AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 1 of 35  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
  IDdown Date Author Subject Text Attachments
  706   Sun Jun 15 10:53:08 2025 TDSunday 15 June 2025
11.45 DSSSD bias & leakage current - attachment
1
 41x 
  705   Sat Jun 14 11:20:45 2025 TDSaturday 14 June 2025
12.21 BNC PB-5 settings
      Amplitude 1.0V
 30x 
  704   Fri Jun 13 12:42:39 2025 CC, TDFriday 13 June 2025
13.42 ASIC settings 2025Jun12-13.53.04
      *all* FEE64s slow comparator 0x64
 10x 
  703   Thu Jun 12 13:15:25 2025 GB, CC, NK, MP, TDThursday 12 June 2025
EMC tests with NK (Orsay)
 Screenshot_from_2025-06-12_14-39-35.pngScreenshot_from_2025-06-12_14-33-26.png 
  702   Tue Apr 8 08:52:39 2025 TDAIDA grounding
AIDA DSSSDs and FEE64-DSSSD cabling are electrically
isolated (by design) from snout, mounting
 powerstax-ms1u_instructionmanua.pdf20250408_095624.jpg 
  701   Tue Mar 11 11:53:18 2025 TDMonday 10 March
18.30 AIDA powered up for brief test
 11x 
  700   Sat Feb 22 12:35:38 2025 TDOffline analysis data files R9_85-R9_199 (84Mo setting)
Start 00:43 22.2.25 https://elog.gsi.de/despec/G-24-00302/57
AIDA data file R9_85
 22x 
  699   Thu Feb 20 17:06:42 2025 JB, CC, TD,MPWR error for aida 13,14,15,16WR timestamp errors resolved after reseating
the HDMI cables to the MACB
  
  698   Wed Feb 12 10:46:01 2025 TDOffline analysis data files S181 R4_351-396 Analysis data files R4_351-396

 25x 
  697   Fri Jan 31 17:26:47 2025 CC, TD, MPFriday 31 January contd.
18.18 bPlas and BB7 installs complete 
      Restart AIDA DAQ, Merger, Tape Server
 16x 
  696   Fri Jan 31 13:48:29 2025 JBAIDA analysis from HI-DESPEC meeting 20.11.2024AIDA analysis and presentation by J. Bormans
for AIDA made in the HISPEC-DESPEC collaboration
meeting.
  
  695   Fri Jan 31 09:37:47 2025 CC, TD, MPFriday 31 JanuaryImplantation stack mounted - BB18(DS)-1000
+ bPlas + bPlas + 3x BB7(DS)-1000
 26x 
  694   Wed Jan 15 11:58:08 2025 TDOffline analysis data files S505 R3_9 - R3_128 (207Hg setting)
Aanlysis data files R3_9 - R3_128 (207Hg
setting)
 27x 
  693   Mon Jan 13 17:38:18 2025 TDOffline analysis of S505 data files
First timestamp of R2_105 0x16FAEC5E54AABF6C
 10x 
  692   Mon Jan 13 11:32:30 2025 TDOffline analysis S505 data file R3_150Offline analysis of S505 data files R3_150

first WR ts
 22x 
  691   Sat Jan 11 14:14:21 2025 TDaida06 crashed and rebooted 10.1.25aida06 crashed and rebooted sometime ( 14:48
- 23:25 ) yesterday. System console log appended.
  
  690   Sat Jan 11 14:05:03 2025 TDSaturday 11 January 2024
14.37 Detector bias & leakage current OK
- attachment 1
 17x 
  689   Fri Jan 10 10:03:43 2025 TDLEC fast comparator threshold too low> > > 
> > > LEC fast comparator has been set to
0x2 (200keV) which is *very* low and means
  
  688   Thu Jan 9 17:56:14 2025 TDLEC fast comparator threshold too low> > 
> > LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the
  
  687   Thu Jan 9 17:36:50 2025 TDLEC fast comparator threshold too low
> LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the
  
ELOG V3.1.4-unknown