AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 38 of 38  ELOG logo
ID Date Author Subjectdown Text Attachments
  737   Wed Jun 11 09:16:55 2025 CBASIC Control Settings11 June 10:18

2025Apr08-13.45.30 settings

DSSD4 not working as of the screenshots
 17x 
  268   Thu Feb 24 08:30:36 2022 JG, MSAIDA5 calibration test failed - solvedUPDATE: THE PROBLEM IS SOLVED FOR NOW:

Doing the calib for the 5th time
eventually worked.
 Screenshot_from_2022-02-24_09-09-36.pngScreenshot_from_2022-02-24_09-29-24.png 
  474   Wed Jan 17 19:21:20 2024 TDAIDA spares
Spare AIDA hardware 
  
  180   Thu Jan 27 21:33:40 2022 JM, OHAIDA config files, remote access, motor testPower, Ethernet and HDMI cables connected
to FEEs. To prevent cables coming out of
connectors, power and HDMI cables are zip
 20220127_101513.jpg 
  45   Wed Aug 25 07:02:41 2021 RSS TD25-31 August
Pirani  IE514
mbar    mbar


25/8/21
08:00 0.0030 1.86e-8

----------------------------------------------------

26/8/21   09:00 
 19x 
  654   Wed Jun 19 12:01:29 2024 TD23:00-07:00 Wednesday 19 June23.18 DSSSD bias & leakage current OK - attachment
1
      FEE64 temps OK - attachment 2
 23x 
  552   Fri May 10 21:23:35 2024 TD, CB, JM20Ne7+ test beam22.00

Carsten Brandau stopping e-target
experiment Unattended beam overnight. No
 18x 
  43   Wed Aug 18 07:07:26 2021 RSS TD18-24 August
Pirani  IE514
mbar    mbar


18/8/21
08:00 0.0034 3.90e-8
18/8/21 17:00 0.0032
3.72e-8


 
 25x 
  734   Tue Jun 10 16:46:39 2025 JM, CB, EW, AY, PC150 keV - Run64Run 64 started.

150 keV/u beam on target, Target
overlap confirmed with lifetime measurement
 42x 
  611   Mon Jun 10 12:49:56 2024 RSS, DB, CB, JM R58 Space Charge Test
13:53

      DSSSD bias & leakage
current OK - attachment 1

      FEE64
temperatures OK - attachment 2

      ADC
 Screenshot_from_2024-06-10_13-52-45.pngScreenshot_from_2024-06-10_13-53-04.pngScreenshot_from_2024-06-10_13-53-17.pngScreenshot_from_2024-06-10_13-53-28.png 
  85   Sun Sep 26 17:20:13 2021 RSS JM CB (remotely) CARME baking status -5
Current temperature ~105 C
See plot
and screen attached.


Current
pressure 6.08E-7 
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
 Screenshot_from_2021-09-26_18-19-26.pngScreenshot_from_2021-09-26_18-18-23.png 
  229   Tue Feb 22 06:30:09 2022 RSS, OF Beam ON, Target ON Run 54 07:30

Beam ON ~8.0E6 pps

Target ON and open to the ring
 10x 
  230   Tue Feb 22 07:27:28 2022 RSS, OF, ML Beam ON, Target ON Run 54 08:30

Beam ON ~1.0E7 pps

Target ON and open to the ring
 10x 
  231   Tue Feb 22 08:31:25 2022 RSS, OF, ML Beam OFF, Target ON Run 54 09:30

Beam optimisation. No beam since
09:25.
 10x 
  234   Tue Feb 22 10:30:00 2022 RSS, OF, ML Beam OFF, Target ON Run 54 11:30

Beam optimisation. No beam since
09:25.
 10x 
  235   Tue Feb 22 12:01:46 2022 RSS, OF, ML, CB Beam OFF, Target ON Run 54 01:00

Beam optimisation since 09:25.

Target ON and open to the ring
 9x 
ELOG V3.1.4-unknown