AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE, Page 4 of 4  ELOG logo
ID Date Author Subjectdown Text Attachments
  34   Fri Apr 13 08:24:47 2018 Thomas Chillery, Lucio GialanellaAttempting to add downstream S2 to DAQ setup and fixing problems during setupDate: 07/04/2018 (Last day of April shift)

9:55 pressures read: CHUP = 1.3e-5
mBar, CHDW = 3.5 e-5 mBar
  
  16   Thu Feb 22 14:55:09 2018 Thomas ChilleryADC6 SettingsDAQ Settings for ADC6 settings attached.
ADC 6 has been used for the pin diode during
the week starting 19/02/2018
 ADC6_Settings1.jpgADC6_Settings2.jpgADC6_Settings3.jpgADC6_Settings4.jpgADC6_Settings5.jpg 
  57   Mon Dec 3 11:54:55 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane7Li 6.0 MeV on CH2 XVI and XVIII, and on natC IIIOn 25/11/2018:

At 8:45 the pressures read (mBar):


TPU1 = 1.0e-6
TPU2
 181125113734_ADC1_Ch9.png181125113734_ADC3_Ch16.png 
  32   Thu Apr 12 13:12:00 2018 Thomas Chillery, Raffaele Buompane7Li 5.0MeV Beam tests with Central S2Date: 06/04/2018 (after 16:40)

We powered the preamps for the
two S2 detectors and the diode.
  
  35   Fri Apr 13 13:59:18 2018 Thomas Chillery, Lucio Gialanella7Li 5.0MeV Beam test with Central S2 and Downstream S2 first 8 channelsDate: 07/04/2018

At 12:10 we started the DAQ for
5.0 MeV 7Li in 2+ charge state bombarding
 180407_7Li_5MeV_CentralS2_FrontStrip.png180407_7Li_5MeV_DWS2_FrontStrip.png180407_7Li_5MeV_CentralS2_BackStrip.png180407_7Li_5MeV_Diode.png 
  54   Mon Nov 26 17:10:13 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane7Li 4.0 MeV beam on natC target 3On 23/11/2018:

After the runs with 7Li on CH2
15, we moved the target ladder to position
  
  53   Sat Nov 24 16:39:22 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane7Li 4.0 MeV beam on CH2 target 15On 23/11/2018:

Tuned beam for 4.0 MeV 7Li, charge
state 2+
  
  33   Thu Apr 12 14:14:09 2018 Thomas Chillery, Raffaele Buompane7Be 5.0MeV Beam test with central S2Date: 06/04/2018

Before starting this beam test
we lowered the channel thresholds on ADC
 180406_7Be_5MeV_CentralS2_BackStrip.jpg180406_7Be_5MeV_Diode.jpg180406_7Be_5MeV_CentralS2_FrontStrip.jpg 
  38   Fri Apr 13 14:56:11 2018 Thomas Chillery, Lucio Gialanella7Be 5.0MeV Beam test on CH2 target IV with central S2 and downstream S2 channels 0-7 Date: 07/04/2018

FC - 4 = 410 - 260 = 150 pA

We moved the target ladder to position
  
  37   Fri Apr 13 14:42:31 2018 Thomas Chillery, Lucio Gialanella7Be 5.0MeV Beam test on CH2 target III with central S2 and downstream S2 channels 0-7 Date: 07/04/2018

To run the measurement we:


Opened the central iris
  
  56   Mon Dec 3 11:28:53 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Antonino d'Leva7Be 4.0MeV on CH2 XVI and natC IIIOn 24/11/2018:

After the short test with 4.0MeV
7Li (see eLog #55) the beam was tuned for
 181124120558_ADC1_Ch9.png181124120558_ADC3_Ch16.png181124182304_ADC1_Ch9.png181124182304_ADC3_Ch16.png 
  64   Mon Dec 3 17:02:48 2018 Thomas Chillery, Carlo Bruno, Lizeth Morales, Guiseppe Porzio, Raffaele Buompane6Li(p,p): Tuning 1.5MeV 6Li 1+ beamOn 27/11/2018:

Started tuning for 1.5MeV 6Li 1+.
Set ladder to position #2 - Blank 10mm. Far
 IMG_3285.JPGIMG_3292.JPG 
  65   Mon Dec 3 17:34:38 2018 Thomas Chillery, Carlo Bruno, Raffaele Buompane6Li(p,p): Test measurement of 1.5MeV 6Li 1+ on thin CH2 50On 27/11/2018:

After tuning beam (see previous
eLog entry # 64)
 181127193908_ADC1_Ch9.png181127193908_ADC3_Ch16.png 
  58   Mon Dec 3 12:32:54 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Raffaele Buompane6.0MeV 7Be on CH2 XVIIIOn 25/11/2018:

The beam was tuned for 6.0MeV 7Be
2+
 181125121226_ADC1_Ch9.png181125121226_ADC3_Ch16.png181125223800_ADC1_Ch9.png181125223800_ADC3_Ch16.png 
  61   Mon Dec 3 16:17:29 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane, David Rapagni3.0MeV 7Li on CH2 XIX and natC IIIOn 26/11/2018, after changing the far S2
mylar foil (see previous eLog entry #60):

Checked pulser frequency on oscilloscope:
 181126164509_ADC1_24.png181126183711_ADC1_Ch9.png181126183711_ADC3_Ch16.png 
  62   Mon Dec 3 16:39:42 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane3.0MeV 7Be on CH2 XIXOn 26/11/2018:

Tuned beam for 3.0MeV 7Be 2+. Far
S2 iris was closed during tuning.
 181126192446_ADC1_Ch9.png181126192446_ADC3_Ch16.png 
  74   Tue Dec 4 09:38:18 2018 Thomas Chillery181122 Electronics MapSee attached for S2 electronics map, following
channels from S2 outputs to ADC inputs

For the 19/11/2018 - 29/11/2018
 181122_Electronics_Channel_Map.ods181122_Electronics_Channel_Map.xls 
  1   Tue Aug 1 12:26:13 2017 Thomas Chillery10th - 22nd July 2017 Summary ReportAttached is a report summarising work performed
on the electronics and target chamber in
CIRCE from the 10th to the 22nd July 2017.
 Summary.docx 
ELOG V3.1.4-unknown