ID |
Date |
Author |
Subject |
Text |
 |
408
|
Sat Jun 24 10:38:42 2023 |
JM, TD | Section 9 closed, begin pumping | 23/06/23
The CARME chamber and interaction
chamber were connected and section 9 has |
 |
222
|
Mon Feb 21 21:04:08 2022 |
SHB, JM, CB, OH (remotely) | Schottky RF view from the beam inside | |
|
662
|
Sat Apr 5 16:13:32 2025 |
TD | Saturday 5 April |
12.00 CARME IE514 ion gauge 4.2e-11 mbar
CARME IE514 OFF
|
7x |
449
|
Sat Sep 30 10:58:14 2023 |
TD | Saturday 30 September | 10.50 CARME IE514 7.14e-10 mbar, ambient temperature
20.8 deg C
|
9x |
548
|
Fri Apr 26 23:41:16 2024 |
TD | Saturday 27 April |
00.34 DAQ continues data file R3_9
|
37x |
287
|
Sat Feb 26 04:36:38 2022 |
RSS TD | Saturday 26 February 07:00-15:00 | 05:36 E4 pressure c. 1.7e-9mbar *not* 3e-10mbar
as reported earlier
See attachments 1 & 2
|
27x |
477
|
Mon Jan 22 16:29:31 2024 |
TD | Saturday 20 January | 11.00 No WLAN/WiFi
came-gsi private LAN appears to be
OK
|
30x |
399
|
Sat May 13 11:34:25 2023 |
TD, RSS | Saturday 13 May |
12.34 DSSSD#3 bias -149.95V leakage current
-6.763uA temperature +21.2 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php |
|
107
|
Tue Oct 5 11:44:11 2021 |
CB, TD | SAES manuals & cable drawings | NEG power
SIP power
UHV1400 operating instructions |
8x |
3
|
Tue Aug 18 17:35:20 2020 |
TD | SAES UHV1400 pin assignment | Using a digital multimeter confirmed continuity
for SAES-supplied
power cable (Amphenol (circular) 6-pin plug |
    |
558
|
Wed May 29 16:46:21 2024 |
NP, AB, PM | Run7 - Measurements only with ion beam. | 18:19 Start or run 7: In beam has been
optimzed up to now by Zoran and Claude. ~7E7
particles at injection. From now on, only |
 |
556
|
Wed May 29 08:10:32 2024 |
JM | Run4 - alpha background | 09:00
R4 alpha background continues,
currently R4_12 |
|
518
|
Thu Feb 15 21:07:00 2024 |
JM, AB, AR, OF | Run33 - cooled beam on target | 22:27
Run 33 started cooled beam on target.
Detectors IN (left arm pot =36.5 |
22x |
516
|
Thu Feb 15 12:40:52 2024 |
JM. CB, AR, AB | Run30 - uncooled beam on target | Run started 13:40
Target density 4.3e11, Beam injection
is ~1e7, Pressure in the ring is ~1e-10 mbar. |
29x |
583
|
Mon Jun 3 21:37:20 2024 |
CN, EM, CB | Run30 | Beam energy = 3 MeV
Horizontal beam position = 7.0
mm, vertical beam position = 0.0 mm. |
  |
491
|
Mon Feb 5 05:45:26 2024 |
CB TD | Run3 - end | 06.40 DAQ continues file G22-88/R3_42
DSSSD bias OK - attachment 1
|
47x |
490
|
Sun Feb 4 08:40:04 2024 |
CB TD | Run3 - contd | 09.30 DAQ continues file G22-88/R3_17
DSSSD bias OK - attachment 1
|
22x |
515
|
Thu Feb 15 10:39:50 2024 |
JM, JG, ML, AG, CB | Run29 - beam optimisation | 11:27
Run 29 started. Beam energy is
1.3435 MeV/u with a cooler voltage of 751.3 |
|
582
|
Mon Jun 3 15:17:41 2024 |
CN, EM, CB | Run29 | 16:15
In the previous run while working
on the target it was discovered that the |
    |
514
|
Wed Feb 14 16:52:46 2024 |
JM, AR, CB, JG | Run28 - beam on target |
Beam energy - 1.361 MeV/u
17:12 |
42x |