Mon Jun 17 05:47:35 2024, JM, Run 86
|
06:50
No sign of the resonance during night shift. New run started but when operators are avaiable we will likely move to higher energies to try and
observe the (p,a) reaction. |
Mon Jun 17 04:01:16 2024, JM, Run 85
|
05:00
Cooler voltage setpoint 247.45 V.
FC20 read value 246.9 V. |
Mon Jun 17 02:05:37 2024, JM, Run 84
|
03:00
Cooler voltage setpoint 247.7 V.
FC20 read value 247.15 V. |
Mon Jun 17 00:05:13 2024, JM, Run 83
|
01:00
Cooler voltage setpoint 247.6 V.
FC20 read value 247.05 V. |
Sun Jun 16 22:49:22 2024, JM, Run 82
|
23:38
Cooler voltage setpoint 247.5 V.
FC20 read value 246.95 V. |
Sun Jun 16 22:40:11 2024, JM, Target overlap test - R81
|
23:10
Beam set to bunched mode to observe beam lifetime.
Electron cooler voltage setpoint kept at 246.8 V. Note this is 0.5 V lower than the previous test where the setpoint was 247.3 V |
Sun Jun 16 19:01:30 2024, ML, EM, Run 80
|
20:00
Ecooler setpoint 246.8
Readout 246.25 |
Sun Jun 16 13:51:11 2024, CB EM ML, Run 79 7x
|
14:51
Ecooler setpoint 246.9
Readout 246.35 |
Sun Jun 16 13:29:05 2024, RSS CB, Run 78
|
| Target clogged? |
Sun Jun 16 06:02:31 2024, RSS, Run 77 20x
|
Run 77 started at 06:48
Cooler voltage setpoint 247.0 V.
|
Sat Jun 15 21:14:56 2024, JM, JS, LC, Run 76
|
22:15
New run 76 - beam on target with definite target overlap [coasting]
Cooler voltage setpoint 247.1 V. |
Sat Jun 15 13:30:18 2024, JM, JS, Run 75  
|
14:30
New run 75 - beam on target with definite target overlap [coasting]
Cooler voltage setpoint 247.2 V. |
Sat Jun 15 06:10:21 2024, EM, PMH, Run 74 6x
|
7:00
Cooler voltage setpoint 247.4 V.
|
Sat Jun 15 00:46:45 2024, TD, CRYRING hall temperature transient
|
CRYRING hall temperature transient - evening of Friday 14 June
Cooling of recirculating water failed on a number of circuits within the GSI experimental hall including S4 and CRYRING
|
Fri Jun 14 22:18:18 2024, RSS, CB, US, Run 73 20x
|
Beam is back.New run started.
Cooler voltage setpoint 247.3 V. |
Fri Jun 14 19:59:14 2024, US, LC, CB, New run with name of 72 is started due to target issue 
|
21:00
Target is lost. Background run is being collected.
New run 72 - beam on target with definite target overlap [coasting] |
Fri Jun 14 14:52:02 2024, JM, Beam-Target Overlap Scan 
|
The orbit of the beam in the ring was re-configured so that the beam position is more central.
With the target density at ~6e11 at/cm2 this allowed a target overlap scan using the beam lifetime to be performed.
Beam put into bunched mode to allow the number of particles to be observed on Grafana. |
Fri Jun 14 14:48:02 2024, CB NP ML, [How To] Change target pressure. EMERGENCY ONLY! 
|
ONLY FOLLOW THESE INSTRUCTIONS if E1 turbo is below 820 Hz, pressure in E1 is above 2.5E-1 mbar and experts (Nikos, Andreas) cannot be reached.
Go to the red cabinet under the stairs. |
Fri Jun 14 14:46:54 2024, LC, JM, CB, TD, US, Run 71 - beam on target   
|
15:45
New run 71 - beam on target with definite target overlap [coasting]
Cooler voltage setpoint 247.3 V. |
Fri Jun 14 13:45:21 2024, JM, JS, CB, TD, EH, Run 70 - beam on target 7x
|
14:45
New run 70 - beam on target with definite target overlap
Cooler voltage setpoint 247.3 V. |