ID Date Author Subjectdown Text Attachments
  80   Fri Sep 24 09:44:58 2021 JM MLVacuum gauge readoutThe analog readout of the Combivac controller
for the IE514 ion gauge has been set up,
readings are plotted to http://web-docs.gsi.de/~lestinsk/vacplot.php.
  
  441   Wed Sep 13 15:00:39 2023 MLVacuum and Heater temperature plots from GrafanaAttached are the plotted curves from vacuum
and heater temperature (actual and set values
from ISOHEAT controllers) during the bakeout
 Screenshot_2023-09-13_15-56-34.pngScreenshot_2023-09-13_15-58-06.pngScreenshot_2023-09-13_15-59-37.pngScreenshot_2023-09-13_15-59-01.pngScreenshot_2023-09-13_15-58-31.png 
  396   Wed May 10 19:06:18 2023 RSS, TDV-I testTo test the detectors, adaptors were installed
on the feed through flanges. A negative bias
voltage was applied in steps of 10 V from
 detector_1.pngdetector_2.pngdetector_3.pngdetector_4.png 
  397   Thu May 11 21:22:54 2023 RSS, TDV-I testToday, the foil was opened, the pins on
the bottom right detector were checked and
looked fine, the right-hand arm was moved
 7x 
  398   Fri May 12 16:24:20 2023 RSS, TDV-I testSince yesterday evening, the bottom right
detector was at -150 V. In the morning, the
current was quite stable ~ 6.77 uA. The bias
 8x 
  433   Sat Aug 12 11:57:51 2023 JMUpdated thermocouple positions and heater channel layoutsHeater channel layouts for the interaction
chamber and carme in attached documents. 

Updated thermocouple positions;
 6x 
  289   Sat Feb 26 23:20:13 2022 David, Pierre-MichellUpdate statusIn this last hour we have been playing
with the cryostat temperature as dictated
by Nikos, in order to have the target working
 7x 
  60   Tue Sep 7 11:37:05 2021 CB RSS + OGUpdate on strain relief screw issuesTested every strain relief. M3 screws get
stuck at different points in each hole. Only
one good hole out of 16
  
  440   Sat Sep 2 10:04:55 2023 CBTurbo GV closed Found CARME in XHV at 1.1E-11 mbar. Chamber
temperature around 30C cooling slowly.

Closed GV to top turbo. Pressure
  
  370   Tue Aug 9 13:44:16 2022 TD, JMTuesday 9 August
14.00 CARME vacuum c. 1.8e-10 mbar - see
attachment 1
 Capture_1.PNG20220809_163450.jpg20220809_135840.jpg20220809_135833.jpg20220809_135801.jpg 
  668   Tue Apr 8 10:46:13 2025 TDTuesday 8 April
11.30 CRYRING vacuum and temperature - attachments
1-2
 27x 
  481   Tue Jan 30 09:14:50 2024 JM, TDTuesday 30 January
09.00 CARME IE514 5.1e-11mbar
 32x 
  452   Tue Oct 3 08:48:36 2023 TDTuesday 3 October09.40 CARME IE514 1.79e-8 mbar, ambient temperature
20.7 deg C
 1000007432.jpg1000007431.jpg1000007434.jpg 
  381   Tue Nov 29 14:37:56 2022 AR TDTuesday 29 November16:20

DSSD bias and leakage current values:

-99.99 V
 22x 
  444   Tue Sep 26 08:08:42 2023 TDTuesday 26 September09.07 IE514 pressure 6.4e-11 mbar, ambient
temperature +20.3 deg C
 7x 
  543   Tue Apr 23 17:44:41 2024 TDTuesday 23 April
18.43 ASIC settings 2024Feb08-15.59.09
 12x 
  18   Wed Sep 23 13:34:04 2020 JMTuesday 22 SeptemberTurbo-pump Issue approximately 13:00 22/9/20.

While moving the baking octagon
into position, the power connector became
  
  679   Tue Apr 22 06:44:02 2025 TDTuesday 22 April
07.40 DSSSD bias & leakage current - attachments
1-3
 Screenshot_from_2025-04-22_07-40-45.pngScreenshot_from_2025-04-22_07-41-10.pngScreenshot_from_2025-04-22_07-47-25.png1.png2.png 
  469   Tue Jan 16 08:57:44 2024 JG, DR, TDTuesday 16 January10.00 Outflow manifold returned from workshop
with leaking attachment point welding re-worked.
 8x 
  39   Tue Aug 10 12:22:56 2021 TD RSSTuesday 10 August
Attachments 1-3 - 2 of 4 SAES D2000 installed
at same ports used for STFC DL XHV tests
 20210810_115555.jpg20210810_115607.jpg20210810_115617.jpg 