ID |
Date |
Author |
Subject |
Text |
|
691
|
Sat Jan 11 14:14:21 2025 |
TD | aida06 crashed and rebooted 10.1.25 | aida06 crashed and rebooted sometime ( 14:48
- 23:25 ) yesterday. System console log appended.
|
|
690
|
Sat Jan 11 14:05:03 2025 |
TD | Saturday 11 January 2024 | |
10x |
689
|
Fri Jan 10 10:03:43 2025 |
TD | LEC fast comparator threshold too low | > > >
> > > LEC fast comparator has been set to
0x2 (200keV) which is *very* low and means |
|
688
|
Thu Jan 9 17:56:14 2025 |
TD | LEC fast comparator threshold too low | > >
> > LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the |
|
687
|
Thu Jan 9 17:36:50 2025 |
TD | LEC fast comparator threshold too low | >
> LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the |
|
686
|
Thu Jan 9 16:25:51 2025 |
TD | LEC fast comparator threshold too low |
LEC fast comparator has been set to 0x2 (200keV)
which is *very* low and means the fast comparator |
|
685
|
Thu Jan 9 15:43:17 2025 |
JB, CC, MP | Timing test platform moved in | 16:30 We moved the platform in. The system
was still biased and the DAQ was still running.
The system seems to be okay, temperatures |
|
684
|
Thu Jan 9 12:46:43 2025 |
JB, MP, CC | AIDA timing test |
|
|
683
|
Wed Jan 8 16:47:05 2025 |
JB, MP, CC | AIDA timing test |
|
|
682
|
Wed Jan 8 10:46:50 2025 |
TD | Report - aida06 -boot fail due to network issue | 8:01:25/11:42:48|0x000000d00000-0x000000fe0000
: "user_kernel"
08:01:25/11:42:48|0x000000fe0000-0x000001000000 |
|
681
|
Wed Jan 8 10:08:29 2025 |
JB, GB, SD, MP, CC, JG | AIDA noise test with platform in position | Yesterday we spent time essentially performing
a dry run to get AIDA DAQ and bPlast into
the time sorter, there were some issues with |
|
680
|
Mon Dec 30 15:43:42 2024 |
TD | [How To] Restart AnyDesk |
See also https://elog.ph.ed.ac.uk/CARME/489
|
|
679
|
Mon Dec 23 10:54:46 2024 |
TD | Monday 23 December 2024 |
11.54 re-established remote access via AnyDesk
- details to follow
|
|
678
|
Tue Dec 17 12:45:36 2024 |
JB, MP, CC | AIDA timing test |
|
|
677
|
Mon Dec 16 13:07:04 2024 |
JB, MP, CC | AIDA timing test | https://elog.gsi.de/despec/Implantation+Stack/9?suppress=1
- Day 1 ELOG
Day2: |
16x |
676
|
Sat Dec 14 11:52:42 2024 |
TD | Saturday 14 December |
11:00 Visual inspection FEE64 adaptor PCBs
& cabling
|
27x |
675
|
Wed Dec 11 14:46:21 2024 |
TD, JB, CC, MP | Mounting of AIDA, bPlast and BB7 for test | Snout assembled for detector position and
timing test.
The planned test is to use a BGO |
|
674
|
Mon Dec 9 12:28:01 2024 |
NH, CC, MP | Test of BB7 on AIDA Electronics | BB7 connected to aida07, sitting in a cardboard
box
|
|
673
|
Thu Dec 5 11:18:46 2024 |
TD | Offline analysis S100 data files R21_0-R21_99 | Offline analysis of S100 data files R21_0
- R21_99 (162Eu setting)
|
23x |
672
|
Wed Dec 4 09:57:24 2024 |
TD | HISPEC DESPEC meeting presentation - November 2024 -0 Summary of AIDA performance 2024 | |
|