Entry  Tue Apr 8 10:46:13 2025, TD, Tuesday 8 April 27x

11.30 CRYRING vacuum and temperature - attachments 1-2
Entry  Mon Apr 7 08:59:41 2025, TD, Monday 7 April 8x

10.00 FEE64 power ON
      CARME IE514 OFF
Entry  Sun Apr 6 14:21:53 2025, TD, [How To] Startup CARME 
- water flow/interlock checks

     check water flow to/from inflow/outflow manifolds

     check all coolant lines to all FEE64s are connected
Entry  Sun Apr 6 11:40:48 2025, TD, Options DB reconstructed Screenshot_from_2025-04-06_12-59-39.png
Options directory corrupted unable to change Options settings per https://elog.ph.ed.ac.uk/CARME/664

Move old Options directory to Options.BAK-060425
Entry  Sun Apr 6 10:17:49 2025, TD, Sunday 6 April 15x

11.15 CARME IE514 ion gauge remains OFF
      ML says there are 2x ion gauges with line of sight to the DSSSDs - CARME IE514 (now off) and another controlled by the vacuum group - he will request
Entry  Sat Apr 5 16:15:04 2025, TD, FEE64 power interlock installed 11x

Water flow and dew point sensors have been installed on the outlet and inlet cooling water manifolds respectively.
Entry  Sat Apr 5 16:13:32 2025, TD, Saturday 5 April 7x

12.00 CARME IE514 ion gauge 4.2e-11 mbar
      CARME IE514 OFF
Entry  Fri Apr 4 10:17:16 2025, TD, Friday 4 April 

10.43 Reboot carme-gsi - unable to open a working terminal
Entry  Mon Mar 10 15:47:27 2025, TD, Analysis data files G22-201 R79_10 & R79_24 R79_10.txtR79_24.txt

Analysis of data files G22-201 R79_10 and R79_24 - attachments 1-2
Entry  Tue Jul 2 17:43:32 2024, TD, Offline analysis G22-201/R89 9x
Offline analysis data file G22-201/R89_0 to R89_13 (c. 6h40m data)

DSSSD#1 & 3 36.54mm -> ~ 2.3-8.6 deg 
Entry  Wed Jun 19 12:11:22 2024, CB, RSS, CARME status 
DSSD off

FEEs off

Motors out, pin inserted, compressed air closed, power removed from motors box.
Entry  Wed Jun 19 12:08:34 2024, CB + various, Run 101-105 
Run 101: no target. See ELOG entry by TD.

Run 102: ??

Run 103: ??
Entry  Wed Jun 19 12:06:50 2024, CB, OF, SS, Run 98/99/100 - higher energy 
10:21 June 17

New energy: 1.125 MeV/u

Target in. Run 98 started.
Entry  Wed Jun 19 12:04:02 2024, CB + OF, SS, Run 96/97 
Run 96 - as run 89, while we wait for beam energy change at higher energies

Run stopped around 08:56 June 17

 
Entry  Wed Jun 19 12:01:29 2024, TD, 23:00-07:00 Wednesday 19 June 23x
23.18 DSSSD bias & leakage current OK - attachment 1
      FEE64 temps OK - attachment 2
      ADC data item stats attachment 3
Entry  Wed Jun 19 12:00:56 2024, CB, Run 93/94/95 - background 6x
04:00 17 June

Moved the detectors back to the usual configuration (as per run 89).

Moved target away - background run.
Entry  Wed Jun 19 11:54:26 2024, CB, Run 91/92 - moving detectors Screenshot_from_2024-06-18_03-07-50.pngScreenshot_from_2024-06-18_03-53-51.pngScreenshot_from_2024-06-18_04-20-15.pngScreenshot_from_2024-06-18_04-20-18.pngScreenshot_from_2024-06-18_04-20-21.png
~ 2:00 17 June

 

Run 91
Entry  Mon Jun 17 23:10:08 2024, CB, Run 90 Screenshot_from_2024-06-18_01-21-47.pngScreenshot_from_2024-06-18_01-21-55.png
00:10

As run 89, detectors moved fully out.

 
Entry  Mon Jun 17 16:26:00 2024, JM, RSS, CB, Run 89 19x
17:20

(Run 87 Junk and Run 88 does not exist)

Beam charge state set to 5+. Energy is ~1.06 MeV/u
Entry  Mon Jun 17 06:26:45 2024, JM, OF, AK, CB, Change to 5+ beam 7x
07:00

We are changing to 5+ beam so that we can access higher energies and possibly observe a higher lying, wider resonance.

Beam energy change to 1.06 MeV/u.