AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME, Page 33 of 38
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
749 Entries
Goto page
Previous
1
,
2
,
3
...
32
, 33,
34
...
36
,
37
,
38
Next
ID
Date
Author
Subject
Text
142
Wed Nov 3 16:39:01 2021
CB RSS + NP DR NK ML
Interaction chamber lifted in place
Prepared to move interaction chamber in
place. Ok CARME side, flange has M10 bolts.
On interaction chamber side i.e. bellows
48
Tue Aug 31 18:34:41 2021
CB RSS + DR OG
CARME on Al stand
Lifted CARME off the floor and mounted feet
on sides. It was found impossible to put
four bolts for each foot
52
Thu Sep 2 10:41:16 2021
CB RSS + DR OG
CARME connected to the CRYRING
Connected CARME to the CRYRING via tube
plus bellows. See attach.
143
Fri Nov 5 12:27:11 2021
CB RSS + DR NP ML US
First pump down of YR09
Tightened all flanges.
Added Pirani gauge and third IE514
to interaction chamber.
141
Wed Nov 3 11:18:11 2021
CB RSS + DR NK ML
Leak closed
Found CARME at 1.0E-6 mbar. Beginning leak
test.
51
Wed Sep 1 17:14:16 2021
CB RSS + DR ML
CARME mounted on the CRYRING
Lifted CARME with Al support on the
CRYRING. No issues during transportation.
46
Tue Aug 31 07:09:54 2021
CB RSS (rem) JM
Preparation for mounting
(30 August 2021)
The current state of YR09 is as per attach
6x
47
Tue Aug 31 11:55:11 2021
CB RSS
Last preparations for CARME lift
Found strut bolts in the bag with
spherical washers. Mounted the struts and
50
Wed Sep 1 12:05:28 2021
CB RSS
Preparation for CARME on CRYRING YR09
Mounted additional cross member for motor
support. See attach 1
54
Fri Sep 3 08:12:39 2021
CB RSS
Pressure after overnight pump down
03.09.2021 09:00 5.27E-7 mbar
03.09.2021 13:00 4.08E-7 mbar
55
Fri Sep 3 08:14:51 2021
CB RSS
Issues foreseeable splitting CARME
In order to install the detector supports
and eventually install the detectors
7x
57
Fri Sep 3 15:55:00 2021
CB RSS
Issues with cable clamps
Attempted to mount cable clamps for strain
relief on inner part of Allectra
58
Sat Sep 4 15:54:50 2021
CB RSS
Motor mounting preparation
Prepared the motors to be mounted and
found all components required. No issues.
68
Sat Sep 11 16:01:44 2021
CB RSS
Preparations for shutdown
Found CARME pressure at 2E-7 mbar
Raspberry pi took pictures until 4 am and
108
Tue Oct 5 17:30:01 2021
CB RSS
NEG activation tests
Found D2000 #1 activated and at 250C (25W)
to prevent getting dirty when other NEGs
110
Wed Oct 6 09:47:30 2021
CB RSS
Neg activation tests -2
Attempted activating 2xUHV1400 connected to
top C4, channel #3 with P 300 W (450 C?),
t rise 30 min, t hold 90
111
Wed Oct 6 15:36:14 2021
CB RSS
Neg activation tests -3
Attempted to activate 2xUHV1400 connected
to bottom C4, channel #2 using P 200 W, t
rise 30 min, t hold 90 min.
112
Thu Oct 7 08:40:09 2021
CB RSS
CARME in XHV
CARME reached 9E-12 this morning
Ion pumps on
113
Fri Oct 8 17:56:35 2021
CB RSS
Motors test
Attempted first motor test in XHV. Wired
and connected limit switches and string potentiometer.
Set up raspberry pi to control
114
Sat Oct 9 09:44:36 2021
CB RSS
Heaters removed + motors tests
Removed thermocouples, heaters, RE72 modules
and leftover baking tent. Support octagon
removed except topmost part which requires
Goto page
Previous
1
,
2
,
3
...
32
, 33,
34
...
36
,
37
,
38
Next
ELOG V3.1.4-unknown