors tests 
ELOG V3.1.4-unknown