ID |
Date |
Author |
Subject |
Text |
 |
657
|
Wed Jun 19 12:08:34 2024 |
CB + various | Run 101-105 | Run 101: no target. See ELOG entry by TD.
Run 102: ??
Run 103: ?? |
|
655
|
Wed Jun 19 12:04:02 2024 |
CB + OF, SS | Run 96/97 | Run 96 - as run 89, while we wait for beam
energy change at higher energies
Run stopped around 08:56 |
|
162
|
Wed Nov 24 12:08:08 2021 |
CB + ML OG | Ion pumps on | Found SIP power unit for D2000 #4 not functioning
correctly. Max current regardless of ion
element connected to. |
  |
139
|
Mon Nov 1 14:48:16 2021 |
CB + ML DR | CARME opened | Confirmed leak as per previous Elog.
Tightened to 100 Nm - no effects.
Tightened to 130 Nm - bottom leak |
|
161
|
Tue Nov 23 08:49:33 2021 |
CB + ML | NEG activation completed | Found temperatures and pressure stabilised
overnight. See attached.
12:00 Began activation of 3x UHV1400 |
   |
140
|
Tue Nov 2 12:45:36 2021 |
CB + DR NK | Issues with CARME feet | Attempted to close CARME as carefully as
possible.
Swapped out one foot for another |
|
94
|
Wed Sep 29 09:27:38 2021 |
CB (remotely), RSS JM ML | Power cut | Sudden and unexpected power cut at 10:02 German
time, affecting all the target hall.
|
|
12
|
Tue Sep 15 08:39:26 2020 |
CB (remotely), JM | Baking and Chamber status | Tuesday 15 September
08:40
|
    |
25
|
Mon Oct 5 08:21:40 2020 |
CB (remotely), JM | First bake of CARME with pumps (cont.) | 5 OCTOBER
08:21 Temperatures stable overnight. See |
6x |
163
|
Fri Nov 26 10:01:45 2021 |
CB (remotely) ML | Power cut in the CRYRING cave | ML reports power cut in CRYRING cave. Reasons
unknown. No effect on vacuum, but top valve
closed for safety reason. Ramping down temperature. |
|
165
|
Tue Nov 30 10:49:43 2021 |
CB (remotely) GV | Gate valve opened | GSI vacuum division IE514 gauge connected.
Gleb reports gate downstream opened.
Vacuum goes up and recovers as expected. |
|
9
|
Sat Sep 12 08:38:52 2020 |
CB (remotely) | Baking over the weekend | Saturday 12 Sep 08:43
Remotely checked status of baking. See attached.
|
 |
10
|
Sun Sep 13 08:06:25 2020 |
CB (remotely) | Baking over the weekend -2 | Sun 13 Sep 08:06
Baking reached 93 C yesterday afternoon at |
 |
13
|
Wed Sep 16 08:52:03 2020 |
CB (remotely) | Baking status 16-17 September | 16 September
08:50
|
    |
24
|
Wed Sep 30 08:10:36 2020 |
CB (remotely) | First bake of CARME with pumps | (NOTE: Raspberry Pi internal clock appears
to be on GMT, rather than GMT+1 due to daylight
saving.)
|
19x |
29
|
Thu Oct 22 22:15:00 2020 |
CB (remotely) | Cooling down after first NEG activation | Thu 22 October
22:15 Temperatures stables, slowly decreasing.
|
7x |
71
|
Sun Sep 19 09:11:34 2021 |
CB (remotely) | Baking RasPi status | Accessed Pi remotely
( 1. Without the Internet, the Pi has no |
|
74
|
Wed Sep 22 08:30:08 2021 |
CB (remotely) | CARME pressure during first XHV test | CARME pressure moved to
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?e=hEoZt7
|
|
77
|
Thu Sep 23 14:19:27 2021 |
CB (remotely) | Checking baking remotely - instructions | 1. Connect to pi on CRYRING local network
ssh pi@192.168.207.127
|
|
81
|
Fri Sep 24 15:36:34 2021 |
CB (remotely) | CARME baking status | Current temperature ~64 C
See plots attached
|
 |