AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 27 of 35  ELOG logo
  ID Date Author Subject Text Attachments
  171   Thu Mar 4 11:16:13 2021 OHFurther cases of possible database issuesDuring testing for the S452 experiment yesterday
we were running through the steps of a restart.
 ErrorMessage.PNGerrorMessage.txt 
  170   Thu Mar 4 11:03:04 2021 NHS452 Operating NotesPlease note the following "quirks" currently
present in S452 that are important
  
  169   Thu Mar 4 10:13:48 2021 OHAnyDesk connection instuction   Connecting_to_AnyDesk_at_GSI_for_AIDA.pdf 
  168   Wed Mar 3 15:02:19 2021 CAMBS command line startup/MIDAS/Linux/startup/datarelaymbs    
  167   Sat Feb 27 12:47:57 2021 NHAIDA Rates/Situation Updated figures as of 27 Feb 2021 - S4 is
now closed for experiments but may open on
Wednesday.
 10x 
  166   Mon Feb 22 18:18:47 2021 NHAIDA Rates/Situation The ground cable (LEMO00) in aida07 was disconnected,
it has been reinserted and the waveforms
now look good.
 8x 
  165   Fri Feb 12 17:31:04 2021 NHBackground runA background run has been started to check
the AIDA channels.
It is in /TapeData/BGFEB21
  
  164   Sat Feb 6 10:45:55 2021 NHAIDA Status Feb 2021> 01.02.2021 - Four new sets of PSU, HDMI
& Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for
 pregrd050222_E.pngpregrd050221_O.pngpostgrd050221_O.pngpostgrd050221_E.png 
  163   Mon Feb 1 15:19:07 2021 NHAIDA Status Feb 202101.02.2021 - Four new sets of PSU, HDMI &
Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for
  
  162   Tue Nov 24 13:10:42 2020 NHWaveforms with frame groundedAIDA Frame is now grounded to platform (will
add photo later)
 waves_odd.pngwaves_even.png20201124_164416.jpg20201124_164413.jpg 
  161   Tue Oct 6 15:48:06 2020 NHnnrpi kernel updateFYI:

The SD card on nnrpi2 was full again causing
  
  160   Tue Jul 7 08:50:27 2020 NHnnrpi2 does not bootMIDAS was not working properly on nnrpi2 -
power cycled. Now system does not boot properly,
it gets stuck trying to login claiming "PAM
  
  159   Tue Jul 7 08:04:57 2020 NHPower failure in MesshuetteLast week there was a power failure in Messhuette
(FRS control room) - AIDA-3 and MBS were
affected.
  
  157   Wed Mar 18 18:02:37 2020 PJCSNew Firmware loaded in all FEE64sLoaded new frimware into all 12 FEE64s
in the system. IWR_Dec19_4.bin 

Booted ok after power-cycle.  
  
  156   Mon Mar 16 07:25:24 2020 NHEnd of Experiment08:25 Beam Stopped, end of S480

Tape Server stopped at R12_2097

Started again in no storage mode
  
  155   Mon Mar 16 05:08:12 2020 TA, AM, ESRegular entry
02:14 all system wide checks okay 

     FEE temperatures okay 
      leakage
currents okay and recorded to spreadsheet
 6x 
  154   Mon Mar 16 01:07:29 2020 TA, AM, ESRegular entry
02:14 all system wide checks okay 

     FEE temperatures okay 
      leakage
currents okay and recorded to spreadsheet
 13x 
  153   Sun Mar 15 06:45:00 2020 CA, LS, CGSunday 15th March 08:00 - 24:00ASIC settings 2019Oct31-13.24.23
     slow comparator 0xa
 35x 
  152   Sat Mar 14 23:09:28 2020 MB, SJ, MRSunday 15th March 0:00-8:00AIDA ELog filled out by DESPEC night shift
members Matthew Brunet (MB), Shaheen Jazrawi
(SJ), and Matthias Rudiger (MR).
 16x 
  151   Sat Mar 14 07:13:59 2020 DK, TD, LS, CGSaturday 14th March 08:00 - 24:008:15
    All system wide checks passed
    Leak currents are continuing to creep
 41x 
ELOG V3.1.4-unknown