AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE, Page 3 of 4  ELOG logo
ID Date Author Subjectdown Text Attachments
  6   Fri Feb 16 18:21:17 2018 Thomas ChilleryIris arm problems After lunch we were still having problems
with the aperture hook, see first attached
image highlighting the arm is located in
 IMG_2677.JPGApertureArm_PetersSolution.jpg 
  59   Mon Dec 3 12:57:54 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, David RapagniFinishing 6.0MeV 7Be 2+ and 7Li 2+ beam runsOn 26/11/2018:

The accelerator and chamber setup
were still operating after the overnight
 181126105357_ADC1_Ch9.png181126105357_ADC3_Ch16.png 
  63   Mon Dec 3 16:47:40 2018 Thomas Chillery, Carlo Bruno, Lizeth MoralesFinishing 3.0MeV 7Be measurements with CH2 XIX and natC IIIOn 27/11/2018:

At 8:40 Far S2 bias = -130.0V,
leak I = 1.74uA. Diode bias = -70.1V, leak
 181127085408_ADC1_Ch9.png181127085408_ADC3_Ch16.png181127090808_ADC1_24.png181127092128_ADC1_Ch9.png181127092128_ADC3_Ch16.png 
  50   Sat Nov 24 15:05:40 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth MoralesFAIR DAQThe FAIR DAQ IP address: 192.168.1.90

The data is saved in /Local_Parts/Part0DE/

After each run we should copy the
  
  39   Fri Apr 13 15:08:04 2018 Thomas Chillery, Lucio GialanellaEnd of shift - lab cleanupDate: 07/04/2018

Began dismounting detectors:


All detectors powered off
Closed
  
  71   Mon Dec 3 18:45:17 2018 Thomas Chillery, Raffaele BuompaneEnd of beamtime - Module settingsDiode Ortec 571 Amplifier Settings:


Fine gain: 10 (0.5 ->1.5)
Course
gain: 50
Shaping time: 0.5us
BLR
  
  73   Mon Dec 3 19:04:20 2018 Thomas Chillery, Raffaele BuompaneEnd of beamtime - Items to be shipped back to EdinburghTo be shipped back to Edinburgh for repair:





Item
  
  72   Mon Dec 3 18:55:31 2018 Thomas Chillery, Raffaele BuompaneEnd of beamtime - CleanupOn 29/11/2018:

Dismounted S2 2323-18 (496um),
12um mylar, diode, and diodes 0.9um mylar.
 8x 
  23   Tue Mar 6 15:55:04 2018 Thomas Chillery, Raffaele BuompaneEnd of February 2018 ShiftsOn 23/02/2018:

At the end of the February 2018
shifts the detectors bias settings were:
  
  40   Wed Jul 11 15:55:35 2018 Thomas ChilleryElectronics Channel MapSee attached for Electronics Channel Map
spreadsheet.

This is valid for the February
 Electronics_Channel_Map.ods 
  49   Thu Nov 22 11:53:08 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth MoralesDAQ tests with alpha sourceThe target ladder is set for position 7
- the double alpha source.

Looking at the FAIR DAQ, for the
 IMG_3329.JPGAlphaSourceCertificate.jpg 
  48   Thu Nov 22 11:34:07 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth MoralesContinuing Electronic Chain TestsThis morning at 8:35am the pressures read
(in mBar):


TPU1 = 2.0e-6
TPU2
  
  21   Tue Mar 6 15:29:55 2018 Thomas Chillery, Raffaele BuompaneCollecting S2 Alpha Calibration Spectra at End of February Test ShiftsOn 23/02/2018:

We moved the target ladder to position
7, 5.019mm, with the alpha source facing
 180223_Alpha_S2FrontStrip_ADC2CH20.png180223_Alpha_S2BackStrip_ADC4CH24.png 
  41   Wed Nov 21 08:18:14 2018 Thomas Chillery, Marialuisa AliottaChecking Target Ladder CalibrationOn 19/11/2018:

There were three CH2 targets already
mounted on the target frame, CH2 III, IV,
 IMG_3204.JPGIMG_3205.JPGIMG_3200.JPG 
  60   Mon Dec 3 15:51:11 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, David RapagniChanging far S2 protective mylar foil, preparing for 3.0MeV 7Li and 7BeOn 26/11/2018, after 6.0MeV 7Be and 7Li
beam measurements:

At 11:15:
 IMG_3273.JPG 
  76   Tue Dec 4 11:23:29 2018 Thomas ChilleryChamber DimensionsSee attached pictures for measurements
of the 7Be(p,p) chamber dimensions.

The target ladder center - Far
 IMG_3397.JPGIMG_3398.JPGIMG_3399.JPG 
  31   Thu Apr 12 12:47:04 2018 Thomas Chillery, Raffaele BuompaneCentral S2 Alpha CalibrationDate: 06/04/2018

We connected the analogue signals
of RAL X, XII, XIII, and "R" to
  
  69   Mon Dec 3 18:15:42 2018 Thomas Chillery, Raffaele BuompaneCalibration with alpha source - no mylar on Far S2On 28/11/2018:

At 13:35: Far S2 bias = -130.0V,
leak I = 1.55uA. Diode bias = -70.1V, leak
 IMG_3337.JPG182812_S2_Alpha_NoMylar.jpg 
  70   Mon Dec 3 18:30:53 2018 Thomas Chillery, Raffaele BuompaneCalibration with alpha source - 12um mylar on Far S2On 28/11/2018:

Mounted 12um mylar in front of
far S2 - see attached pictures 1 and 2
 IMG_3356.JPGIMG_3363.JPG181128184505_ADC1_Ch9.png 
  68   Mon Dec 3 17:59:48 2018 Thomas Chillery, Raffaele BuompaneCalibration with alpha source - 0.9um mylar on Far S2On 28/11/2018:

After pulser walkthrough (see eLog
entry #67)
 IMG_3305.JPGIMG_3307.JPGIMG_3315.JPGIMG_3313.JPG181128123940_ADC1_Ch9.png 
ELOG V3.1.4-unknown