AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 34 of 34  ELOG logo
ID Datedown Author Subject Text Attachments
  12   Tue Sep 15 08:39:26 2020 CB (remotely), JMBaking and Chamber status Tuesday 15 September

08:40
 20200915_0842_ctrl.png20200915_0842_temp.png20200915_152708.jpgimage007.jpg20200915_1920_temps.png 
  11   Mon Sep 14 12:07:40 2020 JM, CB (remotely)Baking statusMon 14 Sep 09:50

Jordan moved the TC08 picolog 2 away from
 20200914_1207_temps.png20200914_1207_ctrl.png20200914_1727_temps.png20200914_2000_temps.png 
  10   Sun Sep 13 08:06:25 2020 CB (remotely)Baking over the weekend -2Sun 13 Sep 08:06

Baking reached 93 C yesterday afternoon at
 20201309_0806_ctrl.png20201309_0806_plot.png 
  9   Sat Sep 12 08:38:52 2020 CB (remotely)Baking over the weekendSaturday 12 Sep 08:43

Remotely checked status of baking. See attached.
 20200912_0839_ctrl.png20200912_0839_plot.png 
  8   Thu Sep 10 11:34:30 2020 TD, JMThursday 10 September All neg feed-throughs have now been fully
installed, with ground tags 
and power wires crimped and attached to the
 20200910_112152.jpg20200910_112211.jpgPhotos_(1).zip 
  7   Wed Sep 9 21:01:48 2020 JMNeg Feedthroughs4/6 of the neg feedthroughs installed.
Continuity between the power pins, ground
pin and the chamber has been checked, we
 Photos.zip 
  6   Fri Sep 4 15:48:25 2020 JMBakeout test completedBakeout test completed. Maximum temperature
reached within baking volume was 120
degrees, with baking stopped by the program
 191214004923_temperatures.txtBakeout1.png 
  5   Wed Sep 2 17:01:49 2020 JMBakeout started and valve installationInitial bakeout started which will run
until friday, temperature had reached 44
degrees when I left the lab. 
 Photos.zip 
  4   Wed Aug 19 16:44:39 2020 JMNeg InstallsInternal neg installs completed and electrically
checked. 
 Photos_(1).zip 
  3   Tue Aug 18 17:35:20 2020 TDSAES UHV1400 pin assignmentUsing a digital multimeter confirmed continuity
for SAES-supplied 
power cable (Amphenol (circular) 6-pin plug
 NEG_POWER_user_manual.pdf20200813_121944_(1).jpg20200813_134548.jpgRFKIT9904220_(2).pdfRFKIT9905220_(2).pdf 
  2   Tue Aug 18 11:26:26 2020 JMWeek ending Friday 14/08/20Week ending friday 14/08/20

CARME chamber securely mounted
upon aluminium frame and support skis. Neg-ion
 Photo.zip 
  1   Mon Aug 17 08:16:16 2020 TDCARME Elog
Test
  
ELOG V3.1.4-unknown