AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 9 of 38  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subjectdown Text Attachments
  749   Mon Jun 16 10:46:11 2025 CB JM JG AKRun82Background without beam while source is
optimised.
  
  558   Wed May 29 16:46:21 2024 NP, AB, PMRun7 - Measurements only with ion beam.18:19 Start or run 7: In beam has been
optimzed up to now by Zoran and Claude. ~7E7
particles at injection. From now on, only
 Screenshot_from_2024-05-29_21-49-57.pngScreenshot_from_2024-05-29_21-50-14.png 
  727   Sun Jun 8 10:05:30 2025 EM, PC, JMRun5711:06

Run during beam change. We will
go down to 200 keV/u
  
  726   Sun Jun 8 09:07:22 2025 EM, PC, JMRun56NOTE: RunR55 is missing

Run56: Background run with 250
keV/u. Target off using the usual procedure.
 Screenshot_from_2025-06-08_10-10-06.pngScreenshot_from_2025-06-08_10-15-01.png 
  556   Wed May 29 08:10:32 2024 JMRun4 - alpha background09:00

R4 alpha background continues,
currently R4_12
  
  704   Fri May 30 20:06:48 2025 JM, CB, NPRun3521:00

Run 35 started.

D+ beam deuterium target. D+ beam
 8x 
  518   Thu Feb 15 21:07:00 2024 JM, AB, AR, OFRun33 - cooled beam on target22:27

Run 33 started cooled beam on target.

Detectors IN (left arm pot =36.5
 22x 
  516   Thu Feb 15 12:40:52 2024 JM. CB, AR, ABRun30 - uncooled beam on targetRun started 13:40

Target density 4.3e11, Beam injection
is ~1e7, Pressure in the ring is ~1e-10 mbar.
 29x 
  583   Mon Jun 3 21:37:20 2024 CN, EM, CBRun30Beam energy = 3 MeV

Horizontal beam position = 7.0
mm, vertical beam position = 0.0 mm.
 Screenshot_from_2024-06-03_23-15-37.pngScreenshot_from_2024-06-03_23-16-18.pngScreenshot_from_2024-06-03_23-17-16.png 
  491   Mon Feb 5 05:45:26 2024 CB TDRun3 - end06.40 DAQ continues file G22-88/R3_42

      DSSSD bias OK - attachment 1
 47x 
  490   Sun Feb 4 08:40:04 2024 CB TDRun3 - contd09.30 DAQ continues file G22-88/R3_17

      DSSSD bias OK - attachment 1
 22x 
  515   Thu Feb 15 10:39:50 2024 JM, JG, ML, AG, CBRun29 - beam optimisation11:27

Run 29 started. Beam energy is
1.3435 MeV/u with a cooler voltage of 751.3
  
  582   Mon Jun 3 15:17:41 2024 CN, EM, CBRun29 16:15

In the previous run while working
on the target it was discovered that the
 Screenshot_from_2024-06-03_18-04-47.pngScreenshot_from_2024-06-03_18-05-11.pngScreenshot_from_2024-06-03_18-06-09.pngScreenshot_from_2024-06-03_18-06-40.pngScreenshot_from_2024-06-03_20-35-00.png 
  514   Wed Feb 14 16:52:46 2024 JM, AR, CB, JGRun28 - beam on target  

Beam energy - 1.361 MeV/u

17:12
 42x 
  581   Mon Jun 3 15:10:12 2024 CN, EM, CBRun2816:10

We start a new run after doing
some test with the motor. Injection time
 Screenshot_from_2024-06-03_16-12-44.pngScreenshot_from_2024-06-03_16-13-11.pngScreenshot_from_2024-06-03_16-14-11.pngScreenshot_from_2024-06-03_16-16-37.png 
  577   Sun Jun 2 22:46:47 2024 JM, EM, NPRun2423:47

Run 24 started - Beam on target

Beam energy is 1.5 MeV.
 Screenshot_from_2024-06-02_23-53-00.pngScreenshot_from_2024-06-02_23-53-47.pngScreenshot_from_2024-06-02_23-56-22.png 
  510   Tue Feb 13 17:19:43 2024 JM, AR, NP, AB, RSSRun22 - cooled beam on target (definitely maybe)18:05 We believe we have an overlap between
the beam and the target. Run 22 started.

         
 48x 
  691   Mon May 26 08:56:56 2025 EM,LBRun20Run 20 running

We start a new run since the laser
guys will do some measurements.
 8x 
  508   Mon Feb 12 01:40:48 2024 TD, JM, CB, AR, RSSRun17 - Run20
02.35 DAQ continues file G22-88/R17_30
 49x 
  507   Sun Feb 11 13:28:46 2024 JM, CB, TDRun16 - beam on target13:37 Run started - no beam in the ring
(One of the ring magnets was still on RED
when it should have been set to green by
 30x 
ELOG V3.1.4-unknown