AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 7 of 33  ELOG logo
Entry  Tue Feb 20 14:12:32 2024, JM, Shutdown Screenshot_from_2024-02-20_15-11-40.png
CARME DAQ shutdown. FEEs turned OFF and all MIDAS server windows closed.

Detector bias turned OFF.

Final leakage current plot - attachment 1
Entry  Tue Feb 20 13:20:44 2024, OF, AG, JG, ML, R48 status check Screenshot_from_2024-02-20_14-22-05.pngScreenshot_from_2024-02-20_14-22-49.pngScreenshot_from_2024-02-20_14-29-39.pngScreenshot_from_2024-02-20_14-34-55.png
Doing afternoon check. Checked the leakage currents, all ok. Attachment 1

Temperatures ok, attchment 2

System wide check, all correct.
Entry  Tue Feb 20 09:57:57 2024, OF, AG, ML, Run 48 status check Screenshot_from_2024-02-20_11-06-48.pngScreenshot_from_2024-02-20_11-08-05.pngScreenshot_from_2024-02-20_11-12-26.pngScreenshot_from_2024-02-20_11-13-58.png2024-02-20_11-37-46-304.png
Doing morning check. Checked the leakage currents, all ok. Attachment 1

Temperatures ok, attchment 2

System wide check, all correct.
Entry  Tue Feb 20 09:51:37 2024, JM, Run 48 beam on target 
Run 48 started
Entry  Tue Feb 20 08:41:08 2024, OF, AG, still no beam CRYRING 
We have mosty empty injections into CRYRING. Only sporadically the beam with good intensity is injected.

Michael Lestinsky is currently working on the problem.
Entry  Tue Feb 20 07:50:10 2024, JM, DAQ restart 
DAQ restarted. Run46. All appears OK, aida01 shows high rates across ASIC 4 even with no beam which could not be resolved via ASIC control. May suggest
some damge.

Merger is running and tape server is writing data to disk. Data rate is about 1300 kB/sec from 800 kb/sec due to increase in aida01 rate.
Entry  Mon Feb 19 21:46:32 2024, EH, EM, CB, Run 45 + end of late shift 14x
22:54
We have moved the gas jet target out (y=4000), the density has dropped to zero.
Started a new run (Run45) for background measurement.
Entry  Mon Feb 19 08:45:22 2024, JM, JG, SHB, EM, EH, Run 44 - cooled beam on target 35x
09:43

Run 44 started cooled beam on target

Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm). Stationary. Same as previous runs
Entry  Mon Feb 19 06:01:17 2024, SHB, JM, JG, Run 42 morning shift 6x
07:00

Observed reduction in YR09 presure over last few hours in ML online plot. Beam intensity looks OK but target density was fluctuating quite a
lot. Current value was 1.5e11.
Entry  Mon Feb 19 05:10:48 2024, TD, Run 42 night shift contd. 6x
06.03 DAQ continues file G22-86/R42_32

      DSSSD bias & leakage current - attachments 1-2
Entry  Sun Feb 18 22:03:56 2024, TD, Run 42 night shift 47x

23.03 DAQ continues file G22-86/R42_21
Entry  Sun Feb 18 13:58:33 2024, AR, OF, JM, Run 42 - cooled beam on target 27x
Run 42 - 15:00

Detectors IN (left arm pot =36.54 mm, right arm pot = 70.49 mm). Stationary. Same as run 40

Electron cooler voltage 751.89 V this corresponds to 1.3444 MeV/u. This should be on the right of the peak of the resonance.
Entry  Sun Feb 18 13:10:18 2024, TD, Sunday 18 February - DSSSD 0 aida01 and aida04 *.*.L spectra Screenshot_from_2024-02-18_13-58-29.pngScreenshot_from_2024-02-18_13-59-55.pngScreenshot_from_2024-02-18_14-01-19.pngScreenshot_from_2024-02-18_14-08-36.pngScreenshot_from_2024-02-18_14-09-44.png

DSSSD 0 aida01 1*L spectra, aida04 **L spectra
Entry  Sun Feb 18 07:53:51 2024, HW AG, Run 40 Morning Shift 27x
08:57 Doing morning check. Checked the leakage currents, all ok. Attachment 1

Tempritures of, attchment 2

System wide check, all correct.
Entry  Sun Feb 18 00:16:55 2024, JM CB, Run 40 - night shift 15x
01:17

Run 40 continues.

Beam intensity looks OK. Oscillates between just below 2.5e7 and just below 3e7. (attachment 1)
Entry  Sat Feb 17 14:29:03 2024, JM, CB, AR, AB, Run 40 - cooled beam on target 31x
15:27

Run 40 started cooled beam on target

Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm). Stationary. Same as run 35
Entry  Sat Feb 17 13:21:44 2024, JM, CB, Beam on target - motors tests Screenshot_from_2024-02-17_14-33-51.pngScreenshot_from_2024-02-17_14-36-27.pngScreenshot_from_2024-02-17_14-39-38.png
14:01

Run 36 started.

We put both detectors to the fully out position. Detectors then driven IN using the pnuematic motor only once the beam is ready and driven fully
Entry  Sat Feb 17 06:19:27 2024, JM, CB, Run 35 - contd Screenshot_from_2024-02-17_07-20-01.pngScreenshot_from_2024-02-17_07-21-27.pngScreenshot_from_2024-02-17_09-09-35.pngScreenshot_from_2024-02-17_09-13-44.pngScreenshot_from_2024-02-17_09-14-35.png
07:10

FEE temperatures OK

System checks OK
Entry  Fri Feb 16 22:03:27 2024, TD, Run 35 - night shift 49x

22.51 DAQ continues file G22-86/R35_36
Entry  Fri Feb 16 10:02:41 2024, JM, OF, CB, AR, EM, Run 35 - cooled beam on target 27x
11:01

Run 35 started cooled beam on target

Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm)
ELOG V3.1.4-unknown