ID |
Date |
Author |
Subject |
Text |
 |
|
372
|
Wed Aug 10 10:30:04 2022 |
TD, JM | Wednesday 10 August |
09.45 Found CARME electrical power off
|
   |
|
539
|
Wed Feb 21 07:38:32 2024 |
TD | Wedneday 21 February |
10.54 23.2.24 Bias OFF |
24x |
|
175
|
Wed Jan 26 19:16:18 2022 |
JM, OH | Water cooling, FEE MAC address | Water cooling has been connected to the
FEE's. Flow meter installed to outlet
manifold by way of two right angled pieces. |
  |
|
703
|
Fri May 30 07:27:41 2025 |
CB LB JM NP EM | Waiting for deuterium | 08:27
No run going.
Temperatures OK - attach |
8x |
|
116
|
Mon Oct 11 11:24:16 2021 |
RSS TD ML | Valve support and cable labeling | Split funnels were given to Oemer for cleaning.
Have received them back after lunch.
Valve support is installed again |
  |
|
240
|
Tue Feb 22 18:23:02 2022 |
David. Yury | Vacuum problem | At 19:10 the vacuum has increased suddenly
everywhere in the ring, roughly a factor
1.5. |
|
|
80
|
Fri Sep 24 09:44:58 2021 |
JM ML | Vacuum gauge readout | The analog readout of the Combivac controller
for the IE514 ion gauge has been set up,
readings are plotted to http://web-docs.gsi.de/~lestinsk/vacplot.php. |
|
|
441
|
Wed Sep 13 15:00:39 2023 |
ML | Vacuum and Heater temperature plots from Grafana | Attached are the plotted curves from vacuum
and heater temperature (actual and set values
from ISOHEAT controllers) during the bakeout |
    |
|
396
|
Wed May 10 19:06:18 2023 |
RSS, TD | V-I test | To test the detectors, adaptors were installed
on the feed through flanges. A negative bias
voltage was applied in steps of 10 V from |
   |
|
397
|
Thu May 11 21:22:54 2023 |
RSS, TD | V-I test | Today, the foil was opened, the pins on
the bottom right detector were checked and
looked fine, the right-hand arm was moved |
7x |
|
398
|
Fri May 12 16:24:20 2023 |
RSS, TD | V-I test | Since yesterday evening, the bottom right
detector was at -150 V. In the morning, the
current was quite stable ~ 6.77 uA. The bias |
8x |
|
433
|
Sat Aug 12 11:57:51 2023 |
JM | Updated thermocouple positions and heater channel layouts | Heater channel layouts for the interaction
chamber and carme in attached documents.
Updated thermocouple positions; |
6x |
|
289
|
Sat Feb 26 23:20:13 2022 |
David, Pierre-Michell | Update status | In this last hour we have been playing
with the cryostat temperature as dictated
by Nikos, in order to have the target working |
7x |
|
60
|
Tue Sep 7 11:37:05 2021 |
CB RSS + OG | Update on strain relief screw issues | Tested every strain relief. M3 screws get
stuck at different points in each hole. Only
one good hole out of 16
|
|
|
440
|
Sat Sep 2 10:04:55 2023 |
CB | Turbo GV closed | Found CARME in XHV at 1.1E-11 mbar. Chamber
temperature around 30C cooling slowly.
Closed GV to top turbo. Pressure |
|
|
370
|
Tue Aug 9 13:44:16 2022 |
TD, JM | Tuesday 9 August |
14.00 CARME vacuum c. 1.8e-10 mbar - see
attachment 1
|
    |
|
668
|
Tue Apr 8 10:46:13 2025 |
TD | Tuesday 8 April |
11.30 CRYRING vacuum and temperature - attachments
1-2
|
27x |
|
481
|
Tue Jan 30 09:14:50 2024 |
JM, TD | Tuesday 30 January |
09.00 CARME IE514 5.1e-11mbar
|
32x |
|
452
|
Tue Oct 3 08:48:36 2023 |
TD | Tuesday 3 October | 09.40 CARME IE514 1.79e-8 mbar, ambient temperature
20.7 deg C
|
  |
|
381
|
Tue Nov 29 14:37:56 2022 |
AR TD | Tuesday 29 November | 16:20
DSSD bias and leakage current values:
-99.99 V |
22x |