ID |
Date |
Author |
Subject |
Text |
 |
34
|
Fri Apr 13 08:24:47 2018 |
Thomas Chillery, Lucio Gialanella | Attempting to add downstream S2 to DAQ setup and fixing problems during setup | Date: 07/04/2018 (Last day of April shift)
9:55 pressures read: CHUP = 1.3e-5
mBar, CHDW = 3.5 e-5 mBar |
|
16
|
Thu Feb 22 14:55:09 2018 |
Thomas Chillery | ADC6 Settings | DAQ Settings for ADC6 settings attached.
ADC 6 has been used for the pin diode during
the week starting 19/02/2018 |
    |
57
|
Mon Dec 3 11:54:55 2018 |
Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane | 7Li 6.0 MeV on CH2 XVI and XVIII, and on natC III | On 25/11/2018:
At 8:45 the pressures read (mBar):
TPU1 = 1.0e-6
TPU2 |
 |
32
|
Thu Apr 12 13:12:00 2018 |
Thomas Chillery, Raffaele Buompane | 7Li 5.0MeV Beam tests with Central S2 | Date: 06/04/2018 (after 16:40)
We powered the preamps for the
two S2 detectors and the diode. |
|
35
|
Fri Apr 13 13:59:18 2018 |
Thomas Chillery, Lucio Gialanella | 7Li 5.0MeV Beam test with Central S2 and Downstream S2 first 8 channels | Date: 07/04/2018
At 12:10 we started the DAQ for
5.0 MeV 7Li in 2+ charge state bombarding |
   |
54
|
Mon Nov 26 17:10:13 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane | 7Li 4.0 MeV beam on natC target 3 | On 23/11/2018:
After the runs with 7Li on CH2
15, we moved the target ladder to position |
|
53
|
Sat Nov 24 16:39:22 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane | 7Li 4.0 MeV beam on CH2 target 15 | On 23/11/2018:
Tuned beam for 4.0 MeV 7Li, charge
state 2+ |
|
33
|
Thu Apr 12 14:14:09 2018 |
Thomas Chillery, Raffaele Buompane | 7Be 5.0MeV Beam test with central S2 | Date: 06/04/2018
Before starting this beam test
we lowered the channel thresholds on ADC |
  |
38
|
Fri Apr 13 14:56:11 2018 |
Thomas Chillery, Lucio Gialanella | 7Be 5.0MeV Beam test on CH2 target IV with central S2 and downstream S2 channels 0-7 | Date: 07/04/2018
FC - 4 = 410 - 260 = 150 pA
We moved the target ladder to position |
|
37
|
Fri Apr 13 14:42:31 2018 |
Thomas Chillery, Lucio Gialanella | 7Be 5.0MeV Beam test on CH2 target III with central S2 and downstream S2 channels 0-7 | Date: 07/04/2018
To run the measurement we:
Opened the central iris |
|
56
|
Mon Dec 3 11:28:53 2018 |
Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Antonino d'Leva | 7Be 4.0MeV on CH2 XVI and natC III | On 24/11/2018:
After the short test with 4.0MeV
7Li (see eLog #55) the beam was tuned for |
   |
64
|
Mon Dec 3 17:02:48 2018 |
Thomas Chillery, Carlo Bruno, Lizeth Morales, Guiseppe Porzio, Raffaele Buompane | 6Li(p,p): Tuning 1.5MeV 6Li 1+ beam | On 27/11/2018:
Started tuning for 1.5MeV 6Li 1+.
Set ladder to position #2 - Blank 10mm. Far |
 |
65
|
Mon Dec 3 17:34:38 2018 |
Thomas Chillery, Carlo Bruno, Raffaele Buompane | 6Li(p,p): Test measurement of 1.5MeV 6Li 1+ on thin CH2 50 | On 27/11/2018:
After tuning beam (see previous
eLog entry # 64) |
 |
58
|
Mon Dec 3 12:32:54 2018 |
Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Raffaele Buompane | 6.0MeV 7Be on CH2 XVIII | On 25/11/2018:
The beam was tuned for 6.0MeV 7Be
2+ |
   |
61
|
Mon Dec 3 16:17:29 2018 |
Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane, David Rapagni | 3.0MeV 7Li on CH2 XIX and natC III | On 26/11/2018, after changing the far S2
mylar foil (see previous eLog entry #60):
Checked pulser frequency on oscilloscope: |
  |
62
|
Mon Dec 3 16:39:42 2018 |
Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane | 3.0MeV 7Be on CH2 XIX | On 26/11/2018:
Tuned beam for 3.0MeV 7Be 2+. Far
S2 iris was closed during tuning. |
 |
74
|
Tue Dec 4 09:38:18 2018 |
Thomas Chillery | 181122 Electronics Map | See attached for S2 electronics map, following
channels from S2 outputs to ADC inputs
For the 19/11/2018 - 29/11/2018 |
 |
1
|
Tue Aug 1 12:26:13 2017 |
Thomas Chillery | 10th - 22nd July 2017 Summary Report | Attached is a report summarising work performed
on the electronics and target chamber in
CIRCE from the 10th to the 22nd July 2017. |
|