AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 33 of 36  ELOG logo
ID Date Authordown Subject Text Attachments
  657   Wed Jun 19 12:08:34 2024 CB + variousRun 101-105Run 101: no target. See ELOG entry by TD.

Run 102: ??

Run 103: ??
  
  655   Wed Jun 19 12:04:02 2024 CB + OF, SSRun 96/97Run 96 - as run 89, while we wait for beam
energy change at higher energies

Run stopped around 08:56
  
  162   Wed Nov 24 12:08:08 2021 CB + ML OGIon pumps onFound SIP power unit for D2000 #4 not functioning
correctly. Max current regardless of ion
element connected to.
 vacplot24.pngvacplot.pngCARMEtemps.png 
  139   Mon Nov 1 14:48:16 2021 CB + ML DRCARME openedConfirmed leak as per previous Elog.

Tightened to 100 Nm - no effects.

Tightened to 130 Nm - bottom leak
  
  161   Tue Nov 23 08:49:33 2021 CB + MLNEG activation completedFound temperatures and pressure stabilised
overnight. See attached.

12:00 Began activation of 3x UHV1400
 vacplot24.pngCARMEtemps.pngvacplot24-1.pngCARMEtemps-1.png 
  140   Tue Nov 2 12:45:36 2021 CB + DR NKIssues with CARME feetAttempted to close CARME as carefully as
possible.

Swapped out one foot for another
 20211102_134446.jpg 
  94   Wed Sep 29 09:27:38 2021 CB (remotely), RSS JM MLPower cutSudden and unexpected power cut at 10:02 German
time, affecting all the target hall.
  
  12   Tue Sep 15 08:39:26 2020 CB (remotely), JMBaking and Chamber status Tuesday 15 September

08:40
 20200915_0842_ctrl.png20200915_0842_temp.png20200915_152708.jpgimage007.jpg20200915_1920_temps.png 
  25   Mon Oct 5 08:21:40 2020 CB (remotely), JMFirst bake of CARME with pumps (cont.)5 OCTOBER

08:21 Temperatures stable overnight. See
 6x 
  163   Fri Nov 26 10:01:45 2021 CB (remotely) MLPower cut in the CRYRING caveML reports power cut in CRYRING cave. Reasons
unknown. No effect on vacuum, but top valve
closed for safety reason. Ramping down temperature.
  
  165   Tue Nov 30 10:49:43 2021 CB (remotely) GVGate valve openedGSI vacuum division IE514 gauge connected.

Gleb reports gate downstream opened.
Vacuum goes up and recovers as expected.
 vacplot24.png 
  9   Sat Sep 12 08:38:52 2020 CB (remotely)Baking over the weekendSaturday 12 Sep 08:43

Remotely checked status of baking. See attached.
 20200912_0839_ctrl.png20200912_0839_plot.png 
  10   Sun Sep 13 08:06:25 2020 CB (remotely)Baking over the weekend -2Sun 13 Sep 08:06

Baking reached 93 C yesterday afternoon at
 20201309_0806_ctrl.png20201309_0806_plot.png 
  13   Wed Sep 16 08:52:03 2020 CB (remotely)Baking status 16-17 September16 September

08:50
 20200916_0850_temps.png20200916_0850_ctrl.png20200916_1500_temps.png20200916_2022_temps.png20200917_0820_temps.png 
  24   Wed Sep 30 08:10:36 2020 CB (remotely)First bake of CARME with pumps(NOTE: Raspberry Pi internal clock appears
to be on GMT, rather than GMT+1 due to daylight
saving.)
 19x 
  29   Thu Oct 22 22:15:00 2020 CB (remotely)Cooling down after first NEG activationThu 22 October

22:15 Temperatures stables, slowly decreasing.
 7x 
  71   Sun Sep 19 09:11:34 2021 CB (remotely)Baking RasPi statusAccessed Pi remotely 

( 1. Without the Internet, the Pi has no
  
  74   Wed Sep 22 08:30:08 2021 CB (remotely)CARME pressure during first XHV testCARME pressure moved to

https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?e=hEoZt7
  
  77   Thu Sep 23 14:19:27 2021 CB (remotely)Checking baking remotely - instructions1. Connect to pi on CRYRING local network

ssh pi@192.168.207.127
 Temp.png 
  81   Fri Sep 24 15:36:34 2021 CB (remotely)CARME baking statusCurrent temperature ~64 C

See plots attached
 Temp.pngTemps.png 
ELOG V3.1.4-unknown