AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 1 of 34  ELOG logo
ID Date Author Subject Text Attachments
  679   Mon Dec 23 10:54:46 2024 TDMonday 23 December 2024
11.54 re-established remote access via AnyDesk
- details to follow
  
  678   Tue Dec 17 12:45:36 2024 JB, MP, CCAIDA timing test 




 IMG_2536.jpeg20241217_141148.jpg20241217_141206.jpg 
  677   Mon Dec 16 13:07:04 2024 JB, MP, CCAIDA timing testhttps://elog.gsi.de/despec/Implantation+Stack/9?suppress=1
- Day 1 ELOG

Day2:
 16x 
  676   Sat Dec 14 11:52:42 2024 TDSaturday 14 December
11:00 Visual inspection FEE64 adaptor PCBs
& cabling
 27x 
  675   Wed Dec 11 14:46:21 2024 TD, JB, CC, MPMounting of AIDA, bPlast and BB7 for testSnout assembled for detector position and
timing test.

The planned test is to use a BGO
 20241211_161837.jpg20241211_161833.jpg20241211_161830.jpg20241211_161820.jpg 
  674   Mon Dec 9 12:28:01 2024 NH, CC, MPTest of BB7 on AIDA ElectronicsBB7 connected to aida07, sitting in a cardboard
box
  
  673   Thu Dec 5 11:18:46 2024 TDOffline analysis S100 data files R21_0-R21_99Offline analysis of S100 data files R21_0
- R21_99 (162Eu setting)
 23x 
  672   Wed Dec 4 09:57:24 2024 TDHISPEC DESPEC meeting presentation - November 2024 -0 Summary of AIDA performance 2024   Summary_of_AIDA_2024_distro.pdf 
  671   Tue Nov 19 11:24:25 2024 TDAnydesk restarted remotely
Anydesk restarted remotely per https://elog.ph.ed.ac.uk/CARME/489
  
  670   Tue Nov 5 15:19:35 2024 TDS505 offline analysis R5_780 - R5_814Offline analysis of data files S505/R5_780
- R5_814 (corresponding to MBS data files
73-74) 
 24x 
  669   Wed Aug 14 12:40:11 2024 JBRepaired DSSSD delivery 14.09.2024Three BB18-1000 triples AIDAs collected
on 14.09.2024

Find attached visual of the wafer
 11x 
  668   Sun Jul 14 16:52:28 2024 TDS181 R7_38-44   7x 
  667   Sun Jul 14 14:37:53 2024 TDS181 R6_375-380   6x 
  666   Mon Jun 17 02:13:21 2024 TDMonday 17 June03.11 DSSSD bias & leakage current OK - attachment
1
 43x 
  665   Sun Jun 16 03:11:27 2024 TDSunday 16 June04.08 DSSSD bias & leakage current OK - attachment
1
 26x 
  664   Sat Jun 15 00:28:01 2024 TDSaturday 15 JuneBeam lost due to septum failure c. 18.15 Friday
14 June
 45x 
  663   Fri Jun 14 15:00:47 2024 Norah , Muneerah 16:00-20:00 Friday 14 June Everything appears to be running
smoothly. Attachments 1-4 were taken around
16:00
 13x 
  662   Fri Jun 14 06:22:39 2024 TD08:00-16:00 Friday 14 June
07.23 All histograms & stats zero'd
 23x 
  661   Thu Jun 13 23:04:01 2024 Dan Judson, TD0.00-8.00 14/6/240.00 checks - all looks ok

Voltage/currents - attachment 1

Rates attachment 2 + 3
 40x 
  660   Thu Jun 13 21:06:44 2024 Robert Page16:00 to 00:00 shift on 13/6/2024Elog went down around the end of the last
shift, so final screenshots were not uploaded
at that point.
 26x 
ELOG V3.1.4-unknown