679
|
Mon Dec 23 10:54:46 2024 |
TD | Monday 23 December 2024 |
11.54 re-established remote access via AnyDesk
- details to follow
|
|
678
|
Tue Dec 17 12:45:36 2024 |
JB, MP, CC | AIDA timing test |
|
|
677
|
Mon Dec 16 13:07:04 2024 |
JB, MP, CC | AIDA timing test | https://elog.gsi.de/despec/Implantation+Stack/9?suppress=1
- Day 1 ELOG
Day2: |
16x |
676
|
Sat Dec 14 11:52:42 2024 |
TD | Saturday 14 December |
11:00 Visual inspection FEE64 adaptor PCBs
& cabling
|
27x |
675
|
Wed Dec 11 14:46:21 2024 |
TD, JB, CC, MP | Mounting of AIDA, bPlast and BB7 for test | Snout assembled for detector position and
timing test.
The planned test is to use a BGO |
|
674
|
Mon Dec 9 12:28:01 2024 |
NH, CC, MP | Test of BB7 on AIDA Electronics | BB7 connected to aida07, sitting in a cardboard
box
|
|
673
|
Thu Dec 5 11:18:46 2024 |
TD | Offline analysis S100 data files R21_0-R21_99 | Offline analysis of S100 data files R21_0
- R21_99 (162Eu setting)
|
23x |
672
|
Wed Dec 4 09:57:24 2024 |
TD | HISPEC DESPEC meeting presentation - November 2024 -0 Summary of AIDA performance 2024 | |
|
671
|
Tue Nov 19 11:24:25 2024 |
TD | Anydesk restarted remotely |
Anydesk restarted remotely per https://elog.ph.ed.ac.uk/CARME/489 |
|
670
|
Tue Nov 5 15:19:35 2024 |
TD | S505 offline analysis R5_780 - R5_814 | Offline analysis of data files S505/R5_780
- R5_814 (corresponding to MBS data files
73-74)
|
24x |
669
|
Wed Aug 14 12:40:11 2024 |
JB | Repaired DSSSD delivery 14.09.2024 | Three BB18-1000 triples AIDAs collected
on 14.09.2024
Find attached visual of the wafer |
11x |
668
|
Sun Jul 14 16:52:28 2024 |
TD | S181 R7_38-44 | |
7x |
667
|
Sun Jul 14 14:37:53 2024 |
TD | S181 R6_375-380 | |
6x |
666
|
Mon Jun 17 02:13:21 2024 |
TD | Monday 17 June | 03.11 DSSSD bias & leakage current OK - attachment
1
|
43x |
665
|
Sun Jun 16 03:11:27 2024 |
TD | Sunday 16 June | 04.08 DSSSD bias & leakage current OK - attachment
1
|
26x |
664
|
Sat Jun 15 00:28:01 2024 |
TD | Saturday 15 June | Beam lost due to septum failure c. 18.15 Friday
14 June
|
45x |
663
|
Fri Jun 14 15:00:47 2024 |
Norah , Muneerah | 16:00-20:00 Friday 14 June | Everything appears to be running
smoothly. Attachments 1-4 were taken around
16:00 |
13x |
662
|
Fri Jun 14 06:22:39 2024 |
TD | 08:00-16:00 Friday 14 June |
07.23 All histograms & stats zero'd
|
23x |
661
|
Thu Jun 13 23:04:01 2024 |
Dan Judson, TD | 0.00-8.00 14/6/24 | 0.00 checks - all looks ok
Voltage/currents - attachment 1
Rates attachment 2 + 3 |
40x |
660
|
Thu Jun 13 21:06:44 2024 |
Robert Page | 16:00 to 00:00 shift on 13/6/2024 | Elog went down around the end of the last
shift, so final screenshots were not uploaded
at that point. |
26x |