  14   Wed Sep 16 17:46:36 2020 JMPumping of ChamberA pump cart and leak cart have been connected
to the chamber via the top turbo at the back
of the chamber. An air line has also been
 Photos.zip 
  13   Wed Sep 16 08:52:03 2020 CB (remotely)Baking status 16-17 September16 September

08:50
 20200916_0850_temps.png20200916_0850_ctrl.png20200916_1500_temps.png20200916_2022_temps.png20200917_0820_temps.png 
  12   Tue Sep 15 08:39:26 2020 CB (remotely), JMBaking and Chamber status Tuesday 15 September

08:40
 20200915_0842_ctrl.png20200915_0842_temp.png20200915_152708.jpgimage007.jpg20200915_1920_temps.png 
  11   Mon Sep 14 12:07:40 2020 JM, CB (remotely)Baking statusMon 14 Sep 09:50

Jordan moved the TC08 picolog 2 away from
 20200914_1207_temps.png20200914_1207_ctrl.png20200914_1727_temps.png20200914_2000_temps.png 
  10   Sun Sep 13 08:06:25 2020 CB (remotely)Baking over the weekend -2Sun 13 Sep 08:06

Baking reached 93 C yesterday afternoon at
 20201309_0806_ctrl.png20201309_0806_plot.png 
  9   Sat Sep 12 08:38:52 2020 CB (remotely)Baking over the weekendSaturday 12 Sep 08:43

Remotely checked status of baking. See attached.
 20200912_0839_ctrl.png20200912_0839_plot.png 
  8   Thu Sep 10 11:34:30 2020 TD, JMThursday 10 September All neg feed-throughs have now been fully
installed, with ground tags 
and power wires crimped and attached to the
 20200910_112152.jpg20200910_112211.jpgPhotos_(1).zip 
  7   Wed Sep 9 21:01:48 2020 JMNeg Feedthroughs4/6 of the neg feedthroughs installed.
Continuity between the power pins, ground
pin and the chamber has been checked, we
 Photos.zip 
  6   Fri Sep 4 15:48:25 2020 JMBakeout test completedBakeout test completed. Maximum temperature
reached within baking volume was 120
degrees, with baking stopped by the program
 191214004923_temperatures.txtBakeout1.png 
  5   Wed Sep 2 17:01:49 2020 JMBakeout started and valve installationInitial bakeout started which will run
until friday, temperature had reached 44
degrees when I left the lab. 
 Photos.zip 
  4   Wed Aug 19 16:44:39 2020 JMNeg InstallsInternal neg installs completed and electrically
checked. 
 Photos_(1).zip 
  3   Tue Aug 18 17:35:20 2020 TDSAES UHV1400 pin assignmentUsing a digital multimeter confirmed continuity
for SAES-supplied 
power cable (Amphenol (circular) 6-pin plug
 NEG_POWER_user_manual.pdf20200813_121944_(1).jpg20200813_134548.jpgRFKIT9904220_(2).pdfRFKIT9905220_(2).pdf 
  2   Tue Aug 18 11:26:26 2020 JMWeek ending Friday 14/08/20Week ending friday 14/08/20

CARME chamber securely mounted
upon aluminium frame and support skis. Neg-ion
 Photo.zip 
  1   Mon Aug 17 08:16:16 2020 TDCARME Elog
Test
  