AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 9 of 38  ELOG logo
Entry  Mon Jun 16 10:46:11 2025, CB JM JG AK, Run82 
Background without beam while source is optimised.
Entry  Wed May 29 16:46:21 2024, NP, AB, PM, Run7 - Measurements only with ion beam. Screenshot_from_2024-05-29_21-49-57.pngScreenshot_from_2024-05-29_21-50-14.png
18:19 Start or run 7: In beam has been optimzed up to now by Zoran and Claude. ~7E7 particles at injection. From now on, only the injection beamline
is optimized by Operators.

Detectors IN (left arm pot =18.86 mm, right arm pot = 19.80 mm)
Entry  Sun Jun 8 10:05:30 2025, EM, PC, JM, Run57 
11:06

Run during beam change. We will go down to 200 keV/u

All the checks are ok.
Entry  Sun Jun 8 09:07:22 2025, EM, PC, JM, Run56 Screenshot_from_2025-06-08_10-10-06.pngScreenshot_from_2025-06-08_10-15-01.png
NOTE: RunR55 is missing

Run56: Background run with 250 keV/u. Target off using the usual procedure.

All  checks ok!
Entry  Wed May 29 08:10:32 2024, JM, Run4 - alpha background 
09:00

R4 alpha background continues, currently R4_12

Temps OK, system checks unchanged from previous status (OK, aida16 clock and ADC issue)
Entry  Fri May 30 20:06:48 2025, JM, CB, NP, Run35 8x
21:00

Run 35 started.

D+ beam deuterium target. D+ beam energy is 2 MeV/u. (beam calc calculation is 1.9211 MeV/u -> may be wrong cooler voltage, need to check
Entry  Thu Feb 15 21:07:00 2024, JM, AB, AR, OF, Run33 - cooled beam on target 22x
22:27

Run 33 started cooled beam on target.

Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm)
Entry  Thu Feb 15 12:40:52 2024, JM. CB, AR, AB, Run30 - uncooled beam on target 29x
Run started 13:40

Target density 4.3e11, Beam injection is ~1e7, Pressure in the ring is ~1e-10 mbar.

Detectors have been moved IN with servo motors only (left arm pot = 36.5 mm, right arm pot =37.7 mm
Entry  Mon Jun 3 21:37:20 2024, CN, EM, CB, Run30 Screenshot_from_2024-06-03_23-15-37.pngScreenshot_from_2024-06-03_23-16-18.pngScreenshot_from_2024-06-03_23-17-16.png
Beam energy = 3 MeV

Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.

Beam intensity at inj ~ 2.5e7
Entry  Mon Feb 5 05:45:26 2024, CB TD, Run3 - end 47x
06.40 DAQ continues file G22-88/R3_42

      DSSSD bias OK - attachment 1
Entry  Sun Feb 4 08:40:04 2024, CB TD, Run3 - contd 22x
09.30 DAQ continues file G22-88/R3_17

      DSSSD bias OK - attachment 1
Entry  Thu Feb 15 10:39:50 2024, JM, JG, ML, AG, CB, Run29 - beam optimisation 
11:27

Run 29 started. Beam energy is 1.3435 MeV/u with a cooler voltage of 751.3 V.

We observe significantly greater count rate for top right detector (DSSD#1) now that the beam energy has been lowered. ADC over range? Beam target
Entry  Mon Jun 3 15:17:41 2024, CN, EM, CB, Run29  Screenshot_from_2024-06-03_18-04-47.pngScreenshot_from_2024-06-03_18-05-11.pngScreenshot_from_2024-06-03_18-06-09.pngScreenshot_from_2024-06-03_18-06-40.pngScreenshot_from_2024-06-03_20-35-00.png
16:15

In the previous run while working on the target it was discovered that the valve was closed! Probaly this happened around 10 am, we are not sure.

The gas target inlet valve is open again, working on the target.
Entry  Wed Feb 14 16:52:46 2024, JM, AR, CB, JG, Run28 - beam on target  42x
 

Beam energy - 1.361 MeV/u

17:12
Entry  Mon Jun 3 15:10:12 2024, CN, EM, CB, Run28 Screenshot_from_2024-06-03_16-12-44.pngScreenshot_from_2024-06-03_16-13-11.pngScreenshot_from_2024-06-03_16-14-11.pngScreenshot_from_2024-06-03_16-16-37.png
16:10

We start a new run after doing some test with the motor. Injection time is now a 6s, moving of the motors is working fine.

Merger OK, Tape server OK
Entry  Sun Jun 2 22:46:47 2024, JM, EM, NP, Run24 Screenshot_from_2024-06-02_23-53-00.pngScreenshot_from_2024-06-02_23-53-47.pngScreenshot_from_2024-06-02_23-56-22.png
23:47

Run 24 started - Beam on target

Beam energy is 1.5 MeV.
Entry  Tue Feb 13 17:19:43 2024, JM, AR, NP, AB, RSS, Run22 - cooled beam on target (definitely maybe) 48x
18:05 We believe we have an overlap between the beam and the target. Run 22 started.

          CARME detectors in with the servo ONLY. Left arm pot 36.5 mm, right arm pot 37.7 mm

          Target density apporx 2e11 atoms/cm2.
Entry  Mon May 26 08:56:56 2025, EM,LB, Run20 8x
Run 20 running

We start a new run since the laser guys will do some measurements.

Zoran will increase the beam intensity
Entry  Mon Feb 12 01:40:48 2024, TD, JM, CB, AR, RSS, Run17 - Run20  49x

02.35 DAQ continues file G22-88/R17_30
Entry  Sun Feb 11 13:28:46 2024, JM, CB, TD, Run16 - beam on target 30x
13:37 Run started - no beam in the ring (One of the ring magnets was still on RED when it should have been set to green by HKR)

14:28 Beam ON - still observe beam halo on DSSD0 (Top left)

          YR09 Vertical and horizontal offsets set to -9.0 mm
ELOG V3.1.4-unknown