Wed Jun 11 09:16:55 2025, CB, ASIC Control Settings 17x
|
11 June 10:18
2025Apr08-13.45.30 settings
DSSD4 not working as of the screenshots (MEC + High Threshold) |
Thu Feb 24 08:30:36 2022, JG, MS, AIDA5 calibration test failed - solved 
|
UPDATE: THE PROBLEM IS SOLVED FOR NOW:
Doing the calib for the 5th time eventually worked.
------------ |
Wed Jan 17 19:21:20 2024, TD, AIDA spares
|
Spare AIDA hardware
|
Thu Jan 27 21:33:40 2022, JM, OH, AIDA config files, remote access, motor test
|
Power, Ethernet and HDMI cables connected to FEEs. To prevent cables coming out of connectors, power and HDMI cables are zip tied to FEE cooling pipe
(see attached image).
Correct FEE MAC addresses have been updated in /etc/dhcp/dhcpd.conf |
Wed Aug 25 07:02:41 2021, RSS TD, 25-31 August 19x
|
Pirani IE514
mbar mbar
25/8/21 08:00 0.0030 1.86e-8
----------------------------------------------------
26/8/21 09:00 0.0030 1.77e-8
---------------------------------------------------- |
Wed Jun 19 12:01:29 2024, TD, 23:00-07:00 Wednesday 19 June 23x
|
23.18 DSSSD bias & leakage current OK - attachment 1
FEE64 temps OK - attachment 2
ADC data item stats attachment 3
|
Fri May 10 21:23:35 2024, TD, CB, JM, 20Ne7+ test beam 18x
|
22.00
Carsten Brandau stopping e-target experiment Unattended beam overnight. No operators watching.
10^5 (nominal) 20Ne7+ at 380keV/u beam available |
Wed Aug 18 07:07:26 2021, RSS TD, 18-24 August 25x
|
Pirani IE514
mbar mbar
18/8/21 08:00 0.0034 3.90e-8
18/8/21 17:00 0.0032 3.72e-8
-------------------------------------------------------------
19/8/21 08:00 0.0032 3.38e-8 |
Tue Jun 10 16:46:39 2025, JM, CB, EW, AY, PC, 150 keV - Run64 42x
|
Run 64 started.
150 keV/u beam on target, Target overlap confirmed with lifetime measurement using bunched beam.
We do not see Rutherford on the detector - perhaps this is a calibration issue - perhaps too much noise at threshold. |
Mon Jun 10 12:49:56 2024, RSS, DB, CB, JM, R58 Space Charge Test   
|
13:53
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats - attachment
3
per FEE64 Rate spectra - attachment 4
Beam intensity - ~ 5.0E7 pps
Target density - off
|
Sun Sep 26 17:20:13 2021, RSS JM CB (remotely), CARME baking status -5 
|
Current temperature ~105 C
See plot and screen attached.
Current pressure 6.08E-7
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Tue Feb 22 06:30:09 2022, RSS, OF, Beam ON, Target ON Run 54 10x
|
07:30
Beam ON ~8.0E6 pps
Target ON and open to the ring |
Tue Feb 22 07:27:28 2022, RSS, OF, ML, Beam ON, Target ON Run 54 10x
|
08:30
Beam ON ~1.0E7 pps
Target ON and open to the ring |
Tue Feb 22 08:31:25 2022, RSS, OF, ML, Beam OFF, Target ON Run 54 10x
|
09:30
Beam optimisation. No beam since 09:25.
Target ON and open to the ring |
Tue Feb 22 10:30:00 2022, RSS, OF, ML, Beam OFF, Target ON Run 54 10x
|
11:30
Beam optimisation. No beam since 09:25.
Target ON and open to the ring |
Tue Feb 22 12:01:46 2022, RSS, OF, ML, CB, Beam OFF, Target ON Run 54 9x
|
01:00
Beam optimisation since 09:25.
Target ON and open to the ring |