|
ID |
Date |
Author |
Subject |
Text |
 |
|
129
|
Fri Feb 21 09:21:10 2020 |
NH | (Early) Alpha Analysis | Overnight alpha data
======================================
|
    |
|
128
|
Thu Feb 20 16:35:55 2020 |
TD, NH | Thu 20 February 2020 | DSSD#3 (most downstream) was replaced
Noted that old DSSD wafer was not sitting |
12x |
|
127
|
Wed Feb 19 10:58:29 2020 |
NH, PJCS | Report: aida09 Kernel Panic & Lost WR | > aida09 crashed over the weekend and automatically
rebooted.
> After the reboot the WR timestamp sent |
|
|
126
|
Mon Feb 17 09:48:34 2020 |
NH | Report: aida09 Kernel Panic & Lost WR | aida09 crashed over the weekend and automatically
rebooted.
After the reboot the WR timestamp sent to |
    |
|
125
|
Fri Feb 14 12:50:29 2020 |
NH | AIDA Noise 14.02.2020 | Electricians changed the grounding for the
DESPEC platform to a large pillar that goes
deep into soil
|
6x |
|
124
|
Wed Jan 29 19:09:51 2020 |
NH | aida10 troubleshooting | > aida10 has no ASIC events when running without
pulser
>
|
|
|
122
|
Wed Jan 29 12:22:13 2020 |
NH | aida10 troubleshooting | aida10 has no ASIC events when running without
pulser
|
  |
|
121
|
Mon Jan 20 14:01:23 2020 |
NH | AIDA Noise 20.01.2019 | > Checking noise
>
> DESPEC crate entirely offline except:
|
6x |
|
120
|
Wed Jan 15 14:53:41 2020 |
NH | AIDA Noise 14.01.2019 | Checking noise
DESPEC crate entirely offline except:
|
6x |
|
119
|
Fri Dec 20 12:04:03 2019 |
NH, TD | Friday 20 December 2019 | Fig 1: DSSD Leakage currents ok
Fig 2: FEE Temps ok
|
7x |
|
118
|
Fri Dec 20 10:19:29 2019 |
NH | Alpha Analysis (Pre Run) | ======================================
|
 |
|
116
|
Thu Dec 19 14:45:42 2019 |
TD | FEE64 ASIC settings - different diode link settings | [npg@aidas-gsi 2019Oct31-13.24.23]$ pwd
/MIDAS/DB/EXPERIMENTS/AIDA/2019Oct31-13.24.23
[npg@aidas-gsi 2019Oct31-13.24.23]$ /bin/csh
|
|
|
115
|
Thu Dec 19 14:26:09 2019 |
TD | BNC PB-5 - Manual | |
|
|
114
|
Thu Dec 19 14:07:38 2019 |
TD | Report - low - aida08 ADC spectrum size 32k cf. 64k channels expcted using layout | Note that aida08 spectrum 1.8.L size is (shown
as) 32k channels cf. 64k channels expected
using layout - attachment 1 - 5
|
6x |
|
113
|
Thu Dec 19 13:09:32 2019 |
TD | MIDAS app launcher command lines |
App Path
|
|
|
112
|
Thu Dec 19 13:06:02 2019 |
TD, NH | AIDA@DESPEC To Do list | FAIR phase 0 DESPEC experiments are scheduled
March-May 2020 see
|
|
|
111
|
Thu Dec 19 10:11:59 2019 |
TD | Report - medium - FEE64 panics during boot |
Some of the FEE64s aida01 .. aida12 panic
during boot
|
|
|
110
|
Thu Dec 19 09:22:52 2019 |
TD | Thusrday 19 December | 10.15 Found DAQ running at c. 1M data items/s
|
21x |
|
109
|
Wed Dec 18 17:39:27 2019 |
TD | Wednesday 18 December |
18.40 Detector biases & leakage currents
OK - attachment 1
|
23x |
|
108
|
Wed Dec 18 02:44:27 2019 |
NH | 17.12.19, 18.12.19 | Beam: 238U (850 MeV/u)
Fragment: 168Re
|
7x |