AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 7 of 34  ELOG logo
Entry  Sun Feb 11 07:03:34 2024, TD, Sunday 11 February 20x
Entry  Sun Oct 1 10:24:50 2023, TD, Sunday 1 October 12x
Entry  Fri May 26 08:53:54 2023, JM, CB, Strain reliefs (flange side) installed strain-relief-flange-side.jpgstrain-relief1_(1).mp420230526_140923.jpgV-I-plot.png
Entry  Wed May 24 08:35:12 2023, JM, CB, Strain reliefs (detector side) installed 20230524_092010.jpg20230524_092017.jpg20230524_092101.jpg20230524_093000.jpg20230524_092159.mp4
Entry  Sun Oct 31 07:55:39 2021, CB JM + OH, Strain relief mounted 20211028_190026.jpg20211028_192251.jpg20211028_192210.jpg
Entry  Tue Sep 7 14:10:02 2021, CB RSS + OG, Strain relief SS support re-drilled 
Entry  Tue Feb 13 08:34:44 2024, Hw, JM, AR, CB, NP, AB, RSS, Status of DAQ - beam overlap 10x
Entry  Wed Jun 12 07:16:47 2024, RSS, YL, JM, TD, CB, Status 6x
Entry  Mon May 27 15:25:08 2024, JM, Startup 
Entry  Sat Feb 26 22:22:27 2022, David, Pierre-Michell, Starting to take data 11x
Entry  Sun Oct 15 09:35:03 2023, CB, Starting ramp down Screenshot_2023-10-15_10-35-47.pngScreenshot_2023-10-15_17-56-00.png
Entry  Wed Oct 13 15:28:22 2021, RSS TD + OG, Split funnels 7x
Entry  Wed Jan 10 10:22:41 2024, CB, JM, Some FEEs mounted - issues with Det#2 (bottom left) Screenshot_2024-01-10_11-59-39.pngScreenshot_2024-01-10_12-56-36.png
Entry  Tue Feb 22 12:23:23 2022, CB, Slow comparator thresholds lowered - test run 
Entry  Thu Jun 22 18:58:02 2023, JM, TD, Slide back onto ring 20230622_112534.jpg20230622_112827.jpg20230622_120307.jpg
Entry  Wed Sep 8 17:03:07 2021, CB RSS + OG NB, Six feedthrough flanges mounted 23x
Entry  Tue Feb 20 14:12:32 2024, JM, Shutdown Screenshot_from_2024-02-20_15-11-40.png
Entry  Mon Feb 14 09:56:39 2022, CB, Shifters instructions 2022 10x
Entry  Thu Feb 8 11:22:28 2024, JM, Shifters instruction 2024 
Entry  Thu Feb 1 10:04:11 2024, JM, CB, Shaping time testing 31x
ELOG V3.1.4-unknown